905 resultados para Organ Procurement


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Public road authorities have a key responsibility in driving initiatives for reducing greenhouse gas (GHG) emissions in the road construction project lifecycle. A coherent and efficient chain of procurement processes and methods is needed to convert green policies into tangible actions that capture the potential for GHG reduction. Yet, many infrastructure clients lack developed methodologies regarding green procurement practices. Designing more efficient solutions for green procurement requires an evaluation of the current initiatives and stages of development. A mapping of the current GHG reduction initiatives in Australian public road procurement is presented in this paper. The study includes the five largest Australian state road authorities, which cover 94% of the total 817,089 km of Australian main roads (not local) and account for 96% of the total A$13 billion annual major road construction and maintenance expenditure. The state road authorities’ green procurement processes and tools are evaluated based on interviews and a review of documents. Altogether 12 people, comprising 1-3 people of each organisation, participated in the interviews and provided documents. An evaluation matrix was developed for mapping the findings across the lifecycle of road construction project delivery. The results show how Australian state road authorities drive decisions with an impact on GHG emissions on the strategic planning phase, project development phase, and project implementation phase. The road authorities demonstrate varying levels of advancement in their green procurement methodologies. Six major gaps in the current green procurement processes are identified and, respectively, six recommendations for future research and development are suggested. The greatest gaps remain in the project development phase, which has a critical role in fixing the project (GHG reduction) goals, identifying risks and opportunities, and selecting the contractor to deliver the project. Specifically, the role of mass-haul optimisation as a part of GHG minimisation was reviewed, and mass-haul management was found to be an underutilised element with GHG reduction potential.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

According to Tan et al. (2011), the establishment of a clear sustainability policy in the construction industry is paramount, if only as a statement of the commitment of the top management to protecting the environment and enhancing social responsibility. The resulting policies should then translate into proactive strategies and action plans that improve the sustainability performance of contractors and provide a competitive advantage by integrating “long-run profitability” with sustainable development efforts. The strategies should also take into account climatic protection issues through greenhouse gas emissions (GHGe) monitoring and reduction initiatives (Stocker & Luptacik, 2009)...

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Two approaches are described, which aid the selection of the most appropriate procurement arrangements for a building project. The first is a multi-attribute technique based on the National Economic Development Office procurement path decision chart. A small study is described in which the utility factors involved were weighted by averaging the scores of five 'experts' for three hypothetical building projects. A concordance analysis is used to provide some evidence of any abnormal data sources. When applied to the study data, one of the experts was seen to be atypical. The second approach is by means of discriminant analysis. This was found to provide reasonably consistent predictions through three discriminant functions. The analysis also showed the quality criteria to have no significant impact on the decision process. Both approaches provided identical and intuitively correct answers in the study described. Some concluding remarks are made on the potential of discriminant analysis for future research and development in procurement selection techniques.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Australian Government and most Australian road authorities have set ambitious greenhouse gas emission (GHGe) reduction targets for the near future, many of which have translated into action plans. However, previous research has shown that the various Australian state road authorities are at different stages of implementing ‘green’ initiatives in construction planning and development, with considerable gaps in their monitoring, tendering, and contracting. This study illustrates the differences between procurement standards and project specific practices that aim to reduce GHGe from road construction projects in three of the largest Australian road construction clients, with a focus on the tools used, contract type and incentives for better performance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Given global demand for new infrastructure, governments face substantial challenges in funding new infrastructure and delivering Value for Money (VfM). As part of the background to this challenge, a critique is given of current practice in the selection of the approach to procure major public sector infrastructure in Australia and which is akin to the Multi-Attribute Utility Approach (MAUA). To contribute towards addressing the key weaknesses of MAUA, a new first-order procurement decision-making model is presented. The model addresses the make-or-buy decision (risk allocation); the bundling decision (property rights incentives), as well as the exchange relationship decision (relational to arms-length exchange) in its novel approach to articulating a procurement strategy designed to yield superior VfM across the whole life of the asset. The aim of this paper is report on the development of this decisionmaking model in terms of the procedural tasks to be followed and the method being used to test the model. The planned approach to testing the model uses a sample of 87 Australian major infrastructure projects in the sum of AUD32 billion and deploys a key proxy for VfM comprising expressions of interest, as an indicator of competition.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

People's decision to join an organ donor registry and have a discussion with family about their organ donation preference increases the likelihood that their family will consent to donation of their organs. This study explores the effectiveness of three interventions compared to a control condition to increase individual consent (registering and discussing donation wishes) for organ donation. Australian residents who had not previously communicated their consent (N = 177) were randomly allocated to complete an online survey representing either an extended theory of planned behaviour motivational intervention (strengthening intention via attitudes, subjective norms, control, moral norms and identity), a volitional intervention using constructs from the health action process approach (strengthening the translation of intentions into action using action plans and coping plans), a combined motivational and volitional intervention, or a control condition. Registering, but not discussing, intentions increased in the motivational compared to non-motivational conditions. For joining the organ donor registry, the combination of strengthening intentions (motivational) as well as forming specific action (when, where, how, and with whom for discussing) and coping (listing potential obstacles and how these may be overcome) plans (volitional) resulted in significantly higher rates of self-reported behaviour. There was no evidence for this effect on discussion.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Managing public sector projects in Malaysia is a unique challenge. This is because of the ethical issues involved during the project procurement process. These ethical issues need attention because they will have an impact on the quality, cost and time of the project itself. The ethical issues here include conflict of interest, bid shopping, collusive tendering, bid cutting, corruption and the payment game. In 2006, 17.3% of 417 Malaysian government contract projects were considered sick due to contractors' performances that failed to conduct the project according to the project plan. Some of the sick projects from these statistics are due to the ethical issues involved. These construction projects have low quality due to the selection of the contractors, done unethically due to personal relationships instead of professional qualifications. That is why it is important to govern the project procurement processes to ensure the accountability and transparency of the decision making process to ensure that these ethical issues can be avoided. Extensive research has been conducted on the ethical issues in the tendering process or the award phase of project management. There is a lack of studies looking at the role of clients, including the government client, in relation to unethical practice in project procurement in the public sector. It is important to understand that ethical issues not only involve the contractors and suppliers but also the clients. Even though there are codes of ethics in the public sectors, ethical issues still arise. Therefore, this research develops a project governance framework (PGEDM) for ethical decision making in the Malaysian public sectors. This framework combines the ethical decision making process together with the project governance principals in guiding the public sectors with ethical decision making in project procurement. A triangulation of questionnaire survey and Delphi study was employed in this research to collect required qualitative and quantitative data. A questionnaire survey was conducted among the public officials (the practitioners) who are currently working in the procurement area in the Malaysian public sectors, in identifying the ethical behaviours and factors influencing further ethical behaviour to occur. A Delphi study was also conducted with the assistance of a panel of experts consisting of practitioners that have expertise in the area of project governance and project procurement as well as academician, which further considered the relationship and the influence of the criteria and indicators of ethical decision making (EDM) and project governance (project criteria, organisational culture, contract award criteria, individual criteria, client's requirements, government procedures and professional ethics). Through the identification and integration of the factors and EDM criteria as well as the project governance criteria and EDM steps for ethical issues, a PGEDM framework was developed to promote, and drive consistent decision outcome in project procurement in the public sector. The framework contributes significantly to ethical decision making in the project procurement process. These findings not only give benefit to the people involved in project procurement but also to the public officials in guiding them to be more accountable in handling ethical issues in the future and to have a more transparent decision making process.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Organ motion as a result of respiration is an important field of research for medical physics. Knowledge of magnitude and direction of this motion is necessary to allow for more accurate radiotherapy treatment planning. This will result in higher doses to the tumour whilst sparing healthy tissue. This project involved human trials, where the radiation therapy patient's kidneys were CT scanned under three different conditions; whilst free breathing (FB), breath-hold at normal tidal inspiration (BHIN), and breath-hold at normal tidal expiration (BHEX). The magnitude of motion was measured by recording the outline of the kidney from a Beam's Eye View (BEV). The centre of mass of this 2D shape was calculated for each set using "ImageJ" software and the magnitude of movement determined from the change in the centroid's coordinates between the BHIN and BHEX scans. The movement ranged from, for the left and right kidneys, 4-46mm and 2-44mm in the superior/inferior (axial) plane, 1-21mm and 2- 16mm in the anterior/posterior (coronal) plane, and 0-6mm and 0-8mm in the lateral/medial (sagittal) plane. From exhale to inhale, the kidneys tended to move inferiorly, anteriorly and laterally. A standard radiotherapy plan, designed to treat the para-aortics with opposed lateral fields was performed on the free breathing (planning) CT set. The field size and arrangement was set up using the same parameters for each subject. The prescription was to deliver 45 Gray in 25 fractions. This field arrangement and prescription was then copied over to the breath hold CT sets, and the dosimetric differences were compared using Dose Volume Histograms (DVH). The point of comparison for the three sets was recorded as the percentage volume of kidney receiving less than or equal to 10 Gray. The QUASAR respiratory motion phantom was used with the range of motion determined from the human study. The phantom was imaged, planned and treated with a linear accelerator with dose determined by film. The effect of the motion was measured by the change in the penumbra of the film and compared to the penumbra from the treatment planning system.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Understanding people's organ donation decisions may narrow the gap between organ supply and demand. In two studies, participants who had not recorded their posthumous organ donation decision (Study 1, N = 210; Study 2, N = 307) completed items assessing prototype/willingness model (PWM; attitude, subjective norm, donor prototype favorability and similarity, willingness) constructs. Attitude, subjective norm, and prototype similarity predicted willingness to donate. Prototype favorability and a Prototype Favorability × Similarity interaction predicted willingness (Study 2). These findings provide support for the PWM in altruistic health contexts, highlighting the importance of people's perceptions about organ donors in their donation decisions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose Most barriers and enablers of sustainable projects are related to procurement. This study proposes a framework for evaluating green procurement practices throughout the lifecycle of road construction projects and demonstrates its application through an Australian case study. Design/methodology/approach The study is based on linking the phases of road construction with incentive mechanisms for proactively motivating behavioural change. A holistic view on utilised and potential incentives is attempted with a literature review and a state-of-practice review. The latter is based on interviews and 90 policy and procurement documents across five Australian states. Findings An evaluation framework with seven procurement stages is suggested to describe current state green procurement incentives throughout the delivery lifecycle of road construction projects. The Australian case study was found to provide useful data to identify gaps and strong points of the different states regarding their level of integration of sustainability and greenhouse gas emissions GHG) reduction elements in their procurement practices. This understanding was used to draw recommendations on future advancement of green procurement. Originality/value: Government entities across the globe can impact considerably the achievement of sustainability and GHG targets, by using their procurement practices and requirements to create incentives for contractors and suppliers to engage in more GHG conscious practices. The present study provides a systematic account of how green procurement practices can be underpinned using the Australian road construction industry as a case study, and distinguish between strong and weak links in the green procurement chain to draw recommendations for future initiatives.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Collaborative contracting has emerged over the past 15 years as an innovative project delivery framework that is particularly suited to infrastructure projects. Australia leads the world in the development of project and program alliance approaches to collaborative delivery. These approaches are considered to promise superior project results. However, very little is known about the learning routines that are most widely used in support of collaborative projects in general and alliance projects in particular. The literature on absorptive capacity and dynamic capabilities indicates that such learning enhances project performance. The learning routines employed at corporate level during the operation of collaborative infrastructure projects in Australia were examined through a large survey conducted in 2013. This paper presents a descriptive summary of the preliminary findings. The survey captured the experiences of 320 practitioners of collaborative construction projects, including public and private sector clients, contractors, consultants and suppliers (three per cent of projects were located in New Zealand, but for brevity’s sake the sample is referred to as Australian). The majority of projects identified used alliances (78.6%); whilst 9% used Early Contractor Involvement (ECI) contracts and 2.7% used Early Tender Involvement contracts, which are ‘slimmer’ types of collaborative contract. The remaining 9.7% of respondents used traditional contracts that employed some collaborative elements. The majority of projects were delivered for public sector clients (86.3%), and/or clients experienced with asset procurement (89.6%). All of the projects delivered infrastructure assets; one third in the road sector, one third in the water sector, one fifth in the rail sector, and the rest spread across energy, building and mining. Learning routines were explored within three interconnected phases: knowledge exploration, transformation and exploitation. The results show that explorative and exploitative learning routines were applied to a similar extent. Transformative routines were applied to a relatively low extent. It was also found that the most highly applied routine is ‘regularly applying new knowledge to collaborative projects’; and the least popular routine was ‘staff incentives to encourage information sharing about collaborative projects’. Future research planned by the authors will examine the impact of these routines on project performance.