994 resultados para County finance and audits


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Report on a special investigation of the Fairfield Parks and Recreation Department (Parks and Recreation) for the period January 1, 2007 through April 8, 2008

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Audit report on the City of Durant, Iowa for the years ended June 30, 2008 and 2007

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Does financial development result in capital being reallocated more rapidly to industries where it is most productive? We argue that if this was the case, financially developed countries should see faster growth in industries with investment opportunities due to global demand and productivity shifts. Testing this cross-industry cross-country growth implication requires proxies for (latent) global industry investment opportunities. We show that tests relying only on data from specific (benchmark) countries may yield spurious evidence for or against the hypothesis. We therefore develop an alternative approach that combines benchmark-country proxies with a proxy that does not reflect opportunities specific to a country or level of financial development. Our empirical results yield clear support for the capital reallocation hypothesis.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Audit report on the City of Pomeroy, Iowa for the years ended June 30, 2008 and 2007

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Compilation report on the City of Sabula, Iowa, for the six months ended December 31, 2008 and the year ended June 30, 2008

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Reaudit letter to the City of Ottumwa for the period July 1, 2005 through June 30, 2006, as well as certain issues applicable to the year ended June 30, 2005 and subsequent periods

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Audit report on the City of Elkport, Iowa for the years ended June 30, 2006 and 2007

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Report on a special investigation of the Rodman Volunteer Fire Department and Park and Recreation Department for the period January 1, 2006 through September 30, 2009

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Audit report on the City of Guttenberg, Iowa, for the years ended June 30, 2009 and 2008

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Audit report on the City of Griswold, Iowa for the years ended June 30, 2010 and 2009

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Special investigation of the City of Humboldt and Mid Iowa Growth Partnership for the period January 1, 2007 through June 10, 2010

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Report on applying agreed-upon procedures to the Villisca Municipal Power Plant’s accounting procedures, cash and investment balances and compliance with Code of Iowa requirements for the period February 1, 2007 through December 31, 2010

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Iowa Department of Transportation (Iowa DOT), Nebraska Department of Roads (NDOR), and the Federal Highway Administration (FHWA) are proposing to improve the interstate system around Council Bluffs with improvements extending across the Missouri River on I-80 to east of the I-480 interchange in Omaha, Nebraska, see Figure 1-1. The study considers long-term, broad-based transportation improvements along I-80, I-29, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system1, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. These improvements, once implemented, would bring the segments of I-80 and I-29 up to current engineering standards and modernize the roadway to accommodate future traffic needs. In 2001, Iowa DOT and FHWA initiated the Council Bluffs Interstate System (CBIS) Improvements Project. The agencies concluded that the environmental study process would be conducted in two stages; that is, a tiered approach would be applied. The project is being conducted pursuant to the National Environmental Policy Act (NEPA) regulations issued by the Council on Environmental Quality (CEQ), 40 Code of Federal Regulations (CFR) Part 1502.20, and FHWA 23 CFR Part 771.111, that permit tiering for large, complex NEPA studies. Tier 1 is an examination of the overall interstate system improvement needs, including a clear explanation of the area’s transportation needs, a study of alternatives to satisfy them, and broad consideration of potential environmental and social impacts. The Tier 1 evaluation is at a sufficient level of engineering and environmental detail to assist decision makers in selecting a preferred transportation strategy. Tier 1 includes preparation of a draft and final Environmental Impact Statement (EIS) that would disclose the potential environmental and social effects (evaluated at a planning level that considers a variety of conceptual designs) of the proposed improvements. The final EIS will conclude with a Record of Decision (ROD) that states the preferred plan for improvements to be implemented. Essentially, the Tier 1 document will establish the planning framework for the needed improvements. Because the scope of the overall system improvements is large, the interstate improvements would be implemented as a series of individual projects that fit into the overall planning framework. The Tier 1 Area of Potential Impact, which is discussed in detail in Section 4 is an alternative that considers a combination of the most reasonable concepts that have been developed, buffered by approximately 100 or more feet to ensure that any Tier 2 design modifications would remain inside the outer boundary.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Iowa Department of Transportation (Iowa DOT), Nebraska Department of Roads (NDOR), and the Federal Highway Administration (FHWA) are proposing improvements to the interstate system in the Omaha/Council Bluffs metropolitan area, extending across the Missouri River on Interstate 80 (I-80) to east of the Interstate 480 (I-480) interchange in Omaha, Nebraska (see Figure 1-1). The study considers long-term, broad-base transportation improvements along Interstate I-29 (I-29), I-80, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system1, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. These improvements, once implemented, would bring the segments of I-80 and I-29 up to current engineering standards and modernize the roadway to accommodate future traffic needs.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Iowa Department of Transportation (Iowa DOT), Nebraska Department of Roads (NDOR), and the Federal Highway Administration (FHWA) are proposing improvements to the interstate system in the Omaha/Council Bluffs metropolitan area, extending across the Missouri River on Interstate 80 (I-80) to east of the Interstate 480 (I-480) interchange in Omaha, Nebraska (see Figure 1-1). The study considers long-term, broad-base transportation improvements along Interstate I-29 (I-29), I-80, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system1, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. These improvements, once implemented, would bring the segments of I-80 and I-29 up to current engineering standards and modernize the roadway to accommodate future traffic needs.