982 resultados para Shewhart control chart
Resumo:
Traditionally, an (X) over bar chart is used to control the process mean and an R chart is used to control the process variance. However, these charts are not sensitive to small changes in the process parameters. The adaptive ($) over bar and R charts might be considered if the aim is to detect small disturbances. Due to the statistical character of the joint (X) over bar and R charts with fixed or adaptive parameters, they are not reliable in identifing the nature of the disturbance, whether it is one that shifts the process mean, increases the process variance, or leads to a combination of both effects. In practice, the speed with which the control charts detect process changes may be more important than their ability in identifying the nature of the change. Under these circumstances, it seems to be advantageous to consider a single chart, based on only one statistic, to simultaneously monitor the process mean and variance. In this paper, we propose the adaptive non-central chi-square statistic chart. This new chart is more effective than the adaptive (X) over bar and R charts in detecting disturbances that shift the process mean, increase the process variance, or lead to a combination of both effects. Copyright (c) 2006 John Wiley & Sons, Ltd.
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
Objectives To evaluate quality of care delivered to patients presenting to the emergency department (ED) with pain and managed by emergency nurse practitioners by measuring: 1) Evaluate time to analgesia from initial presentation 2) Evaluate time from being seen to next analgesia 3) Pain score documentation Background The delivery of quality care in the emergency department (ED) is emerging as one of the most important service indicators being measured by health services. Emergency nurse practitioner services are designed to improve timely, quality care for patients. One of the goals of quality emergency care is the timely and effective delivery of analgesia for patients. Timely analgesia is an important indicator of ED service performance. Methods A retrospective explicit chart review of 128 consecutive patients with pain and managed by emergency nurse practitioners was conducted. Data collected included demographics, presenting complaint, pain scores, and time to first dose of analgesia. Patients were identified from the ED Patient Information System (Cerner log) and data were extracted from electronic medical records Results Pain scores were documented in 67 (52.3%; 95% CI: 43.3-61.2) patients. The median time to analgesia from presentation was 60.5 (IQR 30-87) minutes, with 34 (26.6%; 95% CI: 19.1-35.1) patients receiving analgesia within 30 minutes of presentation to hospital. There were 22 (17.2%; 95% CI: 11.1-24.9) patients who received analgesia prior to assessment by a nurse practitioner. Among patients that received analgesia after assessment by a nurse practitioner, the median time to analgesia after assessment was 25 (IQR 12-50) minutes, with 65 (61.3%; 95% CI: 51.4-70.6) patients receiving analgesia within 30 minutes of assessment. Conclusions The majority of patients assessed by nurse practitioners received analgesia within 30 minutes after assessment. However, opportunities for substantial improvement in such times along with documentation of pain scores were identified and will be targeted in future research.
Resumo:
Thesis submitted to the Instituto Superior de Estatística e Gestão de Informação da Universidade Nova de Lisboa in partial fulfillment of the requirements for the Degree of Doctor of Philosophy in Information Management – Geographic Information Systems
Resumo:
This short paper addresses the problem of designing a QFT (quantitative feedback theory) based controllers for the vibration reduction in a 6-story building structure equipped with shear-mode magnetorheological dampers. A new methodology is proposed for characterizing the nonlinear hysteretic behavior of the MR damper through the uncertainty template in the Nichols chart. The design procedure for QFT control design is briefly presented
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
In this article, we propose new control charts for monitoring the mean vector and the covariance matrix of bivariate processes. The traditional tools used for this purpose are the T (2) and the |S| charts. However, these charts have two drawbacks: (1) the T (2) and the |S| statistics are not easy to compute, and (2) after a signal, they do not distinguish the variable affected by the assignable cause. As an alternative to (1), we propose the MVMAX chart, which only requires the computation of sample means and sample variances. As an alternative to (2), we propose the joint use of two charts based on the non-central chi-square statistic (NCS statistic), named as the NCS charts. Once the NCS charts signal, the user can immediately identify the out-of-control variable. In general, the synthetic MVMAX chart is faster than the NCS charts and the joint T (2) and |S| charts in signaling processes disturbances.
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
A Fortran computer program is given for the computation of the adjusted average time to signal, or AATS, for adaptive (X) over bar charts with one, two, or all three design parameters variable: the sample size, n, the sampling interval, h, and the factor k used in determining the width of the action limits. The program calculates the threshold limit to switch the adaptive design parameters and also provides the in-control average time to signal, or ATS.
Resumo:
An economic-statistical model is developed for variable parameters (VP) (X) over bar charts in which all design parameters vary adaptively, that is, each of the design parameters (sample size, sampling interval and control-limit width) vary as a function of the most recent process information. The cost function due to controlling the process quality through a VP (X) over bar chart is derived. During the optimization of the cost function, constraints are imposed on the expected times to signal when the process is in and out of control. In this way, required statistical properties can be assured. Through a numerical example, the proposed economic-statistical design approach for VP (X) over bar charts is compared to the economic design for VP (X) over bar charts and to the economic-statistical and economic designs for fixed parameters (FP) (X) over bar charts in terms of the operating cost and the expected times to signal. From this example, it is possible to assess the benefits provided by the proposed model. Varying some input parameters, their effect on the optimal cost and on the optimal values of the design parameters was analysed.
Resumo:
A standard X chart for controlling a process takes regular individual observations, for instance every half hour. This article proposes a modification of the X chart that allows one to take supplementary samples. The supplementary sample is taken (and the (X) over bar and R values computed) when the current value of X falls outside the control limits. With the supplementary sample, the signal of out-of-control is given by an (X) over bar value outside the (X) over bar chart's control limits or an R value outside the R chart's control limit. The proposed chart is designed to hold the supplementary sample frequency, during the in-control period, as low as 5% or less. In this context, the practitioner might prefer to verify an out-of-control condition by simply comparing the (X) over bar and R values with the control limits. In other words, without plotting the (X) over bar and R points. The X chart with supplementary samples has two major advantages when compared with the standard (X) over bar and A charts: (a) the user will be plotting X values instead of (X) over bar and R values; (b) the shifts in the process mean and/or changes in the process variance are detected faster.
Resumo:
The T-2 and the generalized variance vertical bar S vertical bar charts are used for monitoring the mean vector and the covariance matrix of multivariate processes. In this article, we propose for bivariate processes the use of the T-2 and the VMAX charts. The points plotted on the VMAX chart correspond to the maximum of the sample variances of the two quality characteristics. The reason to consider the VMAX statistic instead of the generalized variance vertical bar S vertical bar is the user's familiarity with the computation of simple sample variances; we can't say the same with regard to the computation of the generalized variance vertical bar S vertical bar.
Resumo:
In this article, we propose a new statistic to control the covariance matrix of bivariate processes. This new statistic is based on the sample vat-lances of the two quality characteristics, shortly VMAX statistic. The points plotted on the chart correspond to the maximum of the values of these two variances. The reasons to consider the VMAX statistic instead of the generalized variance vertical bar S vertical bar are faster detection of process changes and better diagnostic feature, that is, with the VMAX statistic It is easier to identify the out-of-control variable.
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
Recent theoretical studies have shown that the X̄ chart with variable sampling intervals (VSI) and the X̄ chart with variable sample size (VSS) are quicker than the traditional X̄ chart in detecting shifts in the process. This article considers the X̄ chart with variable sample size and sampling intervals (VSSI). It is assumed that the amount of time the process remains in control has exponential distribution. The properties of the VSSI X̄ chart are obtained using Markov chains. The VSSI X̄ chart is even quicker than the VSI or VSS X̄ charts in detecting moderate shifts in the process.