884 resultados para implementation project


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The basic researches about constructability issue done in different countries demonstrate the potential power of this concept to affect the total goals of the construction projects which can lead to significant cost saving, time saving and better quality via considering the contractors’ construction experience in earlier construction project phases. The present research assesses the familiarity of Malaysian building contractors with constructability concept and activities; then it tests their general opinions on its implementation in different construction phases and projects. As the result, some descriptive studies are done on amount of contractors’ familiarity with this term among various kinds of contractors, projects and contracts which can illustrate constructability implementation level among Malaysian contractors. The results of this study show that Malaysian contractors are not all familiar enough with this term and there are still some barriers that prevent them from taking part in its activities completely. The differences in amount of familiarity with constructability matter and its terms of implementation are quite obvious among various types of participants.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Competitive markets are increasingly driving new initiatives for shorter cycle times resulting in increased overlapping of project phases. This, in turn, necessitates improving the interfaces between the different phases to be overlapped (integrated), thus allowing transfer of processes, information and knowledge from one individual or team to another. This transfer between phases, within and between projects, is one of the basic challenges to the philosophy of project management. To make the process transfer more transparent with minimal loss of momentum and project knowledge, this paper draws upon Total Quality Management (TQM) and Business Process Re-engineering (BPR) philosophies to develop a Best Practice Model for managing project phase integration. The paper presents the rationale behind the model development and outlines its two key parts; (1) Strategic Framework and (2) Implementation Plan. Key components of both the Strategic Framework and the Implementation Plan are presented and discussed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The issue of ensuring that construction projects achieve high quality outcomes continues to be an important consideration for key project stakeholders. Although a lot of quality practices have been done within the industry, establishment and achievement of reasonable levels of quality in construction projects continues to be a problem. While some studies into the introduction and development of quality practices and stakeholder management in the construction industry have been undertaken separately, no major studies have so far been completed that examine in depth how quality management practices that specifically address stakeholders’ perspectives of quality can be utilised to contribute to the ultimate constructed quality of projects. This paper encompasses and summarizes a review of the literature related to previous research undertaken on quality within the industry, focuses on the benefits and shortcomings, together with examining the concept of integrating stakeholder perspectives of project quality for improvement of outcomes throughout the project lifecycle. Findings discussed in this paper reveal a pressing need for investigation, development and testing of a framework to facilitate better implementation of quality management practices and thus achievement of better quality outcomes within the construction industry. The framework will incorporate and integrate the views of stakeholders on what constitutes final project quality to be utilised in developing better quality management planning and systems aimed ultimately at achieving better project quality delivery.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Many studies carried out in relation to construction procurement methods reveal evidence of a need to change of culture and attitude in the construction industry. This culture change would transition from traditional adversarial relationships to cooperative and collaborative relationships. Relational contracting approaches, such as partnering and relationship management, are business strategies whereby client, commercial participants’ and stakeholders’ objectives are aligned for mutual benefit. The efficacy of relationship management in the client and contractor groups is proven and well documented. However, the industry has a slow implementation of relational contracting down the value chain. This paper reports the findings of an empirical study which examined the practices and prerequisites for relationship management implementation success and for supply chain engagement to develop. Questionnaire survey, interviews and case studies were conducted with Australian contracting organisations in this study. The study reveals that the adaption of relational contracting approach in the supply chain is found to be limited and contractors still prefer to keep suppliers and subcontractors at arm’s length. Findings also show that the degree of match and mismatch between organizational structuring and organizational process is found to have an impact on staff’s commitment level and performance effectiveness.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Quality, as well as project success, in construction projects should be capable of being regarded as the fulfillment of expectation of those contributors and stakeholders involved in such projects. Although a significant amount of quality practices have been introduced within the industry, establishment and attainment of reasonable levels of quality internationally in construction projects continues to be an ongoing problem. To date, some investigation into the introduction and improvement of quality practices and stakeholder management in the construction industry has been accomplished independently, but so far no major studies have been completed that examine comprehensively how quality management practices that particularly concentrate on the stakeholders’ perspective of quality can be used to contribute to final project quality outcomes. This paper aims to examine the process for development of a framework for better involvement of stakeholders in quality planning and practices and subsequently to contribute to higher quality outcomes within construction projects. Through extensive literature review it highlights various perceptions of quality, categorizes quality issues with particular focus on benefits and shortcomings and also examines stakeholders’ viewpoint of project quality in order to promote the improvement of outcomes throughout a project’s lifecycle. It proposes a set of arranged information as a basis for development of prospective framework which ultimately aims to improve project quality outcomes. The subsequent framework that will be developed from this research will provide project managers and owners with the required information and strategic direction to achieve their own and their stakeholders’ targets for implementation of quality practices and achievement of high quality outcomes on their future projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

As the societal awareness on sustainability is gaining momentum worldwide, the higher education sector is expected to take the lead in education, research and the promotion of sustainable development. Universities have the diversity of skills and knowledge to explore new concepts and issues, the academic freedom to offer unbiased observations, and the capacity to engage in experimentation for solutions. There is a global trend that universities have realized and responded to sustainability challenge. By adopting green technologies, buildings on university campuses have the potential to offer highly productive and green environments for a quality learning experience for students, while minimising environmental impacts. Despite the potential benefits and metaphorical link to sustainability, few universities have moved towards implementing Green Roof and Living Wall on campuses widely, which have had more successful applications in commercial and residential buildings. Few past research efforts have examined the fundamental barriers to the implementation of sustainable projects on campuses from organizational level. To address this deficiency, an on-going research project is undertaken by Queensland University of Technology in Australia. The research is aimed at developing a comprehensive framework to facilitate better decision making for the promotion of Green Roof and Living Wall application on campuses. It will explore and highlight organizational factors as well as investigate and emphasize project delivery issues. Also, the critical technical indicators for Green Roof and Living Wall implementation will be identified. The expected outcome of this research has the potential to enhance Green Roof and Living Wall delivery in Australian universities, as a vital step towards realizing sustainability in higher education sectors.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Design-Build (DB) project delivery systems have increasingly been adopted by many private and public sector organizations worldwide due to its many advantages. However, many Indonesian road infrastructure projects are still delivered using the traditional design-bid-build (DBB) project delivery system. This paper reviews the existing literature to explore factors that can influence the successful implementation of DB project delivery system in Indonesian road infrastructure projects. It founds the lack of clarification in existing legislations as well as the lack of experiences, knowledge and skill as the main obstacles in implementing DB systems in Indonesia. To overcome these obstacles, this paper proposes (1) A relook at existing legislation in term of providing more guidance on determining projects appropriate for the DB, procedures for implementing DB, and the structure of builder entity; (2) To develop the skills and knowledge of DB to all stakeholders through communications, knowledge sharing and training. The outcome of this review can serve as a guide to development a framework for the implementation of the design-build project delivery system in Indonesian road infrastructure projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Quality, in construction projects should be regarded as the fulfillment of expectation of those contributors involved in such projects. Although a significant amount of quality practices have been introduced within the industry, attainment of reasonable levels of quality in construction projects continues to be an ongoing problem. To date, some research into the introduction and improvement of quality practices and stakeholder management has been undertaken, but so far no major studies have been completed that comprehensively examine how greater consideration of stakeholders’ perspectives of quality can be used to contribute to final project quality outcomes. This paper aims to examine the requirements for development of a framework leading to more effective involvement of stakeholders in quality planning and practices thus ultimately contributing to higher quality outcomes for construction projects. Through an extensive literature review it highlights various perceptions of quality, categorizes quality issues with particular focus on benefits and shortcomings and also examines the viewpoints of major stakeholders on project quality. It proposes a set of criteria to be used as a basis for a quality practice improvement framework, which will provide project managers and owners with the required information and strategic direction to achieve their own and their stakeholders’ targets for implementation of quality practices leading to the achievement of improved quality outcomes on future projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Despite an increasing highlight on the sustainability agenda by the construction industry, sustainable development is often treated with different philosophy, interpretation, and responsibility at various stages of project development by various stakeholders involved. The actual sustainability deliverables from the industry is not substantially tangible, especially at project levels. For infrastructure projects which typically span over long periods of time, achieving consistent sustainability outcomes during various stages of development remains as a formidable task. The absence of common understanding among stakeholders and the lack of appropriate sustainability reporting mechanism are possible causes. Many policies dealing with these issues tend to be too generic and broad-based for practical adaptation. While there had been a plenty of research initiatives on sustainability assessment, there is often a gap between sustainability deliverables during project implementation and the grandeur of promises during project conception. This paper reviews the historical context of sustainable development and its principles, and past studies on sustainable construction, focusing on infrastructure projects. It goes on to introduce a QUT research project aimed at identifying and integrating the different perceptions and priority needs of the stakeholders, along with identifying issues that impact on the gap between sustainability foci and its actual realization at project end level, in order to generate a framework of enhancing sustainable deliverables. It is expected that the research will help promote more integrated approaches to decision-making on the implementation of sustainability strategies and foci during the construction project delivery processes.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background: Access to cardiac services is essential for appropriate implementation of evidence-based therapies to improve outcomes. The Cardiac Accessibility and Remoteness Index for Australia (Cardiac ARIA) aimed to derive an objective, geographic measure reflecting access to cardiac services. Methods: An expert panel defined an evidence-based clinical pathway. Using Geographic Information Systems (GIS), a numeric/alpha index was developed at two points along the continuum of care. The acute category (numeric) measured the time from the emergency call to arrival at an appropriate medical facility via road ambulance. The aftercare category (alpha) measured access to four basic services (family doctor, pharmacy, cardiac rehabilitation, and pathology services) when a patient returned to their community. Results: The numeric index ranged from 1 (access to principle referral center with cardiac catheterization service ≤ 1 hour) to 8 (no ambulance service, > 3 hours to medical facility, air transport required). The alphabetic index ranged from A (all 4 services available within 1 hour drive-time) to E (no services available within 1 hour). 13.9 million (71%) Australians resided within Cardiac ARIA 1A locations (hospital with cardiac catheterization laboratory and all aftercare within 1 hour). Those outside Cardiac 1A were over-represented by people aged over 65 years (32%) and Indigenous people (60%). Conclusion: The Cardiac ARIA index demonstrated substantial inequity in access to cardiac services in Australia. This methodology can be used to inform cardiology health service planning and the methodology could be applied to other common disease states within other regions of the world.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This final report outlines the research conducted by the Centre for Accident Research and Road Safety – Queensland (CARRS-Q) for the research project (title above). This report provides an outline of the project methodology, literature review, three stages of research results (including the focus group discussions, review of organisational records, documentation and initiatives, and analysis of previous CARRS-Q occupational road safety self-report surveys), and recommendations for intervention strategy and initiatives development and implementation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to provide of a review of the theory and models underlying project management (PM) research degrees that encourage reflective learning. Design/methodology/approach – Review of the literature and reflection on the practice of being actively involved in conducting and supervising academic research and disseminating academic output. The paper argues the case for the potential usefulness of reflective academic research to PM practitioners. It also highlights theoretical drivers of and barriers to reflective academic research by PM practitioners. Findings – A reflective learning approach to research can drive practical results though it requires a great deal of commitment and support by both academic and industry partners. Practical implications – This paper suggests how PM practitioners can engage in academic research that has practical outcomes and how to be more effective at disseminating these research outcomes. Originality/value – Advanced academic degrees, in particular those completed by PM practitioners, can validate a valuable source of innovative ideas and approaches that should be more quickly absorbed into the PM profession’s sources of knowledge. The value of this paper is to critically review and facilitate a reduced adaptation time for implementation of useful reflective academic research to industry.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The content and context of work significantly influences an employees’ satisfaction. While managers see work motivation as a tool to engage the employees so that they perform better, academicians value work motivation for its contribution to human behaviour. Though the relationship between employee motivation and project success has been extensively covered in the literature, more research focusing on the nature of job design on project success may have been wanting. We address this gap through this study. The present study contributes to the extant literature by suggesting an operational framework of work motivation for project—based organizations. We are also advancing the conceptual understanding of this variable by understanding how the different facets of work motivation have a differing impact of the various parameters of project performance. A survey instrument using standardized scales of work motivation and project success was used. 199 project workers from various industries completed the survey. We first ‘operationalized’ the definition of work motivation for the purpose of our study through a principal component analysis of work motivation items. We obtained a five factor structure that had items pertaining to employee development, work climate, goal clarity, and job security. We then performed a Pearson’s correlation analysis which revealed moderate to significant relationship between project outcomes ad work climate; project outcomes & employee development. In order to establish a causality between work motivation and project management success, we employed linear regression analysis. The results show that work climate is a significant predictor of client satisfaction, while it moderately influences the project quality. Further, bringing in objectivity to project work is important for a successful implementation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This report discusses findings of a case study into "CADD, BIM and IPD" undertaken as a part of the retrospective analysis component of Sustainable Built Environment National Research Centre (SBEnrc) Project 2.7 Leveraging R&D investment for the Australian Built Environment. This case study investigated the evolution that has taken place in the Queensland Department of Public Works Division of Project Services during the last 20 years from: the initial implementation of computer aided design and documentation(CADD); to the experimentation with building information modelling (BIM) from the mid 2000’s; embedding integrated practice (IP); to current steps towards integrated project delivery (IPD) with the integration of contractors in the design/delivery process. This case study should be read in conjunction with Part 1 of this suite of reports.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This report discusses findings of a case study into "Road Construction Safety" undertaken as a part of the retrospective analysis component of Sustainable Built Environment National Research Centre (SBEnrc) Project 2.7 Leveraging R&D investment for the Australian Built Environment. The Queensland Department of Transport and Main Roads (QTMR) has taken a leadership role in developing a safer working environment for road construction workers. In the past decades, a range of initiatives have been introduced to contribute to improved performance in this area. Several initiatives have been undertaken by QTMR as part of their overarching commitment to safety. Three such initiatives form the basis for this case study investigation, in order to better illustrate the nature of R&D investment and its impact on day-to-day operations and the supply chain. These are the development and implementation of: (i) the Mechanical Traffic Aid: (ii) the Thermal Imaging Camera; and (iii) the Trailer-based CCTV (camera). This case study should be read in conjunction with Part 1 of this suite of reports.