994 resultados para Illinois Liquor Control Commission.
Resumo:
"October, 1985."
Resumo:
"Final Report, November 1997-October 1999."
Resumo:
Caption title.
Resumo:
Mode of access: Internet.
Resumo:
Cover title.
Resumo:
"Prepared by Karl B. Lohmann."
Resumo:
"Prepared for State of Illinois, Department of Transportation, Division of Water Resources."
Resumo:
"ILENR/BE-87/01."
Resumo:
"This publication was supported in part by Grant/Cooperative Agreement US50/CCU523303-04 and Early Hearing Detection and Intervention Award UR#CC1520048 from the U.S. Centers for Disease Control and Prevention. ..."--Leaf ii.
Resumo:
Description based on: 2000 edition.
Resumo:
Report by the Illinois Office of Water Resources on Phases III & IV of a flood hazard mitigation project in Rosemont, Illinois. Phase III of the Willow-Higgins Flood Mitigation Project consists of widening and improving a 340-foot reach of Willow-Higgins Creek upstream of River Road. The improvement will include the replacement of 340 lineal feet of vertical floodwall along both sides of Willow-Higgins Creek. Phase IV of the Willow-Higgins Flood Mitigation Project consists of widening and improving a reach of Willow-Higgins Creek between the downstream end of Phase II, which is 2565 feet downstream of Higgins Road, and Granville Road; and also between Willow Creek Road and a point 160 feet downstream of Willow Creek Road. The improvement will include placement of 2200 lineal feet of vertical floodwall along the north side of Willow-Higgins Creek and 160 feet of vertical floodwall along both sides of Willow-Higgins Creek downstream of Willow Creek Road.
Resumo:
"OWR/PPS/98-003."
Resumo:
Includes 87 or more reports on individual lakes in Illinois; some will be updated periodically.
Resumo:
"This project is being done under the authority given by the Flood Control Act of 1945 (Ill. Rev. Stat. 1989, ch. 19, par. 126a et seq.)--leaf 1.
Resumo:
Cover title.