776 resultados para Road construction industry


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Includes bibliographical references.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Includes index.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This article explores the notion that the workplace is a learning environment, and that the line manager is a key player determining its effectiveness. The work discusses how performance management systems may be used to clarify expectations made of line managers with regard to employee development. The work, in addition, suggests that line manager people management expertise may be a factor inhibiting workplace development for subordinates, and makes a number of suggestions about how to prepare the line manager for effective employee development. Key issues are illustrated by reference to a case study example. The case demonstrates that a high profile management development programme within a major international organisation failed to meet all objectives because of the unwillingness of the line management team to participate in the development of subordinates back in the workplace.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The thesis addresses the economic impacts of construction safety in Greece. The research involved the development of a methodology for determining the overall costs of safety, namely the sum of the costs of accidents and the costs of safety management failures (with or without accident) including image cost. Hitherto, very little work has been published on the cost of accidents in practical case studies. Moreover, to the author’s belief, no research has been published that seeks to determine in real cases the costs of prevention. The methodology developed is new, transparent, and capable of being replicated and adapted to other employment sectors and to other countries. The methodology was applied to three construction projects in Greece to test the safety costing methodology and to offer some preliminary evidence on the business case for safety. The survey work took place between 1999 and 2001 and involved 27 months of costing work on site. The study focuses on the overall costs of safety that apply to the main (principal) contractor. The methodology is supported by 120 discrete cost categories, and systematic criteria for determining which costs are included (counted) in the overall cost of safety. A quality system (in compliance with ISO9000 series) was developed to support the work and ensure accuracy of data gathering. The results of the study offer some support for the business case for safety. Though they offer good support for the economics of safety as they demonstrate need for cost effectiveness. Subject to important caveats, those projects that appeared to manage safety more cost-effectively achieved the lowest overall safety cost. Nevertheless, results are significantly lower than of other published works for two main reasons; first costs due to damages with no potential to injury were not included and second only costs to main constructor were considered. Study’s results are discussed and compared with other publish works.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY WITH PRIOR ARRANGEMENT

Relevância:

100.00% 100.00%

Publicador:

Resumo:

DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The object of this project was to identify those elements of management practice which characterised firms in the West Midlands Road Transport Industry. The object being to establish the contents of what might be termed a management policy portfolio for growth. The First Phase was the review of those factors which were generally accepted as having an influence on the success rate of transport firms in order to ascertain if they explained observed patterns. Secondly, if this were not the case, to instigate a field work study to isolate those policies which were associated with growth organizations. Investigation of the vehicle movements for the entire West Midlands Fleet over a complete licence cycle suggested that conventional explanations could not fully account for the observed patterns. To carry out the second phase of the study a sample of growth firms were visited in order to measure their attitudes on a range of factors hypothesised to affect growth. Field data were analysed to establish management activities over a wide range of areas and the results further investigated through a Principal Components and Cluster Analysis programme. The outcome of the study indicates that some past attitudes on the skills and attitudes of transport managers may have to be re-examined. As a result, the project produced a new classification of road transport firms based not on the conventional categories of long and short haul, or the types of traffics carried, but on the marketing policies and management skills employed within the organization.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This thesis examines the ways that libraries have employed computers to assist with housekeeping operations. It considers the relevance of such applications to company libraries in the construction industry, and describes more specifically the development of an integrated cataloguing and loan system. A review of the main features in the development of computerised ordering, cataloguing and circulation control systems shows that fully integrated packages are beginning to be completed, and that some libraries are introducing second generation programs. Cataloguing is the most common activity to be computerised, both at national and company level. Results from a sample of libraries in the construction industry suggest that the only computerised housekeeping system is at Taylor Woodrow. Most of the firms have access to an in-house computer, and some of the libraries, particularly those in firms of consulting engineers, might benefit from computerisation, but there are differing attitudes amongst the librarians towards the computer. A detailed study of the library at Taylor Woodrow resulted in a feasibility report covering all the areas of its activities. One of the main suggestions was the possible use of a computerised loans and cataloguing system. An integrated system to cover these two areas was programmed in Fortran and implemented. This new system provides certain benefits and saves staff time, but at the cost of time on the computer. Some improvements could be made by reprogramming, but it provides a general system for small technical libraries. A general equation comparing costs for manual and computerised operations is progressively simplified to a form where the annual saving from the computerised system is expressed in terms of staff and computer costs and the size of the library. This equation gives any library an indication of the savings or extra cost which would result from using the computerised system.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Several roads in Iceland with bio-oil modified surface dressings exhibited severe distresses such as bleeding, binder drain down, and eventually as surface dressing sticking to tires. Samples from six road sections were evaluated in the laboratory to determine the causes of the failure. Binders with and without bio-oil, rapeseed oil and fish oil, were evaluated through a comprehensive rheological and chemical characterization. Both oils, exhibited solubility issues with the bitumen; consequently, the oils covered the aggregates, preventing bonding between binder and stones. It appears that fish oil worked a little better than rapeseed oil for binder modification.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT