970 resultados para voltage distribution
Resumo:
BACKGROUND: We sought to investigate the relationship between infarct and dyssynchrony post- myocardial infarct (MI), in a porcine model. Mechanical dyssynchrony post-MI is associated with left ventricular (LV) remodeling and increased mortality. METHODS: Cine, gadolinium-contrast, and tagged cardiovascular magnetic resonance (CMR) were performed pre-MI, 9 ± 2 days (early post-MI), and 33 ± 10 days (late post-MI) post-MI in 6 pigs to characterize cardiac morphology, location and extent of MI, and regional mechanics. LV mechanics were assessed by circumferential strain (eC). Electro-anatomic mapping (EAM) was performed within 24 hrs of CMR and prior to sacrifice. RESULTS: Mean infarct size was 21 ± 4% of LV volume with evidence of post-MI remodeling. Global eC significantly decreased post MI (-27 ± 1.6% vs. -18 ± 2.5% (early) and -17 ± 2.7% (late), p < 0.0001) with no significant change in peri-MI and MI segments between early and late time-points. Time to peak strain (TTP) was significantly longer in MI, compared to normal and peri-MI segments, both early (440 ± 40 ms vs. 329 ± 40 ms and 332 ± 36 ms, respectively; p = 0.0002) and late post-MI (442 ± 63 ms vs. 321 ± 40 ms and 355 ± 61 ms, respectively; p = 0.012). The standard deviation of TTP in 16 segments (SD16) significantly increased post-MI: 28 ± 7 ms to 50 ± 10 ms (early, p = 0.012) to 54 ± 19 ms (late, p = 0.004), with no change between early and late post-MI time-points (p = 0.56). TTP was not related to reduction of segmental contractility. EAM revealed late electrical activation and greatly diminished conduction velocity in the infarct (5.7 ± 2.4 cm/s), when compared to peri-infarct (18.7 ± 10.3 cm/s) and remote myocardium (39 ± 20.5 cm/s). CONCLUSIONS: Mechanical dyssynchrony occurs early after MI and is the result of delayed electrical and mechanical activation in the infarct.
Resumo:
Through the history of Electrical Engineering education, vectorial and phasorial diagrams have been used as a fundamental learning tool. At present, computational power has replaced them by long data lists, the result of solving equation systems by means of numerical methods. In this sense, diagrams have been shifted to an academic background and although theoretically explained, they are not used in a practical way within specific examples. This fact may be against the understanding of the complex behavior of the electrical power systems by students. This article proposes a modification of the classical Perrine-Baum diagram construction to allowing both a more practical representation and a better understanding of the behavior of a high-voltage electric line under different levels of load. This modification allows, at the same time, the forecast of the obsolescence of this behavior and line’s loading capacity. Complementary, we evaluate the impact of this tool in the learning process showing comparative undergraduate results during three academic years
Resumo:
Neuroimaging studies typically compare experimental conditions using average brain responses, thereby overlooking the stimulus-related information conveyed by distributed spatio-temporal patterns of single-trial responses. Here, we take advantage of this rich information at a single-trial level to decode stimulus-related signals in two event-related potential (ERP) studies. Our method models the statistical distribution of the voltage topographies with a Gaussian Mixture Model (GMM), which reduces the dataset to a number of representative voltage topographies. The degree of presence of these topographies across trials at specific latencies is then used to classify experimental conditions. We tested the algorithm using a cross-validation procedure in two independent EEG datasets. In the first ERP study, we classified left- versus right-hemifield checkerboard stimuli for upper and lower visual hemifields. In a second ERP study, when functional differences cannot be assumed, we classified initial versus repeated presentations of visual objects. With minimal a priori information, the GMM model provides neurophysiologically interpretable features - vis à vis voltage topographies - as well as dynamic information about brain function. This method can in principle be applied to any ERP dataset testing the functional relevance of specific time periods for stimulus processing, the predictability of subject's behavior and cognitive states, and the discrimination between healthy and clinical populations.
Resumo:
The application of the three voltage level 20/1/0.4 distribution system in Finland has proved to be an economic solution to enhance the reability of electricity distribution. By using 1 kV voltage level between medium and low voltage networks, the improvement in reability could be reached especially inaerial lines networks. Also considerable savings in investment and outage costscould be archieved compared to the traditional distribution system. This master's thesis is focused on the describing the situation in Russian distribution netwoks and consequent analyses the possibility of applying 1000V distribution system in Russia. The goal is to investigate on the basis of Finnish experience is any possible installation targets in Russia for the new system. Compatibility with Russian safety and quality standards are also studied in this thesis.
Resumo:
Abstract The cardiac sodium channel Nav1.5 plays a key role in cardiac excitability and conduction. Its importance for normal cardiac function has been highlighted by descriptions of numerous mutations of SCN5A (the gene encoding Nav1.5), causing cardiac arrhythmias which can lead to sudden cardiac death. The general aim of my PhD research project has been to investigate the regulation of Nav1.5 along two main axes: (1) We obtained experimental evidence revealing an interaction between Nav1.5 and a multiprotein complex comprising dystrophin. The first part of this study reports the characterization of this interaction. (2) The second part of the study is dedicated to the regulation of the cardiac sodium channel by the mineralocorticoid hormone named aldosterone. (1) Early in this study, we showed that Nav1.5 C-terminus was associated with dystrophin and that this interaction was mediated by syntrophin proteins. We used dystrophin-deficient mdx5cv mice to study the role of this interaction. We reported that dystrophin deficiency led to a reduction of both Nav1.5 protein level and the sodium current (INa). We also found that mdx5cv mice displayed atrial and ventricular conduction defects. Our results also indicated that proteasome inhibitor MG132 treatment of mdx5cv mice rescued Nav1.5 protein level and INa in cardiac tissue. (2) We showed that aldosterone treatment of mice cardiomyocytes led to an increase of the sodium current with no modification of Nav1.5 transcript and protein level. Altogether, these results suggest that the sodium current can be increased by distribution of intracellular pools of protein to the plasma membrane (e.g. upon aldosterone stimulation) and that interaction with dystrophin multiprotein complex is required for the stabilization of the channel at the plasma membrane. Finally, we obtained preliminary results suggesting that the proteasome could regulate Nav1.5 in mdx5cv mice. This study defines regulatory mechanisms of Nav1.5 which could play an important role in cardiac arrhythmia and bring new insight in cardiac conduction alterations observed in patients with dystrophinopathies. Moreover, this work suggests that Brugada syndrome, and some of the cardiac alterations seen in Duchenne patients may be caused by overlapping molecular mechanisms leading to a reduction of the cardiac sodium current.
Resumo:
Distribution companies are facing numerous challenges in the near future. Regulation defines correlation between power quality and revenue cap. Companies have to take measures for reliability increase to successfully compete in modern conditions. Most of the failures seen by customers originate in medium voltage networks. Implementation of network automation is the very effective measure to reduce duration and number of outages, and consequently, outage costs. Topic of this diploma work is study of automation investments effect on outage costs and other reliability indices. Calculation model have been made to perform needed reliability calculations. Theoretical study of different automation scenarios has been done. Case feeder from actual distribution company has been studied and various renovation plans have been suggested. Network automation proved to be effective measure for increasing medium voltage network reliability.
Resumo:
Since it is virtually impossible to balance loads in three-phase system, unbalance in a varying degree exists almost in all distribution networks. The aim of the thesis is to analyze the impact of this unbalance subject to different configurations of distribution system and winding connection of the supplying transformer. Also impact of the voltage unbalance on the equipment is investigated. In order to make the investigation more visual, the following calculations have been conducted: - Unsymmetrical load in four-wire star connected network - Unsymmetrical load in four-wire star connected network with broken zero conductor (or three-wire network). - Unsymmetrical load when the supplying transformer is so-called zigzag transformer. PDF created
Resumo:
Electron transport in a self-consistent potential along a ballistic two-terminal conductor has been investigated. We have derived general formulas which describe the nonlinear current-voltage characteristics, differential conductance, and low-frequency current and voltage noise assuming an arbitrary distribution function and correlation properties of injected electrons. The analytical results have been obtained for a wide range of biases: from equilibrium to high values beyond the linear-response regime. The particular case of a three-dimensional Fermi-Dirac injection has been analyzed. We show that the Coulomb correlations are manifested in the negative excess voltage noise, i.e., the voltage fluctuations under high-field transport conditions can be less than in equilibrium.
Resumo:
Strategic development of distribution networks plays a key role in the asset management in electricity distribution companies. Owing to the capital-intensive nature of the field and longspan operations of companies, the significance of a strategy is emphasised. A well-devised strategy combines awareness of challenges posed by the operating environment and the future targets of the distribution company. Economic regulation, ageing infrastructure, scarcity of resources and tightening supply requirements with challenges created by the climate change put a pressure on the strategy work. On the other hand, technology development related to network automation and underground cabling assists in answering these challenges. This dissertation aims at developing process knowledge and establishing a methodological framework by which key issues related to network development can be addressed. Moreover, the work develops tools by which the effects of changes in the operating environment on the distribution business can be analysed in the strategy work. To this end, the work discusses certain characteristics of the distribution business and describes the strategy process at a principle level. Further, the work defines the subtasks in the strategy process and presents the key elements in the strategy work and long-term network planning. The work delineates the factors having either a direct or indirect effect on strategic planning and development needs in the networks; in particular, outage costs constitute an important part of the economic regulation of the distribution business, reliability being thus a key driver in network planning. The dissertation describes the methodology and tools applied to cost and reliability analyses in the strategy work. The work focuses on determination of the techno-economic feasibility of different network development technologies; these feasibility surveys are linked to the economic regulation model of the distribution business, in particular from the viewpoint of reliability of electricity supply and allowed return. The work introduces the asset management system developed for research purposes and to support the strategy work, the calculation elements of the system and initial data used in the network analysis. The key elements of this asset management system are utilised in the dissertation. Finally, the study addresses the stages of strategic decision-making and compilation of investment strategies. Further, the work illustrates implementation of strategic planning in an actual distribution company environment.
Resumo:
The demand for electricity is constantly growing in contemporary world and, in the same time, quality and reliability requirements are becoming more rigid. In addition, renewable sources of energy have been widely introduced for power generation, and they create specific challenges for the network. Consequently, new solution for distribution system is required, and Low Voltage Direct Current (LVDC) system is the proposed one. This thesis focuses on the investigation of specific cable features for low voltage direct current (LVDC) distribution system. The LVDC system is public ±750 VDC distribution system, which is currently being developed at Lappeen-ranta University of Technology. The aspects, considered in the thesis, are reliable and economic power transmission in distribution networks and possible power line communication in the LVDC cable.
Resumo:
The maximum realizable power throughput of power electronic converters may be limited or constrained by technical or economical considerations. One solution to this problemis to connect several power converter units in parallel. The parallel connection can be used to increase the current carrying capacity of the overall system beyond the ratings of individual power converter units. Thus, it is possible to use several lower-power converter units, produced in large quantities, as building blocks to construct high-power converters in a modular manner. High-power converters realized by using parallel connection are needed for example in multimegawatt wind power generation systems. Parallel connection of power converter units is also required in emerging applications such as photovoltaic and fuel cell power conversion. The parallel operation of power converter units is not, however, problem free. This is because parallel-operating units are subject to overcurrent stresses, which are caused by unequal load current sharing or currents that flow between the units. Commonly, the term ’circulatingcurrent’ is used to describe both the unequal load current sharing and the currents flowing between the units. Circulating currents, again, are caused by component tolerances and asynchronous operation of the parallel units. Parallel-operating units are also subject to stresses caused by unequal thermal stress distribution. Both of these problemscan, nevertheless, be handled with a proper circulating current control. To design an effective circulating current control system, we need information about circulating current dynamics. The dynamics of the circulating currents can be investigated by developing appropriate mathematical models. In this dissertation, circulating current models aredeveloped for two different types of parallel two-level three-phase inverter configurations. Themodels, which are developed for an arbitrary number of parallel units, provide a framework for analyzing circulating current generation mechanisms and developing circulating current control systems. In addition to developing circulating current models, modulation of parallel inverters is considered. It is illustrated that depending on the parallel inverter configuration and the modulation method applied, common-mode circulating currents may be excited as a consequence of the differential-mode circulating current control. To prevent the common-mode circulating currents that are caused by the modulation, a dual modulator method is introduced. The dual modulator basically consists of two independently operating modulators, the outputs of which eventually constitute the switching commands of the inverter. The two independently operating modulators are referred to as primary and secondary modulators. In its intended usage, the same voltage vector is fed to the primary modulators of each parallel unit, and the inputs of the secondary modulators are obtained from the circulating current controllers. To ensure that voltage commands obtained from the circulating current controllers are realizable, it must be guaranteed that the inverter is not driven into saturation by the primary modulator. The inverter saturation can be prevented by limiting the inputs of the primary and secondary modulators. Because of this, also a limitation algorithm is proposed. The operation of both the proposed dual modulator and the limitation algorithm is verified experimentally.
Resumo:
The Finnish electricity distribution sector, rural areas in particular, is facing major challenges because of the economic regulation, tightening supply security requirements and the ageing network asset. Therefore, the target in the distribution network planning and asset management is to develop and renovate the networks to meet these challenges in compliance with the regulations in an economically feasible way. Concerning supply security, the new Finnish Electricity Market Act limits the maximum duration of electricity supply interruptions to six hours in urban areas and 36 hours in rural areas. This has a significant impact on distribution network planning, especially in rural areas where the distribution networks typically require extensive modifications and renovations to meet the supply security requirements. This doctoral thesis introduces a methodology to analyse electricity distribution system development. The methodology is based on and combines elements of reliability analysis, asset management and economic regulation. The analysis results can be applied, for instance, to evaluate the development of distribution reliability and to consider actions to meet the tightening regulatory requirements. Thus, the methodology produces information for strategic decision-making so that DSOs can respond to challenges arising in the electricity distribution sector. The key contributions of the thesis are a network renovation concept for rural areas, an analysis to assess supply security, and an evaluation of the effects of economic regulation on the strategic network planning. In addition, the thesis demonstrates how the reliability aspect affects the placement of automation devices and how the reserve power can be arranged in a rural area network.
Resumo:
Communications play a key role in modern smart grids. New functionalities that make the grids ‘smart’ require the communication network to function properly. Data transmission between intelligent electric devices (IEDs) in the rectifier and the customer-end inverters (CEIs) used for power conversion is also required in the smart grid concept of the low-voltage direct current (LVDC) distribution network. Smart grid applications, such as smart metering, demand side management (DSM), and grid protection applied with communications are all installed in the LVDC system. Thus, besides remote connection to the databases of the grid operators, a local communication network in the LVDC network is needed. One solution applied to implement the communication medium in power distribution grids is power line communication (PLC). There are power cables in the distribution grids, and hence, they may be applied as a communication channel for the distribution-level data. This doctoral thesis proposes an IP-based high-frequency (HF) band PLC data transmission concept for the LVDC network. A general method to implement the Ethernet-based PLC concept between the public distribution rectifier and the customerend inverters in the LVDC grid is introduced. Low-voltage cables are studied as the communication channel in the frequency band of 100 kHz–30 MHz. The communication channel characteristics and the noise in the channel are described. All individual components in the channel are presented in detail, and a channel model, comprising models for each channel component is developed and verified by measurements. The channel noise is also studied by measurements. Theoretical signalto- noise ratio (SNR) and channel capacity analyses and practical data transmission tests are carried out to evaluate the applicability of the PLC concept against the requirements set by the smart grid applications in the LVDC system. The main results concerning the applicability of the PLC concept and its limitations are presented, and suggestion for future research proposed.
Resumo:
In the doctoral dissertation, low-voltage direct current (LVDC) distribution system stability, supply security and power quality are evaluated by computational modelling and measurements on an LVDC research platform. Computational models for the LVDC network analysis are developed. Time-domain simulation models are implemented in the time-domain simulation environment PSCAD/EMTDC. The PSCAD/EMTDC models of the LVDC network are applied to the transient behaviour and power quality studies. The LVDC network power loss model is developed in a MATLAB environment and is capable of fast estimation of the network and component power losses. The model integrates analytical equations that describe the power loss mechanism of the network components with power flow calculations. For an LVDC network research platform, a monitoring and control software solution is developed. The solution is used to deliver measurement data for verification of the developed models and analysis of the modelling results. In the work, the power loss mechanism of the LVDC network components and its main dependencies are described. Energy loss distribution of the LVDC network components is presented. Power quality measurements and current spectra are provided and harmonic pollution on the DC network is analysed. The transient behaviour of the network is verified through time-domain simulations. DC capacitor guidelines for an LVDC power distribution network are introduced. The power loss analysis results show that one of the main optimisation targets for an LVDC power distribution network should be reduction of the no-load losses and efficiency improvement of converters at partial loads. Low-frequency spectra of the network voltages and currents are shown, and harmonic propagation is analysed. Power quality in the LVDC network point of common coupling (PCC) is discussed. Power quality standard requirements are shown to be met by the LVDC network. The network behaviour during transients is analysed by time-domain simulations. The network is shown to be transient stable during large-scale disturbances. Measurement results on the LVDC research platform proving this are presented in the work.
Resumo:
Today, renewable energy technologies and modern power electronics have made it feasible to implement low voltage direct current (LVDC) microgrids (MGs) ca-pable to island operation. Such LVDC networks are particularly useful in remote areas. However, there are still pending issues in island operated LVDC MGs like electrical safety and controlled operation, which should be addressed before wide-scale implementation. This thesis is focused on the overall protection of an island operated LVDC network concept, including protection against electrical shocks, mains equipment protection and protection of photovoltaic (PV) power sources and battery energy storage systems (BESSs). The topic is approached through ex-amination of the safety hazards and the appropriate methods to protect against them, comprising considerations for earthing system selection and realisation of the protection system.