990 resultados para current facilities


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper provides an overview of the Australian Government’s Facilities Management (FM) Action Agenda as announced in 2004 as a key policy plank designed to facilitate growth of the FM industry. The resulting consultation with industry leaders has seen the criterion and release in April 2005 of the FM Action Agenda’s strategic plan entitled ‘Managing the Built Environment’. This framework, representing a collaboration between the Australian Government, public and private sector stakeholders and Facility Management Association of Australia (FMA Australia) and other allied bodies, sets out to achieve the vision of a more “…productive and sustainable built environment…” through improved innovation, education and standards. The 36 month implementation phase is now underway and will take a multi-pronged approach to enhancing the recognition of the FM industry and removing impediments to its growth with a 20 point action plan across the following platforms: • Innovation – Improved appreciation of facility life cycles, and greater understanding of the key drivers of workplace productivity, and the improved application of information technology. • Education and Training – Improved access to dedicated FM education and training opportunities and creation clear career pathways into the profession. • Regulatory Reform – Explore opportunities to harmonise cross jurisdictional regulatory compliance requirements that have an efficiency impact on FM. • Sustainability – Improved utilization of existing knowledge and the development of tools and opportunities to improve the environmental performance of facilities. Additional information is available at www.fma.com.au

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The paper presents an interim summary of research and case studies being undertaken in the Sydney Opera House FM Exemplar Project covering procurement, benchmarking and building information models. The final outcomes of the FM Exemplar Project will be presented through various forums open to all FM practitioners and published in Australia and elsewhere through relevant journals. Sydney Opera House is an Australian icon, attracting some 4.5 million visitors per year who admire its built form and enjoy an evening of theatre. The building is the attraction, part of the experience. Therefore, facilities management is critical to the success of the Sydney Opera House enterprise and an ideal subject for the study of facilities management. Significantly the three research themes are heavily intertwined – effective risk sharing in procurement requires historic information and benchmarks for future performance, benchmarking gathers vast quantities of data that can only be exploited if properly related to one another and a building information model provides the means to manage such data. The case studies are emerging as real-life examples of how one organisation is addressing FM issues common to many, and will provide useful lessons for practitioners pursing similar strategies in their own organisations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Off-site manufacture (OSM) offers numerous benefits to all parties in the construction process. The uptake of OSM in Australia has, however, been limited. This limited uptake corresponds to similar trends in the UK and US, although the level of OSM there appears to be increasing. This project undertook three workshops — one each in Victoria, Queensland and Western Australia — and 18 interviews with key stakeholders to assist in identifying the general benefits and barriers to OSM uptake in the Australian construction industry. Seven case studies were also undertaken, involving construction projects that used OSM, ranging from civil projects through to residential. Each of these case studies has been analysed to identify what worked and what didn’t, and suggest the lessons to be learned from each project.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The digital modelling research stream of the Sydney Opera House FM Exemplar Project has demonstrated significant benefits in digitising design documentation and operational and maintenance manuals. Since Sydney Opera House did not have digital models of its structure, there was an opportunity to investigate the application of digital modelling using standardised Building Information Models (BIM) to support facilities management (FM).The focus of this investigation was on the following areas:the re-usability of standardised BIM for FM purposesthe potential of BIM as an information framework acting as integrator for various FM data sources the extendibility and flexibility of the BIM to cope with business-specific data and requirements commercial FM software using standardised BIMthe ability to add (organisation-specific) intelligence to the modela roadmap for Sydney Opera House to adopt BIM for FM.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Objectives It is widely assumed improving care in residential facilities will improve quality of life (QoL), but little research has explored this relationship. The Clinical Care Indicators (CCI) Tool was developed to fill an existing gap in quality assessment within Australian residential aged care facilities and it was used to explore potential links between clinical outcomes and QoL. Design and Setting Clinical outcome and QoL data were collected within four residential facilities from the same aged care provider. Subjects Subjects were 82 residents of four facilities. Outcome Measures Clinical outcomes were measured using the CCI Tool and QoL data was obtained using the Australian WHOQOL‑100. Results Independent t‑test analyses were calculated to compare individual CCIs with each domain of the WHOQOL‑100, while Pearson’s product moment coefficients (r) were calculated between the total number of problem indicators and QoL scores. Significant results suggested poorer clinical outcomes adversely affected QoL. Social and spiritual QoL were particularly affected by clinical outcomes and poorer status in hydration, falls and depression were most strongly associated with lower QoL scores. Poorer clinical status as a whole was also significantly correlated with poorer QoL. Conclusions Hydration, falls and depression were most often associated with poorer resident QoL and as such appear to be key areas for clinical management in residential aged care. However, poor clinical outcomes overall also adversely affected QoL, which suggests maintaining optimum clinical status through high quality nursing care, would not only be important for resident health but also for enhancing general life quality.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Building Information Modelling (BIM) is an information technology [IT] enabled approach to managing design data in the AEC/FM (Architecture, Engineering and Construction/ Facilities Management) industry. BIM enables improved interdisciplinary collaboration across distributed teams, intelligent documentation and information retrieval, greater consistency in building data, better conflict detection and enhanced facilities management. Despite the apparent benefits the adoption of BIM in practice has been slow. Workshops with industry focus groups were conducted to identify the industry needs, concerns and expectations from participants who had implemented BIM or were BIM “ready”. Factors inhibiting BIM adoption include lack of training, low business incentives, perception of lack of rewards, technological concerns, industry fragmentation related to uneven ICT adoption practices, contractual matters and resistance to changing current work practice. Successful BIM usage depends on collective adoption of BIM across the different disciplines and support by the client. The relationship of current work practices to future BIM scenarios was identified as an important strategy as the participants believed that BIM cannot be efficiently used with traditional practices and methods. The key to successful implementation is to explore the extent to which current work practices must change. Currently there is a perception that all work practices and processes must adopt and change for effective usage of BIM. It is acknowledged that new roles and responsibilities are emerging and that different parties will lead BIM on different projects. A contingency based approach to the problem of implementation was taken which relies upon integration of BIM project champion, procurement strategy, team capability analysis, commercial software availability/applicability and phase decision making and event analysis. Organizations need to understand: (a) their own work processes and requirements; (b) the range of BIM applications available in the market and their capabilities (c) the potential benefits of different BIM applications and their roles in different phases of the project lifecycle, and (d) collective supply chain adoption capabilities. A framework is proposed to support organizations selection of BIM usage strategies that meet their project requirements. Case studies are being conducted to develop the framework. The results of the preliminary design management case study is presented for contractor led BIM specific to the design and construct procurement strategy.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Queensland University of Technology (QUT) is faced with a rapidly growing research agenda built upon a strategic research capacity-building program. This presentation will outline the results of a project that has recently investigated QUT’s research support requirements and which has developed a model for the support of eResearch across the university. QUT’s research building strategy has produced growth at the faculty level and within its research institutes. This increased research activity is pushing the need for university-wide eResearch platforms capable of providing infrastructure and support in areas such as collaboration, data, networking, authentication and authorisation, workflows and the grid. One of the driving forces behind the investigation is data-centric nature of modern research. It is now critical that researchers have access to supported infrastructure that allows the collection, analysis, aggregation and sharing of large data volumes for exploration and mining in order to gain new insights and to generate new knowledge. However, recent surveys into current research data management practices by the Australian Partnership for Sustainable Repositories (APSR) and by QUT itself, has revealed serious shortcomings in areas such as research data management, especially its long term maintenance for reuse and authoritative evidence of research findings. While these internal university pressures are building, at the same time there are external pressures that are magnifying them. For example, recent compliance guidelines from bodies such as the ARC, and NHMRC and Universities Australia indicate that institutions need to provide facilities for the safe and secure storage of research data along with a surrounding set of policies, on its retention, ownership and accessibility. The newly formed Australian National Data Service (ANDS) is developing strategies and guidelines for research data management and research institutions are a central focus, responsible for managing and storing institutional data on platforms that can be federated nationally and internationally for wider use. For some time QUT has recognised the importance of eResearch and has been active in a number of related areas: ePrints to digitally publish research papers, grid computing portals and workflows, institutional-wide provisioning and authentication systems, and legal protocols for copyright management. QUT also has two widely recognised centres focused on fundamental research into eResearch itself: The OAK LAW project (Open Access to Knowledge) which focuses upon legal issues relating eResearch and the Microsoft QUT eResearch Centre whose goal is to accelerate scientific research discovery, through new smart software. In order to better harness all of these resources and improve research outcomes, the university recently established a project to investigate how it might better organise the support of eResearch. This presentation will outline the project outcomes, which include a flexible and sustainable eResearch support service model addressing short and longer term research needs, identification of resource requirements required to establish and sustain the service, and the development of research data management policies and implementation plans.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The distribution network reliability can be increased if distributed generators (DGs) are allowed to operate in both grid-connected and islanded operations when the network has a high DG penetration level. However, the current utility regulations do not allow for the islanded operation. The arc faults are the one of the major issues preventing the islanded operation, since the arc will not extinguish if the DGs are not disconnected. In this paper, the effect of a converter interfaced DG on an arc fault is investigated by considering different control strategies for the converter. The foldback current control characteristic is proposed to a converter interfaced DG to achieve quick arc extinction and self-restoration without disconnecting the DG in the event of an arc fault. The results are validated through PSCAD/EMTDC simulations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The multi-level current reinjection concept described in literature is well-known to produce high quality AC current waveforms in high power and high voltage self-commutating current source converters. This paper proposes a novel reinjection circuitry which is capable of producing a 7-level reinjection current. It is shown that this reinjection current effectively increases the pulse number of the converter to 72. The use of PSCAD/EMTDC simulation validates the functionality of the proposed concept illustrating its effectiveness on both AC and DC sides of the converter.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Over the past 20 years the nature of rural valuation practice has required most rural valuers to undertake studies in both agriculture (farm management) and valuation, especially if carrying out valuation work for financial institutions. The additional farm financial and management information obtained by rural valuers exceeds that level of information required to value commercial, retail and industrial by the capitalisation of net rent/profit valuation method and is very similar to the level of information required for the valuation of commercial and retail property by the Discounted Cash Flow valuation method. On this basis the valuers specialising in rural valuation practice have the necessary skills and information to value rural properties by an income valuation method, which can focus on the long term environmental and economic sustainability of the property being valued. This paper will review the results of an extensive survey carried out by rural property valuers in Australia, in relation to the impact of farm management on rural property values and sustainable rural land use. A particular focus of the research relates to the increased awareness of the problems of rural land degradation in Australia and the subsequent impact such problems have on the productivity of rural land. These problems of sustainable land use have resulted in the need to develop an approach to rural valuation practice that allows the valuer to factor the past management practices on the subject rural property into the actual valuation figure. An analysis of the past farm management and the inclusion of this data into the valuation methodology provides a much more reliable indication of farm sustainable economic value than the existing direct comparison valuation methodology.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Public Private Partnership (PPP) is a well established methodology for procuring public works projects. By incorporating the private sector’s expertise, efficiency, innovation, business sense, risk sharing, financing etc. into public works projects, the quality of public services and facilities can be uplifted. Like many jurisdictions, Hong Kong is also keen to take aboard this methodology which is so familiar but yet so distant. Although they have been one of the first jurisdictions to utilise the private sector in public works projects, their comfortable financial reserves has meant that there has been no urge to push the movement until recently. PPP has become increasingly popular amongst governments. The Hong Kong Special Administrative Region (HKSAR) government is no exception. Some of the more active works departments have commissioned studies to investigate the best ways to deliver these projects, others have even trialed the method themselves. The efficiency Unit of the HKSAR government has also become an active arm in conducting research in this area. Although so, the information that is currently available is still very broad. Building from their works there is a need to develop a best practice framework for implementing PPP projects in Hong Kong by incorporating international experiences. To develop a best practice framework will require thorough investigation into the benefits, difficulties and critical success factor of PPP. PPP should also be compared with other procurement methods. In order to do so it is important to clearly understand the local situation by an analysis of projects conducted to date. Lessons learnt can further be derived from other countries and incorporated to those derived locally. Finally the best conditions in terms of project nature, complexity, types, and scales for adopting PPP should be derived. The aim and objectives of this study were achieved via a comprehensive literature review, in-depth case analyses, interview survey with experts from both Hong Kong and overseas, and finally a large scale data collection was conducted via a questionnaire survey with PPP practitioners. These findings were further triangulated before they were used as the basis to form the best practice framework presented in this thesis. The framework was then further validated by PPP experts to ensure it is comprehensive, objective, reliable and practical. This study has presented a methodology that can be adopted for future studies. It has also updated our knowledge on the development trends of PPP as well as opened up the experiences of other jurisdictions. The findings have shown that the local industry is familiar with “what” should be done in PPP projects but they are unsure of “how” these goals can be achieved. This framework has allowed this further knowledge to be delivered to PPP practitioners. As a result, the development of this framework can help to resolve the current economic crisis by encouraging more developments and business opportunities for the private sector. In addition, the correct projects can be delivered by PPP, the advantages of PPP can be maximised, and the general public can benefit from the private sector’s participation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Substance misuse in people with serious mental disorders is common and has a wideranging negative impact. The multiplicity of problems suggests that this comorbidity is better conceptualized as a type of complex disorder than by ‘dual diagnosis’. Problems with sequential and parallel treatments have led to the development of integrated approaches, with one practitioner or team addressing both the substance use and mental disorder. These treatments are typically characterized by motivation enhancement, minimizing treatment-related stress, emphasizing harm reduction as well as abstinence, and assertive outreach. A review of published randomized trials demonstrates that superior effects to controls are rarely consistent across treatment foci and over time. While motivational interventions assist engagement, more intervention is usually required for integrated treatment programs to improve long-term outcomes more than control conditions. More intensive case management does not consistently improve impact, but extended cognitive-behavioral therapies have promise. Suggestions for maximizing treatment effects and improving research evidence are provided.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents an Active Gate Signaling scheme to reduce voltage/current spikes across insulated gate power switches in hard switching power electronic circuits. Voltage and/or current spikes may cause EMI noise. In addition, they increase voltage/current stress on the switch. Traditionally, a higher gate resistance is chosen to reduce voltage/current spikes. Since the switching loss will increase remarkably, an active gate voltage control scheme is developed to improve efficiency of hard switching circuits while the undesirable voltage and/or current spikes are minimized.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A Positive Buck- Boost (PBB) converter is a known DC-DC converter that can operate in step up and step down modes. Unlike Buck, Boost, and Inverting Buck Boost converters, the inductor current of a PBB can be controlled independently of its voltage conversion ratio. In other words, the inductor of PBB can be utilised as an energy storage unit in addition to its main function of energy transfer. In this paper, the capability of PBB to store energy has been utilised to achieve robustness against input voltage fluctuations and output current changes. The control strategy has been developed to keep accuracy, affordability, and simplicity acceptable. To improve the efficiency of the system a Smart Load Controller (SLC) has been suggested. Applying SLC extra current storage occurs when there is sudden loads change otherwise little extra current is stored.