998 resultados para Optimal contract
Resumo:
In open railway access markets, a train service provider (TSP) negotiates with an infrastructure provider (IP) for track access rights. This negotiation has been modeled by a multi-agent system (MAS) in which the IP and TSP are represented by separate software agents. One task of the IP agent is to generate feasible (and preferably optimal) track access rights, subject to the constraints submitted by the TSP agent. This paper formulates an IP-TSP transaction and proposes a branch-and-bound algorithm for the IP agent to identify the optimal track access rights. Empirical simulation results show that the model is able to emulate rational agent behaviors. The simulation results also show good consistency between timetables attained from the proposed methods and those derived by the scheduling principles adopted in practice.
Resumo:
Conflict occurs when two or more trains approach the same junction within a specified time. Such conflicts result in delays. Current practices to assign the right of way at junctions achieve orderly and safe passage of the trains, but do not attempt to reduce the delays. A traffic controller developed in the paper assigns right of way to impose minimum total weighted delay on the trains. The traffic flow model and the optimisation technique used in this controller are described. Simulation studies of the performance of the controller are given.
Resumo:
The learning experiences of student nurses undertaking clinical placement are reported widely, however little is known about the learning experiences of health professionals undertaking continuing professional development (CPD) in a clinical setting, especially in palliative care. The aim of this study, which was conducted as part of the national evaluation of a professional development program involving clinical attachments with palliative care services (The Program of Experience in the Palliative Approach [PEPA]), was to explore factors influencing the learning experiences of participants over time. Thirteen semi-structured, one-to-one telephone interviews were conducted with five participants throughout their PEPA experience. The analysis was informed by the traditions of adult, social and psychological learning theories and relevant literature. The participants' learning was enhanced by engaging interactively with host site staff and patients, and by the validation of their personal and professional life experiences together with the reciprocation of their knowledge with host site staff. Self-directed learning strategies maximised the participants' learning outcomes. Inclusion in team activities aided the participants to feel accepted within the host site. Personal interactions with host site staff and patients shaped this social/cultural environment of the host site. Optimal learning was promoted when participants were actively engaged, felt accepted and supported by, and experienced positive interpersonal interactions with, the host site staff.
Resumo:
The selection of projects and programs of work is a key function of both public and private sector organisations. Ideally, projects and programs that are selected to be undertaken are consistent with strategic objectives for the organisation; will provide value for money and return on investment; will be adequately resourced and prioritised; will not compete with general operations for resources and not restrict the ability of operations to provide income to the organisation; will match the capacity and capability of the organisation to deliver; and will produce outputs that are willingly accepted by end users and customers. Unfortunately,this is not always the case. Possible inhibitors to optimal project portfolio selection include: processes that are inconsistent with the needs of the organisation; reluctance to use an approach that may not produce predetermined preferences; loss of control and perceived decision making power; reliance on quantitative methods rather than qualitative methods for justification; ineffective project and program sponsorship; unclear project governance, processes and linkage to business strategies; ignorance, taboos and perceived effectiveness; inadequate education and training about the processes and their importance.
Resumo:
With an increasing body of literature linking the human resource management and marketing fields, one area receiving increased academic attention is how an organisation’s corporate reputation can be managed to attract potential recruits and shape their employment expectations through their psychological contracts. This paper seeks to enhance current models which focus on the interrelationship of corporate reputation and psychological contract theory. It is argued that a number of factors need to be considered in order the build a firmer foundation for such a theory. Firstly, a common understanding of the psychological contract needs to be established such that the focus on either expectations or promises is clarified. Secondly, the included components of the psychological contract need to be considered in light of their empirical founding and their relationship with one another. Thirdly, the interrelationship of corporate reputation, employer branding, identity and image needs to be explicated within the context of how they both influence and interrelate with the psychological contract. The final consideration surrounds the opportunity for potential employees to be considered within the corporate reputation literature as a significant stakeholder group.
Resumo:
The psychological contract has emerged over the past 60 years as a key analytical device for both academics and practitioners to conceptualise and explain the employment relationship. However, despite the recognised import of this field, some authors suggest it has fallen into a ‘methodological rut’ and is neglecting to empirically assess basic theoretical tenets of the concept – such as the temporal and individualised, subjective nature of the construct. This paper describes the research design of a longitudinal, mixed methods study to explore development and change in the psychological contract and outline how the use of individual growth modelling can be a powerful tool in analysing the type of quantitative data collected. Finally, by briefly outlining the benefits of this approach, the paper seeks to offer an alternative methodology to explore the dynamic and intra-individual processes within the psychological contract domain.
Resumo:
The psychological contract is a frequently deployed construct to examine the dynamics of the employee-employer exchange relationship. While there is consensus that the contract comprises employee and employer beliefs regarding this relationship, the various belief types are not conceptually well-defined and understood. Over time, the contract has been conceptualised as comprising expectations, obligations, promises or some combination therein. While most contemporary researchers focus solely upon promises, the justifications for this position are unpersuasive. This paper theoretically describes the various belief types, identifies their interrelationships and proposes a reconceptualisation of the beliefs constituting the contract. Specifically, it is demonstrated that the extant promise-based belief framework provides too restrictive a theoretical base for a comprehensive understanding of individuals’ psychological contracts.
Resumo:
In this paper, we are concerned with the practical implementation of time optimal numerical techniques on underwater vehicles. We briefly introduce the model of underwater vehicle we consider and present the parameters for the test bed ODIN (Omni-Directional Intelligent Navigator). Then we explain the numerical method used to obtain time optimal trajectories with a structure suitable for the implementation. We follow this with a discussion on the modifications to be made considering the characteristics of ODIN. Finally, we illustrate our computations with some experimental results.
Resumo:
This paper examines the ground-water flow problem associated with the injection and recovery of certain corrosive fluids into mineral bearing rock. The aim is to dissolve the minerals in situ, and then recover them in solution. In general, it is not possible to recover all the injected fluid, which is of concern economically and environmentally. However, a new strategy is proposed here, that allows all the leaching fluid to be recovered. A mathematical model of the situation is solved approximately using an asymptotic solution, and exactly using a boundary integral approach. Solutions are shown for two-dimensional flow, which is of some practical interest as it is achievable in old mine tunnels, for example.
Resumo:
Optimal scheduling of voltage regulators (VRs), fixed and switched capacitors and voltage on customer side of transformer (VCT) along with the optimal allocaton of VRs and capacitors are performed using a hybrid optimisation method based on discrete particle swarm optimisation and genetic algorithm. Direct optimisation of the tap position is not appropriate since in general the high voltage (HV) side voltage is not known. Therefore, the tap setting can be determined give the optimal VCT once the HV side voltage is known. The objective function is composed of the distribution line loss cost, the peak power loss cost and capacitors' and VRs' capital, operation and maintenance costs. The constraints are limits on bus voltage and feeder current along with VR taps. The bus voltage should be maintained within the standard level and the feeder current should not exceed the feeder-rated current. The taps are to adjust the output voltage of VRs between 90 and 110% of their input voltages. For validation of the proposed method, the 18-bus IEEE system is used. The results are compared with prior publications to illustrate the benefit of the employed technique. The results also show that the lowest cost planning for voltage profile will be achieved if a combination of capacitors, VRs and VCTs is considered.
Resumo:
Legal advisers are often called upon to advise whether informal correspondence between clients may give rise to a binding contract. The decision of Mullins J in Teviot Downs Estate Pty Ltd v MTAA Superannuation Fund (Flagstone Creek and Spring Mountain Park) Property Pty Ltd [2003] QSC 403 provides general guidance as to matters that may be relevant when faced with this thorny issue.