989 resultados para contract management
Application of the agency theory for the analysis of performance-based mechanisms in road management
Resumo:
El WCTR es un congreso de reconocido prestigio internacional en el ámbito de la investigación del transporte, y aunque las actas publicadas están en formato digital y sin ISSN ni ISBN, lo consideramos lo suficientemente importante como para que se considere en los indicadores. This paper develops a model based on agency theory to analyze road management systems (under the different contract forms available today) that employ a mechanism of performance indicators to establish the payment of the agent. The base assumption is that of asymmetric information between the principal (Public Authorities) and the agent (contractor) and the risk aversion of this latter. It is assumed that the principal may only measure the agent?s performance indirectly and by means of certain performance indicators that may be verified by the authorities. In this model there is presumed to be a relation between the efforts made by the agent and the performance level measured by the corresponding indicators, though it is also considered that there may be dispersion between both variables that gives rise to a certain degree of randomness in the contract. An analysis of the optimal contract has been made on the basis of this model and in accordance with a series of parameters that characterize the economic environment and the particular conditions of road infrastructure. As a result of the analysis made, it is considered that an optimal contract should generally combine a fixed component and a payment in accordance with the performance level obtained. The higher the risk aversion of the agent and the greater the marginal cost of public funds, the lower the impact of this performance-based payment. By way of conclusion, the system of performance indicators should be as broad as possible but should not overweight those indicators that encompass greater randomness in their results.
Resumo:
La gestión de las tecnologías de la información tiene cada vez más importancia dentro de un mundo totalmente digitalizado y donde la capacidad de respuesta al cambio puede marcar el devenir de una compañía, y resulta cada vez más evidente que los modelos de gestión tradicionales utilizados en la mayoría de las compañías no son capaces de dar respuesta por si solos a estas nuevas necesidades. Aun teniendo identificado este área de mejora, son muchas las empresas reacias a abordar estos cambios, principalmente por el cambio rupturista que significa a nivel interno. De cara a facilitar esta transformación, se propone en este documento un modelo de transición controlada donde las grandes compañías puedan incorporar nuevas alternativas y herramientas ágiles de forma paulatina y asegurando que el proceso de cambio es seguro y efectivo. Mediante una modificación del ciclo de vida de proyecto dentro de la compañía, se incorporan en las áreas, equipos o dominios de la empresa que se identifiquen los nuevos modelos de gestión ágil, permitiendo así una transición gradual y controlada, y pudiendo además analizar los detalles sobre todo en etapas tempranas de la transformación. Una vez seleccionada el área o dominio objeto de la transformación, se realiza un análisis a nivel de Portfolio de proyectos, identificando aquellos que cumplen una serie de condiciones que les permiten ser gestionados utilizando modelos de gestión ágil. Para ello, se plantea una matriz de decisión con las principales variables a tener en cuenta a la hora de tomar una decisión. Una vez seleccionado y consensuado con los interesados el modelo de gestión utilizando la matriz de decisión, se plantean una serie de herramientas y métricas asociadas para que la gestión ágil del proyecto dé una visibilidad completa y detallada del estado en cada momento, asegurando un correcto proceso de gestión de proyectos para proveer visibilidad regular del progreso, riesgos, planes de contingencia y problemas, con las alertas y escalaciones adecuadas. Además de proponerse una serie de herramientas y métricas para la gestión ágil del proyecto, se plantean las modificaciones necesarias sobre las tipologías habituales de contrato y se propone un nuevo modelo de contrato: el Contrato Agile. La principal diferencia entre este nuevo modelo de contrato y los habituales es que, al igual que las metodologías ágiles, es ejecutado en segmentos o iteraciones. En definitiva, el objetivo de este documento es proveer un mecanismo que facilite la inclusión de nuevos modelos ágiles de gestión en grandes organizaciones, llevando a cabo una transición controlada, con herramientas y métricas adaptadas para tener visibilidad completa sobre los proyectos en todo momento.---ABSTRACT---The information technology management is every time more important in a totally digitized world, where the capacity to response the change could mark the future of a company, and results every time more evident that the traditional management models used in the most of the companies are not able to respond by themselves to these new necessities. Even having identified this improvement area, many companies are reluctant to address these changes, mainly due to the disruptive change that it means internally in the companies. In order to facilitate this transformation, this document proposed a controlled transition model to help the big companies to incorporate new alternatives and agile tools gradually and ensuring that the change process is safe and effective. Through a modification the project life cycle inside the company, the new agile management models are incorporated in the selected areas, teams or domains, permitting a gradual and controlled transition, and enabling further analyze the details above all in the early phases of the transformation. Once is selected the area or domain object of the transformation, a portfolio level analysis is performed, identifying those projects that meet a some conditions that allow them to be managed using agile management models. For that, a decision matrix is proposed with the principal variables to have into account at the time of decision making. Once the management model is selected using the decision matrix and it is agreed with the different stakeholders, a group of tools and metrics associated with the agile management projects are proposed to provide a regular visibility of the project progress, risks, contingency plans and problems, with proper alerts and escalations. Besides the group of tools and metrics proposed for agile project management, the necessary modifications over the traditional contract models and a new contract model are proposed: the Agile Contract. The main difference between this new contract model and the traditional ones is that, as the agile methodologies, it is executed in segments or iterations. To sum up, the objective of this document is to provide a mechanism that facilitates the inclusion of new agile management models in big companies, with a controlled transition and proposing adapted tools and metrics to have a full visibility over the project in all the phases of the project life cycle.
Resumo:
Frequently, population ecology of marine organisms uses a descriptive approach in which their sizes and densities are plotted over time. This approach has limited usefulness for design strategies in management or modelling different scenarios. Population projection matrix models are among the most widely used tools in ecology. Unfortunately, for the majority of pelagic marine organisms, it is difficult to mark individuals and follow them over time to determine their vital rates and built a population projection matrix model. Nevertheless, it is possible to get time-series data to calculate size structure and densities of each size, in order to determine the matrix parameters. This approach is known as a “demographic inverse problem” and it is based on quadratic programming methods, but it has rarely been used on aquatic organisms. We used unpublished field data of a population of cubomedusae Carybdea marsupialis to construct a population projection matrix model and compare two different management strategies to lower population to values before year 2008 when there was no significant interaction with bathers. Those strategies were by direct removal of medusae and by reducing prey. Our results showed that removal of jellyfish from all size classes was more effective than removing only juveniles or adults. When reducing prey, the highest efficiency to lower the C. marsupialis population occurred when prey depletion affected prey of all medusae sizes. Our model fit well with the field data and may serve to design an efficient management strategy or build hypothetical scenarios such as removal of individuals or reducing prey. TThis This sdfsdshis method is applicable to other marine or terrestrial species, for which density and population structure over time are available.
Resumo:
"Work performed for the Office of Solid Waste under contract no. 68-01-4657."
Resumo:
National Highway Traffic Safety Administration, Washington, D.C.
Resumo:
"SW-169.1-3."
Resumo:
National Highway Traffic Safety Administration, Washington, D.C.
Resumo:
Item 431-I-19
Resumo:
"August 1997."
Resumo:
"May 1992."
Resumo:
National Highway Traffic Safety Administration, Washington, D.C.
Resumo:
Prepared under a contract for the National Health Service Corps by Family Health Care, Inc.
Resumo:
Final report; contract DOT-OS-70063.
Resumo:
Includes appendices.
Resumo:
"HRDS-06/10-05(1M)E"--P. [4] of cover.