991 resultados para environmental plan


Relevância:

40.00% 40.00%

Publicador:

Resumo:

"For use in conjunction with the proposed RMP"--P. [2] of cover, v. 1.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This is a SEPA Environmental Impact Statement as required by State regulations for analyzing the potential impacts of implementing the proposed Seattle Campus Master Plan for the University of Washington. Five action alternatives and the No Action Alternative have been analyzed for 15 elements of the environment.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Using water quality management programs is a necessary and inevitable way for preservation and sustainable use of water resources. One of the important issues in determining the quality of water in rivers is designing effective quality control networks, so that the measured quality variables in these stations are, as far as possible, indicative of overall changes in water quality. One of the methods to achieve this goal is increasing the number of quality monitoring stations and sampling instances. Since this will dramatically increase the annual cost of monitoring, deciding on which stations and parameters are the most important ones, along with increasing the instances of sampling, in a way that shows maximum change in the system under study can affect the future decision-making processes for optimizing the efficacy of extant monitoring network, removing or adding new stations or parameters and decreasing or increasing sampling instances. This end, the efficiency of multivariate statistical procedures was studied in this thesis. Multivariate statistical procedure, with regard to its features, can be used as a practical and useful method in recognizing and analyzing rivers’ pollution and consequently in understanding, reasoning, controlling, and correct decision-making in water quality management. This research was carried out using multivariate statistical techniques for analyzing the quality of water and monitoring the variables affecting its quality in Gharasou river, in Ardabil province in northwest of Iran. During a year, 28 physical and chemical parameters were sampled in 11 stations. The results of these measurements were analyzed by multivariate procedures such as: Cluster Analysis (CA), Principal Component Analysis (PCA), Factor Analysis (FA), and Discriminant Analysis (DA). Based on the findings from cluster analysis, principal component analysis, and factor analysis the stations were divided into three groups of highly polluted (HP), moderately polluted (MP), and less polluted (LP) stations Thus, this study illustrates the usefulness of multivariate statistical techniques for analysis and interpretation of complex data sets, and in water quality assessment, identification of pollution sources/factors and understanding spatial variations in water quality for effective river water quality management. This study also shows the effectiveness of these techniques for getting better information about the water quality and design of monitoring network for effective management of water resources. Therefore, based on the results, Gharasou river water quality monitoring program was developed and presented.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A procedure to evaluate mine rehabilitation practices during the operational phase was developed and validated. It is based on a comparison of actually observed or documented practices with internationally recommended best practices (BP). A set of 150 BP statements was derived from international guides in order to establish the benchmark. The statements are arranged in six rehabilitation programs under three categories: (1) planning (2) operational and (3) management, corresponding to the adoption of the plan-do-check-act management systems model to mine rehabilitation. The procedure consists of (i) performing technical inspections guided by a series of field forms containing BP statements; (ii) classifying evidences in five categories; and (iii) calculating conformity indexes and levels. For testing and calibration purposes, the procedure was applied to nine limestone quarries and conformity indexes were calculated for the rehabilitation programs in each quarry. Most quarries featured poor planning practices, operational practices reached high conformity levels in 50% of the cases and management practices scored moderate conformity. Despite all quarries being ISO 14001 certified, their management systems pay low attention to issues pertaining to land rehabilitation and biodiversity. The best results were achieved by a quarry whose expansion was recently submitted to the environmental impact assessment process, suggesting that public scrutiny may play a positive role in enhancing rehabilitation practices. Conformity indexes and levels can be used to chart the evolution of rehabilitation practices at regular intervals, to establish corporate goals and for communication with stakeholders. (C) 2010 Elsevier Ltd. All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Great Barrier Reef Water Quality Protection Plan (the Reef Plan) is a joint initiative of the Australian and Queensland Governments. The Reef Plan aims to progress an integrated approach to natural resource management planning by building on the existing partnerships between the different levels of government, industry groups, the community and research providers within the Reef catchments, principally through partnerships with the regional natural resource management (NRM) bodies.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Construction and demolition waste management is becoming increasingly important on construction sites as landfill space in Ireland is rapidly depleting and waste management costs are rising. Due to these factors waste management plans are seen as a good response to minimising waste on site and this thesis aims to investigate how to implement such a plan on a practical case study as well as investigating the legislation regarding construction and demolition waste along with market availability for the reuse of the waste. Main contractor surveys were also carried out in order to gain a better understanding of current attitudes within the industry and these surveys are analysed in chapter five. A survey was also carried out among sub-contractors but this survey has not been used for this thesis as the study is on-going. The primary aim of this thesis is to examine the waste hierarchy opportunities that are available for construction and demolition waste in Ireland and to examine the effects of management strategies on construction and demolition waste reduction at the project level. A partnership was developed with Carey Developments Ltd in Co. Galway and an analysis of their waste management practices was undertaken. The primary case study will be the ‘Taylors Hill’ project in Co. Galway where work commenced in March, 2012. The secondary aim of the thesis is to develop specific waste minimisation strategies for the company and to develop a training tool kit for use on site.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Energy from waste (E/W) technologies in the form o f biogas plants, CHP plants and other municipal solid waste (MSW) conversion technologies, have been gaining steady ground in the provision o f energy throughout Europe and the UK. Urban Waste Water Treatment Plants (UWWTP) are utilising much o f the same biochemical processes common to these E/W plants. Previous studies on Centralised Anaerobic Digestion (CAD) within Ireland found that the legislative and economic conditions were not conducive to such an operation on the grounds o f low energy price for electric and heat energy, and due to the restrictive nature o f the allowable feedstocks. Recent changes to the Irish REFIT tariff on energy produced from Anaerobic digestion; alterations to the regulation o f the allowable use o f animal by products(ABP); the recent enactment o f the Renewable Energy D irective (09/28/EC) and a subsequent review o f the draft Biowaste Directive (2001) required that the issue o f decentralised energy production in Ireland be reassessed. In this instance the feasibility study is based on a extant rural community, centred around the village o f Woodford Co Galway. The review found that the prevailing conditions were now such that it was technically and economically feasible for this biochemical process to provide energy and waste treatment facilities at the above location. The review also outlines the last item which is preventing this process from becoming achievable, specifically the lack o f a digestate regulation on land spreading which deals specifically with biowaste. The study finds that the implementation o f the draft EU biowaste regulations, with amendments for Cr and Hg levels to match the proposed Irish regulation for compost, would ensure that Ireland has some o f the most restrictive regulations in Europe for this application. The delay in completing this piece o f legislation is preventing national energy and waste issues from being resolved in a planned and stepwise fashion. A proposed lay out for the new Integrated Waste from Energy Plant (IW/EP) is presented. Budget economic projections and alternative revenue streams are outlined. Finally a review o f the national policies regarding the Rural Development Plan (RDP), the Rural Planning Guidelines (RPG) and the National Renewable Energy Action Plan (NREAP) are examined against the relevant EU directives.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

En el presente estudio se han analizado las posibilidades de reducción del impacto ambiental que genera el consumo de energía en el Monasterio budista Sakya Tashi Ling del Parque del Garraf, mediante la mejora de la eficiencia energética de los edificios y la producción de la energía consumida a partir de fuentes de energía renovables. Se ha realizado un inventario exhaustivo de los flujos energéticos de entrada del Monasterio: electricidad y combustibles fósiles, y el análisis de estos datos ha permitido observar que la mayor parte del consumo energético del Monasterio tiene como uso final la iluminación. El consumo total de energía se ha cuantificado en 138 kWh/m2/año y la emisiones de CO2 en 177 kg CO2/m2/año. A partir de estos datos se ha estudiado la posibilidad de reducir el consumo y abastecer la demanda energética del Monasterio a través de fuentes de energía renovable como las placas solares fotovoltaicas o las calderas de biomasa. Para alcanzar este objetivo se han propuesto tres escenarios posibles con costes económicos y resultados muy distintos. A diferencia de los escenarios “Edificio Energía Plus” y “Edificio Energía 0”, el tercer escenario propuesto, que trataba de alcanzar el triple objetivo del Plan 20/20/20 (producir a partir de fuentes renovables el 20% de la energía consumida, aumentar en una 20% la eficiencia energética y reducir en un 20% las emisiones de CO2 derivadas del uso de la energía) ha resultado ser muy viable económicamente: la inversión necesaria se amortizaría en tan sólo 5 años.