989 resultados para Project performance Infrastructure


Relevância:

80.00% 80.00%

Publicador:

Resumo:

The outcomes of the construction projects can be evaluated in numerous ways. One method is to measure the satisfaction of participants as represented by the differences between their expectations and perceptions. This measurement is used widely in construction as it promises benefits, such as the improvement of product delivery, and enhances services quality by identifying some necessary changes. Commonly satisfaction measurement is gauged by evaluating the level of client satisfaction of construction performance. The measurement of customer satisfaction on the other hand, is based on the quality of the end product. This evaluation is used to encourage contractors to improve their performance to a required level and to ensure that the projects are delivered as expected- in terms of time, budget and quality. Several studies of performance measurement have indicated that contractor performance is still not satisfactory, as the outcome delivered is not as required (because of cost overruns, time overruns or because it is generally unsatisfactory). This drawback may be due to the contractors’ lack of expertise, motivation and/or satisfaction. The measurement of performance based on contractor satisfaction levels is still new and very few studies have yet taken place in the construction industry. This paper examines how the characteristics of a contracting organisation – namely its experience in the industry, background, past performance, size of organisation and financial stability- may influence its satisfaction levels with regards to project performance. Previous literature reviews and interviews are used as research tools in the preliminary investigation. The outcome is expected to present a basic understanding of contractor satisfaction measurement and its potential for improving the performance of project outcomes.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its impact on project outcomes. In such circumstances, there is lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC. A case study approach is proposed for an in-depth analysis to explore the critical issues addressed by RC in relation to project performance. Understanding the realities of RC will assist stakeholders in the construction industry with their investment in RC.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The unique characteristics of the construction industry - such as the fragmentation of its processes, varied scope of works and diversity of its participants - are contributory factors to poor project performance. Several issues are unresolved due to the lack of a comprehensive technique to measure project outcomes including: inefficient decision making, insufficient communication, uncertain site conditions, a continuously changing environment, inharmonious working relationships, mismatched objectives within the project team and a blame culture. One approach to overcoming these problems appears to be to measure performance by gauging contractor satisfaction (Co-S) levels, but this has not been widely investigated as yet. Additionally, the key Co-S dimensions at the project level are still not fully identified. ----- ----- This paper concerns a study of satisfaction dimensions, primarily by a postal questionnaire survey of construction contractors registered by the Malaysian Construction Industry Development Board (CIDB). Eight satisfaction dimensions are identified that are significantly and substantially relate to these contractors - comprising: project cost performance, schedule performance, product performance, design satisfaction, site safety, project profitability, business performance and relationships between participants. -Each of these dimensions is accorded different priority levels of satisfaction by different contractors. ----- ----- The output of this study will be useful in raising the awareness and understanding of project teams regarding contractors’ needs, mutual objectives and open communication to help to deliver a successful project.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Purpose The purpose of this paper is to explore the process, and analyse the implementation of constructability improvement and innovation result during the planning and design for sea water intake structure of fertilizer plant project. Design/methodology/approach The research methodology approach is case study method at project level. This constructability improvement process was investigated by using constructability implementation check lists, direct observation, documented lesson learned analysis and key personnel interviews. Findings The case study shows that the implementation of constructability during planning and design stage for this sea water intake structure has increased the project performance as well as improved the schedule by 5 months (14.21%) and reduced the project cost by 15.35%. Research limitations/implications This case study was limited to three (3) previous sea water intake projects as references and one (1) of new method sea water intake structure at fertilizer plant project. Practical implications A constructability improvement check list using theory and lesson learned for the specific construction project was documented. Originality/value The findings support the relevant study of constructability and provide specific lesson learned for three (3) previous project and one (1) of the new innovation method of the construction project and documented by the company.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Clients and Design-build (DB) contractors are two key stakeholders in DB projects, and contribute significantly to the successful project performance. This study aims to identify and compare such key competences in the construction market of the PRC. After the survey of available literature and face-to-face interviews, a two-round Delphi questionnaire survey was conducted to identify the key competences of clients and DB contractors in DB projects. Relative importance of these identified competences were ranked and compared. The questionnaire results indicated distinct differences between the key competences of clients and that of contractors. The contractor’s key competences emphasize on DB experience, corporate management capability, building and design expertise, financial capability, enterprise qualification and reputation. While the client’s competences focus on the ability to clearly define the project scope & requirements, financial capacity, contract management ability, adequate staff, effective coordination with DB contractor and similar DB experience. Both clients and DB contractors should clearly understand the competence requirements in DB projects and possess all the necessary competences for the successful outcome of DB projects. The identification of these key competences provides clients and DB contractors with indicators to assess their capabilities before going for the DB option. Furthermore, the comparison of competences for clients and DB contractors will result in better understanding of DB system and improve the communication between these stakeholders.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The five articles appearing in this issue reflect the depth of project management research in terms of delineating and clarifying the different philosophical positions, advancing the concepts, and applying innovative research methods. These articles focus on the ontology of project management research (“Foundations of Project Management Research: An Explicit and Six-Facet Ontological Framework” by Gauthier and Ika), project management practices relevant to different types of projects from a practitioner’s perspective (“An Empirical Identification of Project Management Toolsets and a Comparison Among Project Types” by Besner and Hobbs), the effect of project management processes on project performance (“Project Management Knowledge and Effects on Construction Project Outcomes: An Empirical Study” by Chou and Yang), determining the success metrics at different stages of a project (“A Perspective Based Understanding of Project Success” by McLeod, Doolin, and MacDonell), and identifying project success parameters and critical success factors from the point of view of different project actors in largescale projects (“Forecasting Success on Large Projects: Developing Reliable Scales to Predict Multiple Perspectives by Multiple Stakeholders Over Multiple Time Frames” by Turner and Zolin), and understanding project success from the points of view of different project stakeholders...

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The five articles appearing in this issue of the journal reflect the breadth of project management research and the cross-fertilization of ideas from other management disciplines with project management. These articles focus on the evolution of project management theory (“A Bibliometric View on the Use of Contingency Theory in Project Management Research” by Hanisch and Wald), interfirm knowledge management and learning in project networks (“Exploring Negotiation Through Boundary Objects in Global Design Project Networks” by Di Marco, Alin, and Taylor), learning within one project organization (“Organizational Learning in Project-Based Companies: A Process Thinking Approach” by Koskinen), identifying the factors affecting project performance (“Factors Causing Design Schedule Delays in Turnkey Projects in Taiwan: An Empirical Study of Power Distribution Substation Projects” by Yau and Yang), and considering the antecedents of negative employee behavior and its consequences for project team performance (“Counteracting Free-Riding With Team Morale—An Experimental Study” by He).

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Over the last few decades, construction project performance has been evaluated due to the increase of delays, cost overruns and quality failures. Growing numbers of disputes, inharmonious working environments, conflict, blame cultures, and mismatches of objectives among project teams have been found to be contributory factors to poor project performance. Performance measurement (PM) approaches have been developed to overcome these issues, however, the comprehensiveness of PM as an overall approach is still criticised in terms of the iron triangle; namely time, cost, and quality. PM has primarily focused on objective measures, however, continuous improvement requires the inclusion of subjective measures, particularly contractor satisfaction (Co-S). It is challenging to deal with the two different groups of large and small-medium contractor satisfaction as to date, Co-S has not been extensively defined, primarily in developing countries such as Malaysia. Therefore, a Co-S model is developed in this research which aims to fulfil the current needs in the construction industry by integrating performance measures to address large and small-medium contractor perceptions. The positivist paradigm used in the research was adhered to by reviewing relevant literature and evaluating expert discussions on the research topic. It yielded a basis for the contractor satisfaction model (CoSMo) development which consists of three elements: contractor satisfaction (Co-S) dimensions; contributory factors and characteristics (project and participant). Using valid questionnaire results from 136 contractors in Malaysia lead to the prediction of several key factors of contractor satisfaction and to an examination of the relationships between elements. The relationships were examined through a series of sequential statistical analyses, namely correlation, one-way analysis of variance (ANOVA), t-tests and multiple regression analysis (MRA). Forward and backward MRAs were used to develop Co-S mathematical models. Sixteen Co-S models were developed for both large and small-medium contractors. These determined that the large contractor Malaysian Co-S was most affected by the conciseness of project scope and quality of the project brief. Contrastingly, Co-S for small-medium contractors was strongly affected by the efficiency of risk control in a project. The results of the research provide empirical evidence in support of the notion that appropriate communication systems in projects negatively contributes to large Co-S with respect to cost and profitability. The uniqueness of several Co-S predictors was also identified through a series of analyses on small-medium contractors. These contractors appear to be less satisfied than large contractors when participants lack effectiveness in timely authoritative decision-making and communication between project team members. Interestingly, the empirical results show that effective project health and safety measures are influencing factors in satisfying both large and small-medium contractors. The perspectives of large and small-medium contractors in respect to the performance of the entire project development were derived from the Co-S models. These were statistically validated and refined before a new Co-S model was developed. Developing such a unique model has the potential to increase project value and benefit all project participants. It is important to improve participant collaboration as it leads to better project performance. This study may encourage key project participants; such as client, consultant, subcontractor and supplier; to increase their attention to contractor needs in the development of a project. Recommendations for future research include investigating other participants‟ perspectives on CoSMo and the impact of the implementation of CoSMo in a project, since this study is focused purely on the contractor perspective.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Downtime (DT) caused by non-availability of equipment and equipment breakdown has non-trivial impact on the performance of construction projects. Earlier research has often addressed this fact, but it has rarely explained the causes and consequences of DT – especially in the context of developing countries. This paper presents a DT model to address this issue. Using this model, the generic factors and processes related to DT are identified, and the impact of DT is quantified. By applying the model framework to nine road projects in Nepal, the impact of DT is explored in terms of its duration and cost. The research findings highlight how various factors and processes interact with each other to create DT, and mitigate or exacerbate its impact on project performance. It is suggested that construction companies need to adopt proactive equipment management and maintenance programs to minimize the impact of DT.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper reviews innovation activity in a key service industry – road and bridge construction. Based on a large-scale Australian survey and descriptive statistics, the paper finds that there is little difference in innovation levels between different types of industry participants and that innovation is difficult to implement. The survey gathered responses from suppliers, consultants, contracts and clients and compared results across these four industry sectors. The absorptive capacity and relationship capacities of respondents were also investigated. One in five respondents had poor absorptive capacity. Suppliers were found to the most effective learners and were the best adopters of ideas from outside their organisations and consultants were the least effective. Australian construction organisations have relatively good relationship skills because relationship-based contracts are common compared to other countries. Indeed, the survey found that nearly 60% of respondents had experience with such contracts, with clients having more experience than the other three sectors. The results have implications for the measurement of innovation in project-based industries, and the relative roles of clients and suppliers in driving innovation in the construction industry. Further research will examine the extent to which particular governance mechanisms within relationship contracts lead to improved innovation and project performance.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The construction industry has long been burdened with inherent adversarial relationships among the parties and the resulting disputes. Dispute review boards (DRBs) have emerged as alternatives to settle construction-related disputes outside courts. Although DRBs have found support in some quarters of the construction industry, the quantitative assessment of the impact of DRBs has not been adequately addressed. This paper presents the results of a research project undertaken to assess the impact of DRBs on the construction program of a large-scale highway agency. Three dimensions of DRB impact were assessed: (1) influence on project cost and schedule performance, (2) effectiveness of DRBs in preventing and resolving construction disputes, and (3) costs of DRB implementation. The analyses encompass data from approximately 3,000 projects extending over a 10-year period (2000–2009). Quantitative measures of performance were developed and analyzed for each category. Projects that used DRBs faced reduced costs and schedule growth (6.88 and 12.92%, respectively) when compared to non-DRB projects (11.53 and 28.96%). DRBs were also found to be effective in avoiding and settling disputes; the number of arbitration cases reduced consistently after DRB implementation, and DRBs have a success rate of 97% in settling disputes for which DRBs were used. Moreover, costs of DRBs were found to comprise a relatively small fraction (i.e., approximately 0.3%) of total project budgets. It was concluded that DRBs were effective dispute prevention and resolution alternatives with no significant adverse effects on project performance.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Building Information Modelling (BIM) has been regarded as a one stop shop capable of addressing the ills of the construction industry. Yet, while some firms have accepted BIM as a new way to work and gone on to record success, others (which have not so done) have raised such questions as: ‘How is BIM defined? Is it a tool or a process? Which kinds and sizes of organisations stand to benefit from BIM?’ These questions form the basis of this research. Hence, having explored the relevant body of literature, this research investigates three organisations within the UK – described as the earliest adopters of BIM – and considers how they have fared in terms of project performance in the years since adopting BIM; focusing on project cost, delivery time and quality achievement. This investigation also probed two of the leading voices in BIM in the UK in search of the much needed answers. The findings of the research show that successful projects executed in the organisations that have used BIM is predicated on its adoption as a process, rather than as a tool of technology; a process that changes the way work in the construction industry is typically done. Moreover, the successes recorded in the firms researched give credence to project success consequent upon adopting BIM. Nevertheless, the findings of this research show that the cornerstone of this success is leadership-driven innovation.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Workplace stress has been an increasing concern in the construction industry. Workers are working longer hours and construction managers’ responsibilities are becoming more complex and complicated due to reduced resources and widespread stakeholder involvements. These additional pressures potentially trigger workplace stress and impact on project performance. The purpose of this study is to examine and advance understanding of stress and its impact relationships that support holistic and strategic stress management. 17 key stress sources are identified with their impact relationships on different stress types examined. Based on the research findings, this paper concludes with a Stressor-Stress-Performance relationships map.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Suppliers are increasingly involved in buyer firms’ interorganizational new product development (NPD) teams. Yet the transfer of knowledge within this context may be subject to varying degrees of causal ambiguity, potentially limiting the effect of supplier involvement on performance. We develop a theoretical model exploring the effect of supplier involvement practices on the level of causal ambiguity within interorganizational NPD teams, and the subsequent impact on competitor imitation, new product advantage, and project performance. Our model also serves as a test of the paradox that causal ambiguity both inhibits imitation by competitors, but also adversely affects organisational outcomes. Results from an empirical study of 119 R&D intensive manufacturing firms in the United Kingdom largely support these hypotheses. Results from structural equation modeling show that supplier involvement orientation and long-term commitment lower causal ambiguity within interorganizational NPD teams. In turn, this lower causal ambiguity generates a new product advantage and increases project performance for the buyer firm, but has no significant effect on competitor imitation. Instead, competitor imitation is delayed by the extent to which the firm develops a new product advantage within the market. These results shed light on the causal ambiguity paradox showing that lower causal ambiguity during interorganizational new product development increases both product and project performance, but without reducing barriers to imitation. Product development managers are encouraged to utilize supplier involvement practices to minimise ambiguity in the NPD project, and to target their supplier involvement efforts on solving causally ambiguous technological problems to sustain a competitive advantage.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

No âmbito da unidade curricular Dissertação/Projeto/Estágio do 2º ano do Mestrado em Engenharia mecânica – Ramo Gestão Industrial do Instituto Superior de Engenharia do Porto, o presente trabalho de dissertação foi enquadrado num projeto de desenvolvimento de ferramentas de apoio à gestão de projetos. O projeto foi desenvolvido no Instituto de Engenharia Mecânica e Gestão Industrial (INEGI) na unidade de Desenvolvimento de Produto e Sistemas (DPS). A realização deste projeto teve como objetivo o desenvolvimento e adequação de ferramentas de apoio à gestão de multi-projeto no processo de desenvolvimento de produto na organização em estudo – o INEGI – DPS. A gestão de projetos tem hoje uma grande importância nos resultados das empresas essencialmente em virtude da necessidade de estas competirem num mundo em grande mudança com concorrentes ferozes, em que a capacidade de responder às mudanças a tempo e de uma forma integrada se torna cada vez mais importante. A atividade levada a cabo pela DPS impõe a necessidade de uma gestão de projetos mais eficaz e eficiente suportada numa gestão de informação centralizada. O presente projeto de investigação teve, numa primeira fase, uma adaptação à organização em estudo. De seguida, foi conduzida uma revisão da literatura com o objetivo de se obter a fundamentação teórica necessária ao desenvolvimento de ferramentas com base nas metodologias lean. Prosseguiu com o levantamento da situação inicial da organização e com a identificação dos problemas existentes na gestão de projetos. Incluiu também uma revisão e análise das ferramentas existentes na unidade em estudo. Este conhecimento permitiu delinear uma visão para guiar o desenvolvimento das ferramentas. Após a definição da visão foi, então, realizado o desenvolvimento das ferramentas de auxílio à gestão multi-projeto na organização. A concretização deste trabalho resultou no desenvolvimento de três ferramentas de auxílio à gestão multi-projeto na unidade. Estas ferramentas tornam o processo de gestão de projetos mais simples e fácil de assimilar, requerendo apenas alguns inputs por parte dos colaboradores. Estas ferramentas estão apoiadas nos pilares do lean, e deste modo estão vocacionadas para reduzir o desperdício, promover a melhoria contínua, aumentar o desempenho global dos vários atores nos projetos de modo a entregar mais valor e qualidade superior com menores custos. Acima de tudo, valorizar o trabalho dos colaboradores, tornando-os mais eficientes, eficazes, motivados e comprometidos com a organização.