944 resultados para active power reserve for frequency control


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Wireless charging technology extends the battery autonomy by allowing more flexible and practical ways of recharging it even when the electric vehicle is on move. The frequency conversion, which is required to generate a kHz-ranged magnetic field, also leads to considerable harmonics. As a result, the power factor and the corresponding efficiency decrement. This paper proposes a Power Factor Corrector which overcomes this drawback. The most relevant feature of the designed Power Factor Corrector is that it does not need any electrical signal from the secondary side to adjust its operation properly. The simulation results show the ability of the proposed scheme to increment the system efficiency for different State-Of-Charge in the Battery.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Renewable or sustainable energy (SE) sources have attracted the attention of many countries because the power generated is environmentally friendly, and the sources are not subject to the instability of price and availability. This dissertation presents new trends in the DC-AC converters (inverters) used in renewable energy sources, particularly for photovoltaic (PV) energy systems. A review of the existing technologies is performed for both single-phase and three-phase systems, and the pros and cons of the best candidates are investigated. In many modern energy conversion systems, a DC voltage, which is provided from a SE source or energy storage device, must be boosted and converted to an AC voltage with a fixed amplitude and frequency. A novel switching pattern based on the concept of the conventional space-vector pulse-width-modulated (SVPWM) technique is developed for single-stage, boost-inverters using the topology of current source inverters (CSI). The six main switching states, and two zeros, with three switches conducting at any given instant in conventional SVPWM techniques are modified herein into three charging states and six discharging states with only two switches conducting at any given instant. The charging states are necessary in order to boost the DC input voltage. It is demonstrated that the CSI topology in conjunction with the developed switching pattern is capable of providing the required residential AC voltage from a low DC voltage of one PV panel at its rated power for both linear and nonlinear loads. In a micro-grid, the active and reactive power control and consequently voltage regulation is one of the main requirements. Therefore, the capability of the single-stage boost-inverter in controlling the active power and providing the reactive power is investigated. It is demonstrated that the injected active and reactive power can be independently controlled through two modulation indices introduced in the proposed switching algorithm. The system is capable of injecting a desirable level of reactive power, while the maximum power point tracking (MPPT) dictates the desirable active power. The developed switching pattern is experimentally verified through a laboratory scaled three-phase 200W boost-inverter for both grid-connected and stand-alone cases and the results are presented.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In recent years, the 380V DC and 48V DC distribution systems have been extensively studied for the latest data centers. It is widely believed that the 380V DC system is a very promising candidate because of its lower cable cost compared to the 48V DC system. However, previous studies have not adequately addressed the low reliability issue with the 380V DC systems due to large amount of series connected batteries. In this thesis, a quantitative comparison for the two systems has been presented in terms of efficiency, reliability and cost. A new multi-port DC UPS with both high voltage output and low voltage output is proposed. When utility ac is available, it delivers power to the load through its high voltage output and charges the battery through its low voltage output. When utility ac is off, it boosts the low battery voltage and delivers power to the load form the battery. Thus, the advantages of both systems are combined and the disadvantages of them are avoided. High efficiency is also achieved as only one converter is working in either situation. Details about the design and analysis of the new UPS are presented. For the main AC-DC part of the new UPS, a novel bridgeless three-level single-stage AC-DC converter is proposed. It eliminates the auxiliary circuit for balancing the capacitor voltages and the two bridge rectifier diodes in previous topology. Zero voltage switching, high power factor, and low component stresses are achieved with this topology. Compared to previous topologies, the proposed converter has a lower cost, higher reliability, and higher efficiency. The steady state operation of the converter is analyzed and a decoupled model is proposed for the converter. For the battery side converter as a part of the new UPS, a ZVS bidirectional DC-DC converter based on self-sustained oscillation control is proposed. Frequency control is used to ensure the ZVS operation of all four switches and phase shift control is employed to regulate the converter output power. Detailed analysis of the steady state operation and design of the converter are presented. Theoretical, simulation, and experimental results are presented to verify the effectiveness of the proposed concepts.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Power distribution automation and control are import-ant tools in the current restructured electricity markets. Unfortunately, due to its stochastic nature, distribution systems faults are hardly avoidable. This paper proposes a novel fault diagnosis scheme for power distribution systems, composed by three different processes: fault detection and classification, fault location, and fault section determination. The fault detection and classification technique is wavelet based. The fault-location technique is impedance based and uses local voltage and current fundamental phasors. The fault section determination method is artificial neural network based and uses the local current and voltage signals to estimate the faulted section. The proposed hybrid scheme was validated through Alternate Transient Program/Electromagentic Transients Program simulations and was implemented as embedded software. It is currently used as a fault diagnosis tool in a Southern Brazilian power distribution company.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A finite element analysis and a parametric optimization of single-axis acoustic levitators are presented. The finite element method is used to simulate a levitator consisting of a Langevin ultrasonic transducer with a plane radiating surface and a plane reflector. The transducer electrical impedance, the transducer face displacement, and the acoustic radiation potential that acts on small spheres are determined by the finite element method. The numerical electrical impedance is compared with that acquired experimentally by an impedance analyzer, and the predicted displacement is compared with that obtained by a fiber-optic vibration sensor. The numerical acoustic radiation potential is verified experimentally by placing small spheres in the levitator. The same procedure is used to optimize a levitator consisting of a curved reflector and a concave-faced transducer. The numerical results show that the acoustic radiation force in the new levitator is enhanced 604 times compared with the levitator consisting of a plane transducer and a plane reflector. The optimized levitator is able to levitate 3, 2.5-mm diameter steel spheres with a power consumption of only 0.9 W.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Exercise training has been shown to be effective in improving exercise capacity and quality of life in patients with heart failure and left ventricular (LV) systolic dysfunction. Real-time myocardial contrast echocardiography (RTMCE) is a new technique that allows quantitative analysis of myocardial blood flow (MBF). The aim of this study was to determine the effects of exercise training on MBF in patients with LV dysfunction. We studied 23 patients with LV dysfunction who underwent RTMCE and cardiopulmonary exercise testing at baseline and 4 months after medical treatment (control group, n = 10) or medical treatment plus exercise training (trained group, n = 13). Replenishment velocity (0) and MBF reserves were derived from quantitative RTMCE. The 4-month exercise training consisted of 3 60-minute exercise sessions/week at an intensity corresponding to anaerobic threshold, 10% below the respiratory compensation point. Aerobic exercise training did not change LV diameters, volumes, or ejection fraction. At baseline, no difference was observed in MBF reserve between the control and trained groups (1.89, 1.67 to 1.98, vs 1.81, 1.28 to 2.38, p = 0.38). Four-month exercise training resulted in a significant increase in beta reserve from 1.72 (1.45 to 1.48) to 2.20 (1.69 to 2.77, p <0.001) and an MBF reserve from 1.81 (1.28 to 2.38) to 3.05 (2.07 to 3.93, p <0.001). In the control group, 13 reserve decreased from 1.51 (1.10 to 1.85) to 1.46 (1.14 to 2.33, p = 0.03) and MBF reserve from 1.89 (1.67 to 1.98) to 1.55 (1.11 to 2.27, p <0.001). Peak oxygen consumption increased by 13.8% after 4 months of exercise training and decreased by 1.9% in the control group. In conclusion, exercise training resulted in significant improvement of MBF reserve in patients with heart failure and LV dysfunction. (C) 2010 Elsevier Inc. All rights reserved. (Am J Cardiol 2010;105:243-248)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The normalized electromyographic characteristics of masticatory muscles in patients with temporomandibular joint disorders (TMD) and healthy controls were compared. Thirty TMD patients (15 men, 15 women, mean age 23 years) with long lasting pain (more than 6 months), and 20 control subjects matched for sex and age were examined. All patients had arthrogenous TMD according to the Research Diagnostic Criteria for TMD (RDC/TMD). Surface electromyography of masseter and temporal muscles was performed during maximum teeth clenching either on cotton rolls or in intercuspal position. Standardized EMG indices and the median power frequency were obtained, and compared between the two groups and sexes using ANOVAs. During clenching, the TMD patients had larger asymmetry in their temporalis muscles, larger temporalis activity relative to masseter, and reduced mean power frequencies than the control subjects (p < 0.05, ANOVA). In both groups, the mean power frequencies of the temporalis muscles were larger than those of the masseter muscles (p < 0.001). No sex related differences, and no sex x group interactions were found. In conclusion, young adult patients with long lasting TMD have an increased and more asymmetric standardized activity of their temporalis anterior muscle, and reduced mean power frequencies, relative to healthy controls. (C) 2011 Elsevier Ltd. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

As wind power generation undergoes rapid growth, new technical challenges emerge: dynamic stability and power quality. The influence of wind speed disturbances and a pitch control malfunction on the quality of the energy injected into the electric grid is studied for variable-speed wind turbines with different power-electronic converter topologies. Additionally, a new control strategy is proposed for the variable-speed operation of wind turbines with permanent magnet synchronous generators. The performance of disturbance attenuation and system robustness is ascertained. Simulation results are presented and conclusions are duly drawn. (C) 2010 Elsevier Ltd. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper is on variable-speed wind turbines with permanent magnet synchronous generator (PMSG). Three different drive train mass models and three different topologies for the power-electronic converters are considered. The three different topologies considered are respectively a matrix, a two-level and a multilevel converter. A novel control strategy, based on fractional-order controllers, is proposed for the wind turbines. Simulation results are presented to illustrate the behaviour of the wind turbines during a converter control malfunction, considering the fractional-order controllers. Finally, conclusions are duly drawn. Copyright (C) 2010 John Wiley & Sons, Ltd.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Currently, power systems (PS) already accommodate a substantial penetration of distributed generation (DG) and operate in competitive environments. In the future, as the result of the liberalisation and political regulations, PS will have to deal with large-scale integration of DG and other distributed energy resources (DER), such as storage and provide market agents to ensure a flexible and secure operation. This cannot be done with the traditional PS operational tools used today like the quite restricted information systems Supervisory Control and Data Acquisition (SCADA) [1]. The trend to use the local generation in the active operation of the power system requires new solutions for data management system. The relevant standards have been developed separately in the last few years so there is a need to unify them in order to receive a common and interoperable solution. For the distribution operation the CIM models described in the IEC 61968/70 are especially relevant. In Europe dispersed and renewable energy resources (D&RER) are mostly operated without remote control mechanisms and feed the maximal amount of available power into the grid. To improve the network operation performance the idea of virtual power plants (VPP) will become a reality. In the future power generation of D&RER will be scheduled with a high accuracy. In order to realize VPP decentralized energy management, communication facilities are needed that have standardized interfaces and protocols. IEC 61850 is suitable to serve as a general standard for all communication tasks in power systems [2]. The paper deals with international activities and experiences in the implementation of a new data management and communication concept in the distribution system. The difficulties in the coordination of the inconsistent developed in parallel communication and data management standards - are first addressed in the paper. The upcoming unification work taking into account the growing role of D&RER in the PS is shown. It is possible to overcome the lag in current practical experiences using new tools for creating and maintenance the CIM data and simulation of the IEC 61850 protocol – the prototype of which is presented in the paper –. The origin and the accuracy of the data requirements depend on the data use (e.g. operation or planning) so some remarks concerning the definition of the digital interface incorporated in the merging unit idea from the power utility point of view are presented in the paper too. To summarize some required future work has been identified.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents a Unit Commitment model with reactive power compensation that has been solved by Genetic Algorithm (GA) optimization techniques. The GA has been developed a computational tools programmed/coded in MATLAB. The main objective is to find the best generations scheduling whose active power losses are minimal and the reactive power to be compensated, subjected to the power system technical constraints. Those are: full AC power flow equations, active and reactive power generation constraints. All constraints that have been represented in the objective function are weighted with a penalty factors. The IEEE 14-bus system has been used as test case to demonstrate the effectiveness of the proposed algorithm. Results and conclusions are dully drawn.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Este trabalho é baseado no simulador de redes PST2200 do Laboratório de Sistemas de Energia (LSE) pois está avariado com vários problemas conhecidos, designadamente: - Defeito de isolamento (disparo de diferencial), - Desregulação da velocidade da máquina primária (motor DC), - Circuito de excitação da máquina síncrona inoperacional, - Inexistência de esquemas elétricos dos circuitos do simulador, - Medidas desreguladas e com canais de medida com circuito impresso queimado. O trabalho executado foi: - O levantamento e desenho de raiz (não existe qualquer manual) dos esquemas dos 10 módulos do simulador, designadamente naqueles com avaria ou com desempenho problemático a fim de que se possa ter uma visão mais pormenorizada dos circuitos e seus problemas, por forma a intervir para os minimizar e resolver, - Foi realizado o diagnóstico de avaria do simulador e foram propostas soluções para os mesmos, - Realizaram-se as intervenções propostas e aprovadas. Nas intervenções realizadas, os princípios orientadores foram: - Aumentar a robustez do equipamento por forma a garantir a sua integridade a utilizações menos apropriados e manobras 'exóticas' próprias de alunos, que pela sua condição, estão em fase de aprendizagem, - Atualizar o equipamento, colocando-o em sintonia com o 'estado da arte', - Como fator de valorização suplementar, foi concebida e aplicada a supervisão remota do funcionamento do simulador através da rede informática. Foram detetados inúmeros erros: - Má ligação do motor de corrente continua ao variador, resultando a falta de controlo da frequência da rede do sistema, - Ligações entre painéis trocadas resultando em avarias diversas das fontes de alimentação, - Cartas eletrónicas de medidas avariadas e que além de se reparar, foram também calibradas. Devido ao mecenato da empresa Schnitt + Sohn participando monetariamente, fez-se o projeto de alteração e respetiva execução de grande parte do simulador aumentando a fiabilidade do mesmo, diminuindo assim a frequência das avarias naturais mais as que acontecem involuntariamente devido a este ser um instrumento didático. Além do trabalho elétrico, foi feito muito trabalho de chaparia para alteração de estrutura e suporte do material com diferenças de posicionamento. Neste trabalho dá-se também alguns exemplos de cálculo e simulação das redes de transporte que se pode efetuar no simulador como estudo e simulação de avarias num sistema produtivo real. Realizou-se a monitorização de dois aparelhos indicadores de parâmetros de energia (Janitza UMG96S) através duma rede com dois protocolos ethernet e profibus utilizando o plc (Omron CJ2M) como valorização do trabalho.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Trabalho Final de Mestrado para a obtenção do grau de Mestre em Engenharia Mecânica /Energia

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Solar photovoltaic systems are an increasing option for electricity production, since they produce electrical energy from a clean renewable energy resource, and over the years, as a result of the research, their efficiency has been increasing. For the interface between the dc photovoltaic solar array and the ac electrical grid is necessary the use of an inverter (dc-ac converter), which should be optimized to extract the maximum power from the photovoltaic solar array. In this paper is presented a solution based on a current-source inverter (CSI) using continuous control set model predictive control (CCS-MPC). All the power circuits and respective control systems are described in detail along the paper and were tested and validated performing computer simulations. The paper shows the simulation results and are drawn several conclusions.