933 resultados para Construction industry Environmental aspects


Relevância:

100.00% 100.00%

Publicador:

Resumo:

In line with developments overseas Australian clients are turning to considerations of value in project procurement. Until the 1980s the industry operated in a largely traditional manner however the extremely adversarial behaviour exhibited during towards the end of the decade led to a number of significant events and initiatives including the publication of “No Dispute”, the Gyles Royal Commission into the Building Industry, the Construction Industry Development Agency (CIDA) and the work of the Australian Procurement and Construction Council (APCC). A number of research projects in progress in the CRC for Construction Innovation (CRC CI) are focussing on the assessment of value and methodologies to support the delivery of value in the procurement and management of engineering and construction projects. This paper charts the emergence of several key drivers in the process and illustrates how they can be integrated into a comprehensive Decision Support System that balances value to stakeholders with project imperatives and incorporates a lessons learned data base which enriches the decision making process to optimise delivery method design and selection.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry is a key national economic component. It tends to be at the forefront of cyclic changes in the Australian economy. It has a significant impact, both directly and indirectly, on the efficiency and productivity of other industries. Moreover it affects everyone to a greater or lesser extent; through its products whether they are manifested in the physical infrastructure that supports the operation of the economy or through the built environment that directly impacts on the quality of life experienced by individuals. In financial terms the industry makes one of the largest contributions to the Australian economy, accounting for 4.7 per cent of GDP 1 which was worth over $30B in 20012. The construction industry is comprised of a myriad of small firms, across several important sectors including, o Residential building, o Commercial building, o Building services, o Engineering, o Infrastructure o Facilities Management o Property Development Each sector is typified by firms that have distinctive characteristics such as the number of employees, size and value of contracts, number of jobs, and so forth. It tends to be the case that firms operating in commercial building are larger than those involved in residential construction. The largest contractors are found in engineering and infrastructure, as well as in the commercial building sub-sectors. However all sectors are characterised by their reliance upon sub-contractors to carry out on-site operations. Professionals from the various design consultant groups operate across all of these sectors. This description masks one of the most significant underlying causes of inefficiency in the construction industry, namely its fragmentation. The Construction Industry chapter of the 2004 Australian Year Book3, published by the Australian Bureau of Statistics unmasks the industry’s fragmented structure, typified by the large number of operating businesses within it, the vast majority of which are small companies employing less than 5 people. It identifies over 190,000 firms, of which over 90 percent employ less than 5 people. At the other end of the spectrum, firms employing 20 or more people account for fractionally more than one percent of businesses in the industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The need to “reduce red tape” and regulatory inconsistencies is a desirable outcome (OECD 1997) for developed countries. The costs normally associated with regulatory regimes are compliance costs and direct charges. Geiger and Hoffman (1998) have noted that the extent of regulation in an industry tends to be negatively associated with firm performance. Typically, approaches to estimation of the cost of regulations examine direct costs, such as fees and charges, together with indirect costs, such as compliance costs. However, in a fragmented system, such as Australia, costs can also be incurred due to procedural delays, either by government, or by industry having to adapt documentation for different spheres of government; lack of predictable outcomes, with variations occurring between spheres of government and sometimes within the same government agency; and lost business opportunities, with delays and red tape preventing realisation of business opportunities (OECD 1997). In this submission these costs are termed adaptation costs. The adaptation costs of complying with variations in regulations between the states has been estimated by the Building Product Innovation Council (2003) as being up to $600 million per annum for building product manufacturers alone. Productivity gains from increased harmonisation of the regulatory system have been estimated in the hundreds of millions of dollars (ABCB 2003). This argument is supported by international research which found that increasing the harmonisation of legislation in a federal system of government reduces what we have termed adaptation costs (OECD 2001). Research reports into the construction industry in Australia have likewise argued that improved consistency in the regulatory environment could lead to improvements in innovation (PriceWaterhouseCoopers 2002), and that research into this area should be given high priority (Hampson & Brandon 2004). The opinion of industry in Australia has consistently held that the current regulatory environment inhibits innovation (Manley 2004). As a first step in advancing improvements to the current situation, a summary of the current costs experienced by industry needs to be articulated. This executive summary seeks to outline these costs in the hope that the Productivity Commission would be able to identify the best tools to quantify the actual costs to industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

As with any strategic planning process, evidence-based estimates are needed to plan effectively for the future. Comments below are based upon data drawn from the Brisbane Long Term Infrastructure Plan (Department of Local Government, Planning, Sport and Recreation, 2005) and the Brisbane Long Term Planning Economic Indicators (National Institute of Economic and Industry Research, 2005), as these are cited as the underpinning research for the economic plan. This submission focuses on one critical aspect of the strategic plan — the relationship between population growth, employment growth, and infrastructure provision. While the focus of the strategic plan is on the changes which would occur within Brisbane, it is important that consideration of predicted changes in surrounding local government areas be also carried out.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Off-site manufacture (OSM) offers numerous benefits to all parties in the construction process. The uptake of OSM in Australia has, however, been limited. This limited uptake corresponds to similar trends in the UK and US, although the level of OSM there appears to be increasing. This project undertook three workshops — one each in Victoria, Queensland and Western Australia — and 18 interviews with key stakeholders to assist in identifying the general benefits and barriers to OSM uptake in the Australian construction industry. Seven case studies were also undertaken, involving construction projects that used OSM, ranging from civil projects through to residential. Each of these case studies has been analysed to identify what worked and what didn’t, and suggest the lessons to be learned from each project.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Much has been written on Off-site Manufacture (OSM) in construction, particularly regarding the perceived benefits and barriers to implementation. However, very little understanding of the state of OSM in the Australian construction industry exists. A ‘scoping study' has recently been undertaken to determine the ‘state-of-the-art’ of OSM in Australia. This involved several industry workshops, interviews and case studies across four major states of Australia. The study surveyed a range of suppliers across the construction supply-chain, incorporating the civil, commercial and housing segments of the market. This revealed that skills shortages and lack of adequate OSM knowledge are generally the greatest issues facing OSM in Australia. The drivers and constraints that emerged from the research were, in large measure, consistent with those found in the US and UK, although some Australian anomalies are evident, such as the geographical disparity of markets. A comparative analysis with similar studies in the UK and US is reported, illustrating both the drivers and constraints confronting the industry in Australia. OSM uptake into the future is however dependent on many factors, not least of which is a better understanding of the construction process and its associated costs.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

After many years of development BIM (Building Information Modelling) is starting to achieve significant penetration into the building sector of the construction industry. This paper describes the current status of BIM and the drivers that are motivating the change from 2D CAD to BIM within the building sector. The paper then discusses what the implications of the technology underlying BIM may be for the civil construction sector of the construction industry. A project carried out by the Cooperative Research Centre for Construction Innovation is used as an example of this technology as well as several international examples.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Safety Effectiveness Indicators (SEI) Project has used extensive research to determine what safety effectiveness measures can be developed by industry, for industry use to improve its safety performance. These indicators can measure how effectively the 13 safety management tasks1 (SMTs) selected for this workbook are undertaken. Currently, positive performance indicators (PPIs) are only able to measure the number of activities undertaken. They do not provide information on whether each activity is being undertaken effectively, and therefore do not provide data which can be used by industry to target areas of focus and improvement. The initial workbook contained six SMTs, and was piloted on various construction sites during August 2008. The workbook was refined through feedback from the pilot, and 13 SMTs were used in a field trial during the months of October, November and December 2008. The project team also carried out 12 focus groups in Brisbane, Canberra, Sydney and Melbourne during April, May and June 2008, and developed an initial format of this workbook through these groups and team workshops. Simplification of the language was a recurring theme, and we have attempted to do this throughout the project. The challenge has been to ensure we keep the descriptions short, to the point and relevant to all companies, without making them too specific. The majority of the construction industry participants also requested an alteration to the scale used, so a ‘Yes’/‘No’/’Not applicable’ format is used in this workbook. This workbook, based on industry feedback, is for use on site by various construction companies and contains 13 SMTs. However, you are invited to personalise the SEI tools to better suit your individual company and workplaces.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Cohen (1977) reviewed the then current research on occupational safety and stated that both strong company commitment to safety, and communication between all levels of a company are the most influential factors to improving safety. Other relevant factors included careful selection of staff, and early and continuous training throughout the lifetime with the company. These continue to be important factors in OHS today. There has been a continued decrease in the injury rates since Cohen’s review within the Australian construction industry, however, the construction industry has far more injuries and ill-health than the Australian average, with one fatality occurring on average per week in the Australian Construction Industry. The Fatality rate in the building and construction industry remains three times higher than the national average, and 15% of all industry fatalities are in the building and construction industry. In addition the construction industry pays one of the highest workers’ compensation premium rates – in 2001 alone approximately 0.5% ($267 million) of revenue would have to be allocated to the direct cost of 1998/99 compensations (Office of the Federal Safety Commissioner, 2006). Based on these statistics there is a need to measure and improve safety performance within the construction industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Effective knowledge transfer can prevent the reinvention of systems and ideas as well as the repetition of errors. Doing so will save substantial time, as well as contribute to better performance of projects and project-based organisations (PBOs). Despite the importance of knowledge, PBOs face serious barriers to the effective transfer of knowledge, while their characteristics, such as unique and innovative approaches taken during every project, mean they have much to gain from knowledge transfer. As each new project starts, there is the strong potential to reinvent the process, rather than utilise learning from previous projects. In fact, rework is one of the primary factors contributing to construction industry's poor performance and productivity. Current literature has identified several barriers to knowledge transfer in organisational settings in general, and not specifically PBOs. However, PBOs significantly differ from other types of organisations. PBOs operate mainly on temporary projects, where time is a crucial factor and people are more mobile than in other organisational settings. The aim of this research is to identify the key barriers that prevent effective knowledge transfer for PBOs, exclusively. Interviews with project managers and senior managers of PBOs complement the analysis of the literature and provide professional expertise. This research is crucial to gaining a better understanding of obstacles that hinder knowledge transfer in projects. The main contribution of this research is exclusive for PBO, list of key barriers that organisation and project managers need to consider to ensure effective knowledge transfer and better project management.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper will examine the intersection of design research and problem‐based teaching through the process and outcomes of a four year long ARC funded research project: the Emerging Futures Project. Sustainability is central to the project; in its overall content as well as in the broad aim of determining better outcomes for urban consolidation.   

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to examine the use of bid information, including both price and non-price factors in predicting the bidder’s performance. Design/methodology/approach – The practice of the industry was first reviewed. Data on bid evaluation and performance records of the successful bids were then obtained from the Hong Kong Housing Department, the largest housing provider in Hong Kong. This was followed by the development of a radial basis function (RBF) neural network based performance prediction model. Findings – It is found that public clients are more conscientious and include non-price factors in their bid evaluation equations. With the input variables used the information is available at the time of the bid and the output variable is the project performance score recorded during work in progress achieved by the successful bidder. It was found that past project performance score is the most sensitive input variable in predicting future performance. Research limitations/implications – The paper shows the inadequacy of using price alone for bid award criterion. The need for a systemic performance evaluation is also highlighted, as this information is highly instrumental for subsequent bid evaluations. The caveat for this study is that the prediction model was developed based on data obtained from one single source. Originality/value – The value of the paper is in the use of an RBF neural network as the prediction tool because it can model non-linear function. This capability avoids tedious ‘‘trial and error’’ in deciding the number of hidden layers to be used in the network model. Keywords Hong Kong, Construction industry, Neural nets, Modelling, Bid offer spreads Paper type Research paper

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose : Effective flow of data and communication at every stage of a construction project is essential for achieving required coordination and collaboration between the project participants, leading to successful management of the projects. In present scenario, when project participants are geographically separated, adoption of information communication technology (ICT) enables such effective communication. Thus, the purpose of this paper is to focus on ICT adoption for building project management.---------- Design/methodology/approach : It is difficult to quantitatively evaluate the benefits of ICT adoption in the multiple enterprise scenario of building project management. It requires qualitative analysis based on the perceptions of the construction professionals. The paper utilizes interpretive structural modeling (ISM) technique to assess importance of perceived benefits and their driving power and dependence on other benefits.---------- Findings : The developed ISM model shows that all the categories of benefits, i.e. benefits related to projects, team management, technology, and organization are inter-related and cannot be achieved in isolation. But, organization- and technology-related benefits have high-driving power and these are “strategic benefits” for the project team organizations. Thus, organizations are required to give more attention on strategically increasing these benefits from application of ICT. Originality/value – This analysis provides a road map to managers or project management organizations to decide that if they are planning ICT adoption for achieving certain benefits then which are the other driving benefits that should be achieved prior to that and also which are the dependent benefits that would be achieved by default.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This research aims to increase understanding of and delivery to qualitative (or intangible) outcomes and impacts of major economic infrastructure projects (i.e. bridges, roads, water infrastructure and the like), and the role of stakeholder engagement in this process.-------- Recent doctoral research completed at the Queensland University of Technology by the author investigated how the principles of corporate responsibility are applied in the construction sector. This related specifically to major economic infrastructure projects (hereafter referred to as major projects), with particular regard to urban transportation projects. One outcome of this past research was a value-mapping framework which enables organisations to track project outcomes to pre-existing corporate objectives, and report on these throughout the project life-cycle. Two recommendations for future research from that work formed the basis for this current research: • How can qualitative measurables be better integrated into decision-making on major economic infrastructure projects? • How can non-contractual stakeholders be more effectively engaged with on these projects? The link between these two areas may relate to the stakeholders’ role in qualitative indicator identification and measurement. This is a key point for future investigation.---------- The aim of this research is thus to further investigate these two areas, with the intent of (i) better defining the research direction; (ii) identifying potential research partners; and (iii) identify possible sources of future funding.