1000 resultados para Construcció anticausativa


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Universities must motivate future professionals so that they are able to apply their experience over and beyond the scientific and technological context. These professionals should also be trained so that they are aware of the current position as regards the economy and limited energy resources, and they must be creative, knowledgeable and committed if they are to rethink the current model.The Departments of Architectural Technology II and Applied Physics, in collaboration with the Interdisciplinary Centre of Technology, Innovation and Education for Sustainability (CITIES), believed that students could be given the opportunity to specialise in the area of sustainable development by means of their final theses [2]. With this objective in mind, a line of theses called Energy Assessments was created as part of the Plan for Resource Consumption Efficiency (PECR). The line was based on a learning strategy that focused on the student.The teaching staff was able to observe that, in terms of cognitive aspects, the students improved their knowledge of environmental issues and the associated skills, and that they were more able to solve problems in the area of sustainability and had greater concerns about this subject matter after having completed their theses.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This article summarizes the main achievementsof the Multi-Element Transmit andReceive Antennas (METRA) Project, an ISTresearch and technological development project carried out between January 2000 and June 2001 by Universitat Politècnica de Catalunya, the Center for Personkommunikation of Aalborg University, Nokia Networks, Nokia Mobile Phones, and Vodafone Group Research and Development.The main objective of METRA was the performanceevaluation of multi-antenna terminals incombination with adaptive antennas at the basestation in UMTS communication systems. 1 AMIMO channel sounder was developed that providedrealistic multi-antenna channel measurements.Using these measured data, stochasticchannel models were developed and properly validated.These models were also evaluated inorder to estimate their corresponding channelcapacity. Different MIMO configurations andprocessing schemes were developed for both theFDD and TDD modes of UTRA, and their linkperformance was assessed. Performance evaluationwas completed by system simulations thatillustrated the benefits of MIMO configurationsto the network operator. Implementation cost vs.performance improvement was also covered bythe project, including the base station and terminalmanufacturer and network operator viewpoints.Finally, significant standards contributionswere generated by the project and presented to the pertinent 3GPP working groups.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The application of adaptive antenna techniques to fixed-architecture base stations has been shown to offer wide-ranging benefits, including interference rejection capabilities or increased coverage and spectral efficiency.Unfortunately, the actual implementation ofthese techniques to mobile communication scenarios has traditionally been set back by two fundamental reasons. On one hand, the lack of flexibility of current transceiver architectures does not allow for the introduction of advanced add-on functionalities. On the other hand, theoften oversimplified models for the spatiotemporal characteristics of the radio communications channel generally give rise toperformance predictions that are, in practice, too optimistic. The advent of software radio architectures represents a big step toward theintroduction of advanced receive/transmitcapabilities. Thanks to their inherent flexibilityand robustness, software radio architecturesare the appropriate enabling technology for theimplementation of array processing techniques.Moreover, given the exponential progression ofcommunication standards in coexistence andtheir constant evolution, software reconfigurabilitywill probably soon become the only costefficientalternative for the transceiverupgrade. This article analyzes the requirementsfor the introduction of software radio techniquesand array processing architectures inmultistandard scenarios. It basically summarizesthe conclusions and results obtained withinthe ACTS project SUNBEAM,1 proposingalgorithms and analyzing the feasibility ofimplementation of innovative and softwarereconfigurablearray processing architectures inmultistandard settings.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The well-known structure of an array combiner along with a maximum likelihood sequence estimator (MLSE) receiveris the basis for the derivation of a space-time processor presentinggood properties in terms of co-channel and intersymbol interferencerejection. The use of spatial diversity at the receiver front-endtogether with a scalar MLSE implies a joint design of the spatialcombiner and the impulse response for the sequence detector. Thisis faced using the MMSE criterion under the constraint that thedesired user signal power is not cancelled, yielding an impulse responsefor the sequence detector that is matched to the channel andcombiner response. The procedure maximizes the signal-to-noiseratio at the input of the detector and exhibits excellent performancein realistic multipath channels.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

El projecte contempla la resolució d’un Centre Operatiu d’Autobusos Metropolitans amb un programa que ha de donar cabuda a un mínim de 300 places d’aparcament de diferents mesures, tallers de manteniment, túnels de neteja, sortidors de repostatge, vestuaris, administració, oficines i serveis generals. L’emplaçament se situa en el barri de Sant Cosme del Prat de Llobregat, en un solar que esdevé la façana d’aquesta població a l’entrada a Barcelona des de l’aeroport. L’entorn el conformen els espais de protecció de les pistes que es perllonguen fins a tocar el Parc Natural del Delta del Llobregat, una zona humida protegida d’àmbit europeu. Al mateix temps, els requeriments del concurs sol•liciten mantenir un 50% de la superfície del solar com a parc urbà. Això comporta abordar la resolució d’un edifici extens, però de 3 alçades i mitja, per tal de poder encabir tot el programa. Tot i així, la proposta integra el gran volum de l’edificació en harmonia compositiva i cromàtica amb el canyissar i manté l’alçària en una cota similar a la dels edificis de l’entorn. L’àrea verda es concentra en la part de la parcel•la que té continuïtat directe amb el pati del nou Esplai del barri, per tal de optimitzar-ne l’ús. Al mateix temps, les àrees de circulació, neteja i manteniment dels autobusos se situen a la part posterior del solar, per fer-les compatibles amb la resta de requeriments funcionals i perquè la volumetria principal doni front a les vies d’entrada a l’àrea metropolitana. La cotxera està continguda en un únic volum lleugerament soterrat, per limitar l’alçària total. La construcció principal, de 120 x 55 x 14,5 metres, es troba configurada per una estructura regular que respecta les mesures i moviments dels autobusos, i per una pell consistent en una gelosia oberta en tres cares, i tancada en l’alçat nord. Aquest tancament es realitza amb prismes verticals de colors similars a la vegetació del entorn, separats harmònicament per tal de dissoldre lleument els contorns del volum. Com a contrapunt a la gran peça principal, es proposa un petit edifici vidriat que indica l’entrada a les oficines i conté les activitats administratives.Les àrees de funcionament es resumeixen en les següents:1. La circulació dels autobusos: el conjunt disposa de tres vies simultànies, una d’accés i dues de sortida, situades en línia amb dos punts de repostatge, aspiració interior i traspàs de dades i recaptacions, aptes per a ser utilitzades per tres vehicles alhora. També es disposen tres túnels de rentat previs a l’entrada a l’interior de la cotxera, amb pas per a tres carrils en by-pass. Es preveu una quarta via especial d’accés i sortida directes al taller, per situacions extraordinàries.2. La circulació dels vehicles de personal: tenen un accés i un recorregut independent al dels autobusos, amb control informatitzat. 3. La entrada peatonal de visites o personal: l’edifici disposa també d’una entrada peatonal que es produeix des de la porta principal, situada en el front del edifici administratiu.4. El edifici principal: consta de diferents nivells. El Nivell 0, a cota –1,3 m. es troba ocupat per la zona d’aparcament de vehicles privats (98 uts), l’aparcament de minibusos (20 uts), el taller d’autobusos (23 uts standard amb ITV, 2 uts articulats, 1 ut pintura articulat, 2 uts reparcions sostres), i l’àrea d’explotació i de dependències per conductors (vestidors, àrea de descans, cafeteria i espais habitables).El Nivell 1, a cota 2,4 m. està ocupat per l’aparcament de 47 autobusos de 13 m. de llarg i per 20 autobusos de 15 m.El Nivell 2, a cota 4,8 m. l’ocupen 22 places d’autobusos de 15 m., 6 places d’articulats i 37 de 13 m.El Nivell 3, a cota 7,2 m. és idèntic al Nivell 1.El Nivell 4, és idèntic al Nivell 2 i permet que la rampa continuï fins a un Nivell 5 de coberta, que excepcionalment pot convertir-se en aparcament descobert de 67 autobusos de més.La proposta contempla amb fermesa criteris de Sostenibilitat. Aquests es centren en primer lloc en la sobrietat del projecte que garanteix una organització clara en quan a circulacions i rendiment del espai i que, per tant, no malbarata més recursos dels necessaris. En segon lloc, s’aprofiten al màxim la llum i la ventilació naturals i, al mateix temps, es genera la pròpia energia per millorar la eficiència. També es resol el re-processament dels residus generats pel complex, es re-aprofiten les aigües utilitzades en els vestuaris i oficines pel rentat dels vehicles, i s’emmagatzemen les aigües pluvials per tal de complementar la generació d’energia i per escalfar amb el sol aigua calenta de neteja. En tercer lloc, es té especial cura en l’impacte ambiental del edifici, procurant adequar-lo a l’estructura urbana tant en alineacions com el alçària. També s’evita la contaminació acústica apantallant el so intern per tal de no enviar-lo a les àrees habitades, s’endrecen els accessos dels autobusos des de la rotonda de la via pública per alterar el mínim el trànsit dels veïns, i es concentra l’àrea verda en la zona on es té més contacte amb l’activitat veïnal comunitària: l’Esplai del barri.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The supply voltage decrease and powerconsumption increase of modern ICs made the requirements for low voltage fluctuation caused by packaging and on-chip parasitic impedances more difficult to achieve. Most of the research works on the area assume that all the nodes of the chip are fed at thesame voltage, in such a way that the main cause of disturbance or fluctuation is the parasitic impedance of packaging. In the paper an approach to analyze the effect of high and fast current demands on the on-chip power supply network. First an approach to model the entire network by considering a homogeneous conductive foil is presented. The modification of the timing parameters of flipflops caused by spatial voltage drops through the IC surface are also investigated.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Articulo sobre la importancia de las energias renovables y su integración arquitectónica en el camino hacia una arquitectura sostenible. Descripción y evaluación del proyecto Fachada Solar SCHOTT Iberica.

Relevância:

10.00% 10.00%

Publicador:

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Peer reviewed

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Aquest projecte es du a terme amb la intenció de satisfer les necessitats d’ampliació de l’empresa MinProcess S.A dedicada al processat de minerals, principalment a la fabricació de Sulfat de Bari en pols.Un dels principals usos del Sulfat de Bari micronitzat és troba actualment a l’industria petrolera, on un80% de la producció mundial, s’utilitza en els processos de perforació com a mescla fluida per tal d’evitarexplosions originades per les friccions o per la presència de bosses de gas. La gran demanda d’aquestproducte a escala mundial comporta que les empreses productores s’equipin amb les instal∙lacions i lesinfraestructures necessàries per tal de cobrir les necessitats reals del mercat amb màxima competitivitat.L’empresa Min Process S.A dedicada a l’extracció i micronització de minerals, actualment disposa d’unesinstal∙lacions de 50.000m² destinades a produir 100.000 tones anuals de sulfat de bari micronitzatmitjançant diferents processos. El primer procés, es basa en una trituració o reducció de la granulometriade les partícules provinents dels jaciments i una posterior classificació o separació de les partícules demineral en funció de la seva mida. Seguidament, s’apliquen processos de concentrat i rentat ambl’objectiu de separar les impureses que acompanyen a la matèria prima, ja sigui a través de processos deconcentració gravimètrica, separacions magnètiques o triatges. Finalment, les últimes etapes deproducció es basen en processos d’assecatge i trituracions ultrafines a través de molins que transformenels minerals en partícules micromètriques o en forma de pols.Els equips dels que disposa actualment per assolir la producció requerida són molt rudimentaris i poceficients, amb l’existència d’una gran mancança sobretot en el primer procés de triturat i classificat, on nos’aconsegueix obtenir una mida de partícula òptima i suficientment controlada que garanteixi unaproducció constant i de qualitat, influint directament a una pèrdua d’eficiència dels processos posteriors.L’elevada competitivitat del mercat comporta que l’empresa realitzi una inversió per tal d’augmentar laproducció anual a 200.000 tones i millorar l’eficiència dels processos de fabricació, equipant‐se així, ambunes instal∙lacions de 61.000 m² d’envergadura total.El projecte té per finalitat dissenyar el procés adient per aconseguir una produccióconstant, òptima i eficient de l’etapa de triturat i classificat. En segon lloc, es dissenya una nova planta detriturat i classificat situada de forma annexa a la fàbrica existent i es redacten els documents necessarisper a procedir a l’execució de la construcció d’aquesta planta

Relevância:

10.00% 10.00%

Publicador:

Resumo:

L"article presenta l"entorn històric de les gramàtiques universals del segle xvii. Descriu el moviment cultural de l"abadia de Port-Royal, en els vessants religiós, polític, pedagògic i científic. Analitza els principis de la Grammaire générales et raisonne d"Antonie Arnauld i Claude Lancelot. Considera la relació de la gramàtica amb la Logique d"A. Aranuld i Pierre. Nicole. I examina la recepció que ha tingut la gramàtica de Port-Royal a la història de la Lingüística, en especial a partir de la tesi de Noam Chomsky sobre la lingüística cartesiana. La controvertida postura de Chomsky, rebutjada per la crítica, instrueix sobre els processos de construcció de la historiografia

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Malgrat la important revifalla que en els darrers anys han experimentat els estudis històrics, entre els quals cal incloure els d"història de l"art, centrats en l"antic bisbat, l"antic terme i la ciutat mateixa de Tortosa, avui encara resulta relativament escàs el coneixement que tenim tant dels materials de la construcció com dels mestres que van construir en aquest territori durant les èpoques medieval i moderna.1 Aquest breu estudi, basat en un únic document,2 pretén ser, simplement, una petita aportació a la història de l"arquitectura setcentista tortosina, i pretén serho en els dos vessants esmentats abans: el dels materials de la construcció i el dels mestres.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

My study is based on an ethnography of two groups of young people from working-class neighbourhoods in Barcelona. I was interested in researching the impact of Catalan language policies on the identities of young people of Spanish-speaking immigrant families. I sought to go beyond the constraints of traditional structuralist approaches in Sociolinguistics in order to make my analysis relevant to people working for gender equality, the promotion of the Catalan language, or other social causes. I combine ideas from Bakhtin, Bourdieu, Fairclough, Foucault and Goffman to build a dialectical, historical, process-centred perspective that conceptualises practices in terms of social and political struggles.I analyse young people's peer-group activities in terms of their significance for the construction of gender identities. I propose a variety of forms of masculinity and femininity according to the various ways in which members organised their gender displays in face-to-face interaction.I also show how their use of argot and dialectal Spanish was part of the processes whereby members defined their relationships, constructed particular subject positions in interaction and struggled to legitimate their own values.I explore the meanings constructed through Catalan and Spanish by looking into the code-switching practices of my participants. I analysed their talk in terms of narratives that present particular sequential dramatisations of events for conversational audiences. These narratives follow the expressive intention of the author, and are populated with multiple voices of animated characters. I argue that, in the groups I studied, Catalan was generally not used to animate the voices that were central to the identities of the peer-group, and particularly to masculine identities.In order to contextualise these practices within the wider society, I also look into the processes of language choice in face-to-face encounters. I argue that existing conventions made it difficult for people to find opportunities to speak Catalan. I also pointed to the difficulties that my participants had to find employment, which were particularly acute amongst the more politically aware individuals. I conclude that these young working-class people had little possibilities of investing in more egalitarian forms of identity given their lack of resources and opportunities to develop their identities in other social spaces, such as the workplace.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

L'objectiu del projecte és definir les característiques tècniques i les mesures derevegetació i adequació ambiental que s’han de portar a terme durant l’execució deles obres de recuperació de l’espai degradat per l’home, com a conseqüència dediverses actuacions realitzades, que han sotmès a un estat d’estrès la zona.Per a l’elaboració d’aquest projecte s’han tingut en compte les accions mésdeterminants que han comportat l’estat actual de la zona:- Activitat extractiva “Congostell”. Vilanova del Vallès (X,Y: 442527.2,4602558.8). Activitat extractiva establerta dins domini públic hidràulic. Ubicada, en la seva major part, al municipi de Vilanova del Vallès i enuna menor superfície, dins l’àmbit del projecte. Durant el període defuncionament de l’extractiva, es va extreure força material de la zona d’estudi. Actualment no està en actiu i no s’ha iniciat la restauració.- Obra civil “Projecte Artèria Planta del Ter – Estació de la Trinitat Tram II. LaRoca del Vallès – Montornés del Vallès”. És una obra consistent en el soterrament d’una canonada de diàmetre 2200mm per transport d’aigua i no contemplada en el Pla General d’Ordenació Municipal. - Obra civil “Projecte Artèria Planta del Ter – Estació de la Trinitat Tram II. La Roca del Vallès – Montornés del Vallès”. És una obra consistent en el soterrament d’una canonada de diàmetre 2200mm per transport d’aigua i no contemplada en el Pla General d’Ordenació Municipal. - Obra civil de la construcció del tren d’Alta Velocitat Espanyol (AVE),concretament la línia Madrid-Zaragoza-Barcelona-Frontera Francesa.S’utilitza part de l’àmbit d’estudi com acopi de terres sobrants de l’obra Aquestes activitats han afectat de forma desigual la zona on s’ubica el projecte. L’activitat extractiva i la canonada d’aigua han afectat directament el terreny, ja que tots els treballs de l’activitat han tingut lloc dins l’àmbit d’estudi, mentre que la construcció de l’AVE ha comportat el pas de camions per la zona i l’abocament de les terres.El promotor del projecte és l’Ajuntament de La Roca del Vallès (Vallès Oriental)