918 resultados para Project reporting tools
Resumo:
The focus of the present research was to investigate how Local Governments in Queensland were progressing with the adoption of delineated DM policies and supporting guidelines. The study consulted Local Government representatives and hence, the results reflect their views on these issues. Is adoption occurring? To what degree? Are policies and guidelines being effectively implemented so that the objective of a safer, more resilient community is being achieved? If not, what are the current barriers to achieving this, and can recommendations be made to overcome these barriers? These questions defined the basis on which the present study was designed and the survey tools developed. While it was recognised that LGAQ and Emergency Management Queensland (EMQ) may have differing views on some reported issues, it was beyond the scope of the present study to canvass those views. The study resolved to document and analyse these questions under the broad themes of: • Building community capacity (notably via community awareness). • Council operationalisation of DM. • Regional partnerships (in mitigation/adaptation). Data was collected via a survey tool comprising two components: • An online questionnaire survey distributed via the LGAQ Disaster Management Alliance (hereafter referred to as the “Alliance”) to DM sections of all Queensland Local Government Councils; and • a series of focus groups with selected Queensland Councils
Resumo:
The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its efficacy on project outcomes. In such circumstances, there is a lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC.
Resumo:
Sing & Grow is an early intervention music therapy project that provides community group music therapy programs to families with young children who encounter risk factors that may impact on parenting and optimal child develop variety of evaluation tools were devised and used over the first 3 years of the project. Upon the subsequent funding and expansion of the project at the end of this period, it was necessary to find, test and devise more rigorous, valid and reliable measures to withstand the scrutiny of researchers, and to combat the concerns and criticisms associated with the previous methods of data collection. An action inquiry project was therefore undertaken with two groups of project participants to trial the use of the Parenting Stress Index and Depression, Anxiety and Stress Scales, both recommended by leading psychologists. Key findings that will be discussed include the friction between the deficit-focussed nature of many psychometric tools and the strengths-based approach taken in service delivery, the level of difficulty in terms of literacy and comprehension for vulnerable respondents, and the lack of one tool with the ability to comprehensively measure all aspects of a broad scoping program. Keywords: music therapy, evaluation, PSI, DASS, action inquiry.
Resumo:
Project as a Capstone Learning Unit: Courses of the QUT Faculty of BEE seek to enable students to practice as professionals in their respective disciplines. A major part of such practice is the instigation, management,monitoring, and reporting on an urban development project. This unit offers the student a capstone learning experience near the end of their fourth year of undergraduate study. Expose the student to a set of integrated activities, each building upon the preceding, and culminating in a 'completed' project. Students apply skills and knowledge attained earlier in the course and develop new abilities for application to a real-world problem, industry or research based, to simulate the design, development and management of a project solution. These 10-12minute seminar presentations comprise the mini-conference event that are of benefit to the wider surveying and spatial science industry.
Resumo:
Project as a Capstone Learning Unit: Courses of the QUT Faculty of BEE seek to enable students to practice as professionals in their respective disciplines. A major part of such practice is the instigation, management,monitoring, and reporting on an urban development project. This unit offers the student a capstone learning experience near the end of their fourth year of undergraduate study. Expose the student to a set of integrated activities, each building upon the preceding, and culminating in a 'completed' project. Students apply skills and knowledge attained earlier in the course and develop new abilities for application to a real-world problem, industry or research based, to simulate the design, development and management of a project solution. These 10-12minute seminar presentations comprise the mini-conference event that are of benefit to the wider surveying and spatial science industry. Additionally Includes MAPMYTOWN 2010, Bell Darling Downs, summary of QUT contributions.
Resumo:
This report is a formative evaluation of the operations of the DEEWR funded Stronger Smarter Learning Community (SSLC) project from September 2009 to July 2011. It is undertaken by an independent team of researchers from Queensland University of Technology, the University of Newcastle and Harvard University. It reports on findings from: documentary analysis; qualitative case studies of SSLC Hub schools; descriptive, multivariate and multilevel analysis of survey data from school leaders and teachers from SSLC Hub and Affiliate schools and from a control group of non-SSLC schools; and multilevel analysis of school-level data on SSLC Hubs, Affiliates and ACARA like-schools. Key findings from this work are that: • SSLC school leaders and teachers are reporting progress in changing school ethos around issues of: recognition of Indigenous identity, Indigenous leadership, innovative approaches to staffing and school models, Indigenous community engagement and high expectations leadership; • Many Stronger Smarter messages are reportedly having better uptake in schools with high percentages of Indigenous students; • There are no major or consistent patterns of differences between SSLC and non-SSLC schools in teacher and school leader self-reports of curriculum and pedagogy practices; and • There is no evidence to date that SSLC Hubs and Affiliates have increased attendance or increased achievement gains compared to ACARA like-schools. Twenty-one months is relatively early in this school reform project. Hence the major focus of subsequent reports will be on the documentation of comparative longitudinal gains in achievement tests and improved attendance. The 2011 and 2012 research also will model the relationships between change in school ethos/climate, changed Indigenous community relations, improved curriculum/pedagogy, and gains in Indigenous student achievement, attendance and outcomes. The key challenge for SSLC and the Stronger Smarter approach will be whether it can systematically generate change and reform in curriculum and pedagogy practices that can be empirically linked to improved student outcomes.
Resumo:
Despite an increasing highlight on the sustainability agenda by the construction industry, sustainable development is often treated with different philosophy, interpretation, and responsibility at various stages of project development by various stakeholders involved. The actual sustainability deliverables from the industry is not substantially tangible, especially at project levels. For infrastructure projects which typically span over long periods of time, achieving consistent sustainability outcomes during various stages of development remains as a formidable task. The absence of common understanding among stakeholders and the lack of appropriate sustainability reporting mechanism are possible causes. Many policies dealing with these issues tend to be too generic and broad-based for practical adaptation. While there had been a plenty of research initiatives on sustainability assessment, there is often a gap between sustainability deliverables during project implementation and the grandeur of promises during project conception. This paper reviews the historical context of sustainable development and its principles, and past studies on sustainable construction, focusing on infrastructure projects. It goes on to introduce a QUT research project aimed at identifying and integrating the different perceptions and priority needs of the stakeholders, along with identifying issues that impact on the gap between sustainability foci and its actual realization at project end level, in order to generate a framework of enhancing sustainable deliverables. It is expected that the research will help promote more integrated approaches to decision-making on the implementation of sustainability strategies and foci during the construction project delivery processes.
Resumo:
This instrument was used in the project entitled Teachers Reporting Child Sexual Abuse: Towards Evidence-based Reform of Law, Policy and Practice (ARC DP0664847)
Resumo:
This instrument was used in the project named Teachers Reporting Child Sexual Abuse: Towards Evidence-based Reform of Law, Policy and Practice (ARC DP0664847)
Resumo:
This instrument was used in the project named Teachers Reporting Child Sexual Abuse: Towards Evidence-based Reform of Law, Policy and Practice (ARC DP0664847)
Resumo:
The purpose of this paper is to show how project management governance is addressed through the use of a specific meta-method. Governance is defined here on two criteria: accountability and performance. Accountability is promoted through transparency and performance is promoted by responsive and responsible decision-making. According to a systemic perspective, transparency and decision-making involve having information, tacit or explicit knowledge, as well as understanding of the context, the different parameters and variables, their interaction and conditions of change. Although this method of methods was built according a heuristic process involving 25 years of various researches and consulting activities, it seems appropriate to draw its foundations. I clarify first my epistemological position and the notion of project and project management, as Art and Science. This lead me to define a "Be" / "Have" posture to this regards. Then, the main theoretical roots of MAP Method are exposed: Boisot' s Social Learning Cycle, Praxeology and Theory of Convention. Then we introduced the main characteristics of the method and the 17 methods and tools constituting MAP "tool box", thus with regard to the project management governance perspective. Finally, I discuss the integration of two managerial modes (operational and project modes) and the consequence in term of governance in a specific socio-techno-economic project/context ecosystem.
Resumo:
Foreword: In this paper I call upon a praxiological approach. Praxeology (early alteration of praxiology) is the study of human action and conduct. The name praxeology/praxiologyakes is root in praxis, Medieval Latin, from Greek, doing, action, from prassein to do, practice (Merriam-Webster Dictionary). Having been involved in project management education, research and practice for the last twenty years, I have constantly tried to improve and to provide a better understanding/knowledge of the field and related practice, and as a consequence widen and deepen the competencies of the people I was working with (and my own competencies as well!), assuming that better project management lead to more efficient and effective use of resources, development of people and at the end to a better world. For some time I have perceived a need to clarify the foundations of the discipline of project management, or at least elucidate what these foundations could be. An immodest task, one might say! But not a neutral one! I am constantly surprised by the way the world (i.e., organizations, universities, students and professional bodies) sees project management: as a set of methods, techniques, tools, interacting with others fields – general management, engineering, construction, information systems, etc. – bringing some effective ways of dealing with various sets of problems – from launching a new satellite to product development through to organizational change.
Resumo:
Law has been a close partner to sociology from its very beginning, and the partnership often has proven to be extremely prolific for sociology. Grand theories as well as vital conceptual tools can be counted among its offspring. Both disciplines share the common ground of socio-legal studies, which has developed into a nearly independent interdisciplinary enterprise where legal scholars and sociologists happily meander between the normative and the analytical. From the vast array of topics in the field of socio-legal studies I select the sociology of criminal justice and punishment in order to demonstrate the characteristics of this relationship. The partnership between sociology and law emerged as part of the modernization project in the 19th and 20th centuries, and the sociology of punishment was part of this endeavour. Rooted in a strong tradition of old (Durkheim) and new (Elias, Foucault) classics, recent developments in this field are leaving the idea of an `unproblematically modern punishment' (Whitman, 2005a) behind, and new fields of inquiry for comparative lawyers and sociologists are opening up.
Resumo:
The QUT Centre for Subtropical Design reviewed tools and indices that measure ‘liveability’ on behalf of the Brisbane Development Association. This review provides insight into the concept of ‘liveability’ and how various international and local tools measure or value ‘liveability’ of cities. Liveability is subjective, and can mean different things to different individuals depending upon their situation and lifecycle stage, and is therefore difficult to define. Essentially, the term ‘liveability’ constitutes thoughts of quality of life and wellbeing of residents in urban environments.
Resumo:
Purpose – The purpose of this paper is to provide a summary description of the doctoral thesis investigating the field of project management (PM) deployment. Researchers will be informed of the current contributions within this topic and of the possible further investigations and researches. The decision makers and practitioners will be aware of a set of tools addressing the PM deployment with new perspectives. Design/methodology/approach – Research undertaken with the thesis is based on quantitative methods using time series statistics (time distance analysis) and comparative and correlation analysis aimed to better define and understand the PM deployment within and between countries or groups. Findings – The results suggest a project management deployment index (PMDI) to objectively measure the PM deployment based on the concept of certification. A proposed framework to empirically benchmark the PM deployment between countries by integrating the PMDI time series with the two dimensional comparative analysis of Sicherl. The correlation analysis within Hoftsede cultural framework shows the impact of the national culture dimensions on the PM deployment. The forecasting model shows a general continual growth trend of the PM deployment, with continual increase in the time distance between the countries. Research limitations/implications – The PM researchers are offered an empirical quantification on which they can construct further investigations and understanding of this phenomenon. The number of possible units that can be studied offers wide possibilities to replicate the thesis work. New researches can be undertaken to investigate further the contribution of other social or economical indicators, or to refine and enrich the definition of the PMDI indicator. Practical implications – These results have important implications on the PM deployment approaches. The PMDI measurements and time series comparisons facilitate considerably the measurement and benchmarking between the units (e.g. countries) and against targets, while the readiness setting of the studied unit (in terms of development and cultural levels) impacts the PM deployment within this country. Originality/value – This paper provides a summary of cutting-edge research work in the studied field of PM deployment and a link to the published works that researchers can use to help them understand the thesis research as well as how it can be extended.