945 resultados para Infrastructure Projects


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Risk management in software engineering has become a recognized project management practice but it seems that not all companies are systematically applying it. At the same time, agile methods have become popular, partly because proponents claim that agile methods implicitly reduce risks due
to, for example, more frequent and earlier feedback, shorter periods of development time and easier prediction of cost. Therefore, there is a need to investigate how risk management can be usable in iterative and evolutionary software development processes. This paper investigates the gathering of empirical data on risk management from the project environment and presents
a novel approach to manage risk in agile projects. Our approach is based on a prototype tool, Agile Risk Tool (ART). This tool reduces human effort in risk management by using software agents to identify, assess and monitor risk, based on input and data collected from the project environment and by applying
some designated rules. As validation, groups of student project data were used to provide evidence of the efficacy of this approach. We demonstrate the approach and the feasibility of using a lightweight risk management tool to alert, assess and monitor risk with reduced human effort.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Prior research on NGO accountability argued that in the process of upward accountability to donors NGOs’ accountability towards beneficiaries had been compromised. With a focus on beneficiary accountability this paper undertakes a comparative examination of a donor funded project and a non-donor funded project. The study has been carried out in the context of a large Bangladeshi NGO with international operations. While the above conclusion on NGO accountability generally holds our study shows a somewhat different picture. Drawing on a comprehensive set of empirical evidence from various sources such as documentary analysis, interviews, focus groups and observations we show that beneficiary accountability can be better in donor funded projects as compared to non-donor funded projects. We theorise the circumstances under which it can happen. This finding has significant implications for the policy makers and donors in the context of recent drive for the self-sustainability of NGOs and its impact on the crucial issue of beneficiary accountability.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

At the formation of the new Republic of Ireland, the construction of new infrastructures was seen as an essential element in the building of the new nation, just as the adoption of international style modernism in architecture was perceived as a way to escape the colonial past. Accordingly, infrastructure became the physical manifestation, the concrete identity of these objectives and architecture formed an integral part of this narrative. Moving between scales and from artefact to context, Infrastructure and the Architectures of Modernity in Ireland 1916-2016 provides critical insights and narratives on what is a complex and hitherto overlooked landscape, one which is often as much international as it is Irish. In doing so, it explores the interaction between the universalising and globalising tendencies of modernisation on one hand and the textures of local architectures on the other.

The book shows how the nature of technology and infrastructure is inherently cosmopolitan. Beginning with the building of the heroic Shannon hydro-electric facility at Ardnacrusha by the German firm of Siemens-Schuckert in the first decade of independence, Ireland became a point of varying types of intersection between imported international expertise and local need. Meanwhile, at the other end of the century, by the year 2000, Ireland had become one of the most globalized countries in the world, site of the European headquarters of multinationals such as Google and Microsoft. Climatically and economically expedient to the storing and harvesting of data, Ireland has subsequently become a repository of digital information farmed in large, single-storey sheds absorbed into anonymous suburbs. In 2013, it became the preferred site for Intel to design and develop its new microprocessor chip: the Galileo. The story of the decades in between, of shifts made manifest in architecture and infrastructure from the policies of economic protectionism, to the opening up of the country to direct foreign investment and the embracing of the EU, is one of the influx of technologies and cultural references into a small country on the edges of Europe as Ireland became both a launch-pad and testing ground for a series of aspects of designed modernity.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper describes the scientific aims and potentials as well as the preliminary technical design of IRIDE, an innovative tool for multi-disciplinary investigations in a wide field of scientific, technological and industrial applications. IRIDE will be a high intensity "particles factory", based on a combination of high duty cycle radio-frequency superconducting electron linacs and of high energy lasers. Conceived to provide unique research possibilities for particle physics, for condensed matter physics, chemistry and material science, for structural biology and industrial applications, IRIDE will open completely new research possibilities and advance our knowledge in many branches of science and technology. IRIDE is also supposed to be realized in subsequent stages of development depending on the assigned priorities. © 2013 Elsevier B.V.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Congenital anomalies (CA) are the paradigm example of rare diseases liable to primary prevention actions due to the multifactorial etiology of many of them, involving a number of environmental factors together with genetic predispositions. Yet despite the preventive potential, lack of attention to an integrated preventive strategy has led to the prevalence of CA remaining relatively stable in recent decades. The 2 European projects, EUROCAT and EUROPLAN, have joined efforts to provide the first science-based and comprehensive set of recommendations for the primary prevention of CA in the European Union. The resulting EUROCAT-EUROPLAN 'Recommendations on Policies to Be Considered for the Primary Prevention of Congenital Anomalies in National Plans and Strategies on Rare Diseases' were issued in 2012 and endorsed by EUCERD (European Union Committee of Experts on Rare Diseases) in 2013. The recommendations exploit interdisciplinary expertise encompassing drugs, diet, lifestyles, maternal health status, and the environment. The recommendations include evidence-based actions aimed at reducing risk factors and at increasing protective factors and behaviors at both individual and population level. Moreover, consideration is given to topics specifically related to CA (e.g. folate status, teratogens) as well as of broad public health impact (e.g. obesity, smoking) which call for specific attention to their relevance in the pre- and periconceptional period. The recommendations, reported entirely in this paper, are a comprehensive tool to implement primary prevention into national policies on rare diseases in Europe.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The levels of As and various other trace elements found in the irrigated agricultural soil (Tsoil) of southern Libya were compared with non-irrigated soil (Csoil) from the same sampling campaign collected between April and May 2008. The soil samples represented agronomic practice in the southern Libyan regions of Maknwessa (MAK), Aril (ARL) and Taswaa (TAS), and were analyzed by Inductively coupled plasma mass spectrometry (ICP-MS) for Co, Ni, Cu, Se, Mo, Zn, As, Pb, Cd and P. Concentrations of P and As in TAS and MAK were found to be higher in Tsoil compared to Csoil, while the opposite was true for ARL. In general, As concentrations in these areas were 2-3 times lower than the global average. In ARL, the average P concentrations of the Csoil samples were significantly higher than those of Tsoil samples: this site is composed mainly of pasture for animal production, where phosphate fertilizers are used regularly. Distance from the source of irrigation was found to be of an important influence on the heavy metal concentration of the soil, with greater concentrations found closer to the irrigation source. It can be concluded from the results that irrigation water contains elevated levels of As, which finds its way into the soil profile and can lead to accumulation of As in the soil over time.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

‘A free Ireland would drain the bogs, would harness the rivers, would plant the wastes, would nationalise the railways and the waterways, would improve agriculture, would protect fisheries, would foster industries, would promote commerce, and beautify the cities …’ (Padraig Pearse, ‘From a Hermitage’, 1913)

Somewhat unusually in his often romantic writings Padraig Pearse – poet, pedagogue and revolutionary – chose to describe the future of an independent Ireland in terms of infrastructure and technological processes. Terence Brown’s locating of this excerpt at the beginning his seminal work Ireland: A Social and Cultural History 1922-2002 highlights the simultaneous and interlinking construction of both a new physical and cultural landscape for an independent modern nation. Lacking any significant industrial complex, the construction of new infrastructures in Ireland was seen throughout the 20th century as a key element in the building of the new State, just as the adoption of an international style modernism in architecture was perceived as a way to escape the colonial past. For Paul N. Edwards modernity and infrastructure are intimately connected.

infrastructures simultaneously shape and are shaped – in other words, co-construct – the condition of modernity. By linking macro, meso, and micro scales of time, space and social organisation, they form the stable foundation of modern social worlds’ (2003: 186).
Simultaneously omnipresent and invisible – infra means beneath – Edwards also points out that infrastructure tends only to become apparent when it is either new or broken. Interpreting the meso scale as being that of the building, this session calls for papers that critically and analytically investigate aspects of the architectures of infrastructure in 20th-century Ireland. Like the territory they explore these papers may range across scales to oscillate between a concern for the artefact and its physical landscape, and the larger, often hidden systems and networks that co-define this architecture.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Gas fired generation currently plays an integral support role ensuring security of supply in power systems with high wind power penetrations due to its technical and economic attributes. However, the increase in variable wind power has affected the gas generation output profile and is pushing the boundaries of the design and operating envelope of gas infrastructure. This paper investigates the mutual dependence and interaction between electricity generation and gas systems through the first comprehensive joined-up, multi-vector energy system analysis for Ireland. Key findings reveal the high vulnerability of the Irish power system to outages on the Irish gas system. It has been shown that the economic operation of the power system can be severely impacted by gas infrastructure outages, resulting in an average system marginal price of up to €167/MWh from €67/MWh in the base case. It has also been shown that gas infrastructure outages pose problems for the location of power system reserve provision, with a 150% increase in provision across a power system transmission bottleneck. Wind forecast error was shown to be a significant cause for concern, resulting in large swings in gas demand requiring key gas infrastructure to operate at close to 100% capacity. These findings are thought to increase in prominence as the installation of wind capacity increases towards 2020, placing further stress on both power and gas systems to maintain security of supply.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Considering the confined and complex nature of urban construction projects, labor productivity is one of the key factors attributing to project success. With the proliferation of sub-contracted labor, there is a necessity to consider the ramifications of this practice to the sector. This research aims to outline how project managers can optimise productivity levels of sub-contracted labor in urban construction projects, by addressing the barriers that most restrict these efficiency levels. A qualitative research approach is employed, incorporating semi-structured interviews based on three case studies from an urban context. The results are scrutinised using mind mapping software and accompanying analytical techniques. The findings from this research indicate that the effective on-site management of sub-contracted labor has a significant impact on the degree of success of an urban development project. The two core barriers to sub-contracted labor productivity are; 1) ineffective supervision of sub-contracted labor, and 2) lack of skilled sub-contracted labor. The implication of this research is that on-site project management play an integral role in the level of productivity achieved by sub-contracted labor in urban development projects. Therefore, on-site management situated in urban, confined construction sites, are encouraged to take heed of the findings herein and address the barriers documented. The value of this research is obtained through consideration of the critical factors; construction management professionals can mitigate such barriers, in order to optimise subcontracted labor productivity on-site.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Walking is the most common form of moderate‐intensity physical activity among adults, is widely accessible and especially appealing to obese people. Most often policy makers are interested in valuing the effect on walking of changes in some characteristics of a neighbourhood, the demand response for walking, of infrastructure changes. A positive demand response to improvements in the walking environment could help meet the public health target of 150 minutes of at least moderate‐intensity physical activity per week. We model walking in an individual’s local neighbourhood as a ‘weak complement’ to the characteristics of the neighbourhood itself. Walking is affected by neighbourhood
characteristics, substitutes, and individual’s characteristics, including their opportunity cost of time.  Using compensating variation, we assess the economic benefits of walking and how walking behaviour is affected by improvements to the neighbourhood.  Using a sample of 1,209 respondents surveyed over a 12 month period (Feb 2010‐Jan 2011) in East Belfast, United Kingdom, we find that a policy that increased walkability and people’s perception of access to shops and facilities  would lead to an increase in walking of about 36 minutes/person/week, valued at £13.65/person/week. When focusing on inactive residents, a policy that improved the walkability of the area would lead to guidelines for physical activity being reached by only 12.8% of the population who are currently inactive. Additional interventions would therefore be needed to encourage inactive residents to
achieve the recommended levels of physical activity, as it appears that interventions that improve the walkability of an area are particularly effective in increasing walking among already active citizens, and, among the inactive ones, the best response is found among healthier, younger and wealthier citizens.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The management of public sector risk is increasingly seen as a priority area of UK government policy. This has been highlighted recently by the Prime Minister Gordon Brown who stated that “the issue of public risk is one of the most challenging areas of policy-making for any government” (Strategic Risk, 2008). In response to these challenges, the UK Prime Minister has appointed a new body - the Risk and Regulation Advisory Council (RRAC) which is tasked with improving the way risk to the public is understood and managed. One area of particular concern with regard to the governance of public sector risks involves projects procured via the Private Finance Initiative (PFI). These projects involve long-term contracts, complex multi-party interactions and thus create various risks to public sector clients. Today, most PFI actors acknowledge the potentially adverse effects of these risks and make an effort to prevent or mitigate undesirable results. As a consequence, issues of risk allocation, risk transfer and risk management have become central to the PFI procurement process. This paper provides an overview of the risk categories and risk types which are relevant to the public sector in PFI projects. It analyses risk as a feature of uncertain future project-related events and examines potential pitfalls which can be associated with PFI risk management on the basis of a case study of a high-profile PFI hospital in Scotland. The paper concludes that, despite the trend towards diminished risk profiles during the operational phase, the public sector continues to be exposed to significant risks when engaging in PFI-based procurement.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

During the past twenty years, the UK has relied heavily on Public Private Partnerships (PPP) and especially the Private Finance Initiative in the procurement of infrastructure and services. Discussing the causes of the credit crunch and its effects on PPP, this paper notes that the provision of new public sector infrastructure and related services has been adversely affected by the impact of the credit crunch on Private Finance Initiatives (PFIs). These problems have arisen primarily from the unwillingness of commercial banks to replace collapsed PFI bond financing unless new PFI contracts reduce financial risks; which, in turn, is likely to increase the cost of these projects to the public sector. Additional financial strains have arisen for the UK government from the need to bail out collapsed PFI projects. Overall we find evidence that the UK commitment to PFI has not only increased immediate fiscal pressures on the UK when these have become least palatable, but has also created fiscal vulnerabilities at local and national levels which are likely to hamper the country’s ability to launch counter-cyclical responses to the ongoing crisis.