989 resultados para National banks
Resumo:
Includes text of the Aldrich plan.
Resumo:
verso: attached to letter, W. B. Mershon to C. S. Osborn Dec. 24, 1909
Resumo:
Reprint, with new indexes, of the 1965 ed.
Resumo:
In November 2006, the flood of record on the upper Nisqually River destroyed part of Sunshine Point Campground in Mount Rainier National Park, Washington. The Nisqually River migrated north and reoccupied five acres of its floodplain; Tahoma Creek partially avulsed into the west floodplain, topping banks of an undersized channel and flooding the campground. I assessed hazards to infrastructure at the old campground location, where the Park proposes to rebuild the remaining campground roads and sites. This assessment focuses on two major hazards: northward Nisqually River migration, which may reincorporate the floodplain into the river destroying infrastructure; and Tahoma Creek avulsions, which may flood the campgroud and deposit sediment burying campground infrastructure. I quantify northward migration by: estimating migration rates and changes to channel width; evaluating river occupation of the pre- and post-2006 campground; and estimating scour depths at revetments protecting the campground. I digitized the Nisqually River channels and channel centerlines from maps and images between 1955 and 2013 into a GIS, which I used to estimate migration rate and river width changes. Centerline migration rates average 9 ft/yr along the length of the Nisqually River study reach; at Sunshine Point lateral migration rates average 11 ft/yr. Maximum migration along the study reach was 19 ft/yr between 2006 and 2009. Greater than average migration rates and channel widths correspond to river confluences and include the Tahoma Creek confluence at Sunshine Point. To determine historical channel locations and the frequency that the river occupied different parts of its floodplain, I digitized the river from maps and images between 1903 and 2013. The Nisqually River flows through Sunshine Point Campground in eight out of 15 historical images. I assess scour at revetments protecting infrastructure from the Nisqually River during a 100-year recurrence interval flood using measured cross-sections. During a 100-year flood, the Nisqually River may scour up to 10 feet below the bed elevation. These scour depths can destabilize critical revetments leaving loose unconsolidated riverbanks exposed to Nisqually River flows. To determine the causes, locations, and frequency of flood hazards from Tahoma Creek avulsions, I field map avulsion channels and compare the results with imagery and channel width changes between 1955 and 2013. Mapped avulsion channels occur with swaths of dead vegetation or nascent vegetation; both dead and recent vegetation are visibly distinct from surrounding vegetation in aerial images. Times of changes to these vegetation anomalies correspond to increases in Tahoma Creek channel width. Avulsions have occurred at least three times in the study period: pre-1955, between 1979 and 1984, and in 2006. The 1984 and 2006 avulsions both occur after increases in Tahoma Creek reach averaged width. The NPS is considering two options to rebuild Sunshine Point Campground, both at the same location. The hazards posed by the Nisqually River and Tahoma Creek at Sunshine Point will affect both construction options equally. Migration hazards to the campground may be reduced by limiting the proposed campground infrastructure to an elevated ridge that has not been occupied by the Nisqually River since 1903. The hazards of damage from migration may be reduced by revetments, which were effective in preventing northward Nisqually River migration in 1959 and 1965. Tahoma Creek avulsions are related increased of Tahoma Creek reach averaged widths, which are near a 58- year maximum, and occurred during a 10-year flood in 1984. The campground may be as susceptible to flooding from avulsions during as little as a 10-year flood. A large avulsion may occur with the next significant Tahoma Creek width increase. Glacial retreat has been shown to increase debris flow activity and increase sediment delivery to Mount Rainier rivers. Increased sediment discharge has been correlated with aggradation, which will further encourage Tahoma Creek avulsions.
Resumo:
Over the past decade or so a number of changes have been observed in traditional Japanese employment relations (ERs) systems such as an increase in non-regular workers, a move towards performance-based systems and a continuous decline in union membership. There is a large body of Anglo-Saxon and Japanese literature providing evidence that national factors such as national institutions, national culture, and the business and economic environment have significantly influenced what were hitherto three ‘sacred’ aspects of Japanese ERs systems (ERSs). However, no research has been undertaken until now at the firm level regarding the extent to which changes in national factors influence ERSs across firms. This article develops a model to examine the impact of national factors on ER systems; and analyses the impact of national factors at the firm level ER systems. Based on information collected from two different groups of companies, namely Mitsubishi Chemical Group (MCG) and Federation of Shinkin Bank (FSB) the research finds that except for a few similarities, the impact of national factors is different on Japanese ER systems at the firm level. This indicates that the impact of national factors varies in the implementation of employment relations factors. In the case of MCG, national culture has less to do with seniority-based system. Study also reveals that the national culture factors have also less influence on an enterprise-based system in the case of FSB. This analysis is useful for domestic and international organizations as it helps to better understand the role of national factors in determining Japanese ERSs.
Resumo:
The increasing adoption of international accounting standards and global convergence of accounting regulations is frequently heralded as serving to reduce diversity in financial reporting practice. In a process said to be driven in large part by the interests of international business and global financial markets, one might expect the greatest degree of convergence to be found amongst the world’s largest multinational financial corporations. This paper challenges such claims and presumptions. Its content analysis of longitudinal data for the period 2000-2006 reveals substantial, on going diversity in the market risk disclosure practices, both numerical and narrative, of the world’s top-25 banks. The significance of such findings is reinforced by the sheer scale of the banking sector’s risk exposures that have been subsequently revealed in the current global financial crisis. The variations in disclosure practices documented in the paper apply both across and within national boundaries, leading to a firm conclusion that, at least in terms of market risk reporting, progress towards international harmonisation remains rather more apparent than real.
Resumo:
Report published in the Proceedings of the National Conference on "Education in the Information Society", Plovdiv, May, 2013
Resumo:
General note: Title and date provided by Bettye Lane.
Resumo:
During U.S. Department of Interior, Bureau of Land Management (BLM) public hearings held in 1973, 1974 and 1975 prior to Texas Outer Continental Shelf (OCS) oil and gas lease sales, concern was expressed by the National Marine Fisheries Service, scientists from Texas A&M and the University of Texas and private citizens over the possible environmental impact of oil and gas drilling and production operations on coral reefs and fishing banks in or adjacent to lease blocks to be sold. As a result, certain restrictive regulations concerning drilling operations in the vicinity of the well documented coral reefs and biostromal communities at the East and West Flower Gardens were established by BLM, and Signal Oil Company was required to provide a biological and geological baseline study of the less well known Stetson Bank before a drilling permit could be issued. Considering the almost total lack of knowledge of the geology and biotic communities associated with the South Texas OCS banks lying in or near lease blocks to be offered for sale in 1975, BLM contracted with Texas A&M University to provide the biological and geological baseline information required to facilitate judgments as to the extent and nature of restrictive regulations on drilling near these banks which might be required to insure their protection. In pursuit of this, scientists from Texas A&M University were to direct their attention toward assessments of ground fish populations, unique biological and geological features, substratum type and distribution, and the biotic and geologic relationships between these banks and those farther north.
Resumo:
Over the last thirty years, there has been an increased demand for better management of public sector organisations (PSOs). This requires that they are answerable for the inputs that they are given but also for what they achieve with these inputs (Hood 1991; Hood 1995). It is suggested that this will improve the management of the organisation through better planning and control, and the achievement of greater accountability (Smith 1995). However, such a rational approach with clear goals and the means to measure achievement can cause difficulties for many PSOs. These difficulties include the distinctive nature of the public sector due to the political environment within which the public sector manager operates (Stewart and Walsh 1992) and the fact that PSOs will have many stakeholders, each of whom will have their own specific objectives based on their own perspective (Boyle 1995). This can
result in goal ambiguity which means that there is leeway in interpreting the results of the PSO. The National Asset Management Agency (NAMA) was set up to bring stability to the financial system by buying loans from the banks (which were in most cases, non-performing loans). The intention was to cleanse the banks of these loans so that they could return to their normal business of taking deposits and making loans. However, the legislation, also gave NAMA a wide range of other responsibilities including responsibility for facilitating credit in the economy and protecting the interests of taxpayers. In more recent times, NAMA has been given responsibility for building social housing. This wide-range of activities is a clear example of a PSO being given multiple goals which may conflict and is therefore likely to lead to goal ambiguity. This makes it very difficult to evaluate NAMA’s performance as they are attempting to meet numerous goals at the same time and also highlights the complexity of policy making in the public sector. The purpose of this paper is to examine how NAMA dealt with goal ambiguity. This will be done through a thematic analysis of its annual reports over the last five years. The paper’s will contribute to the ongoing debate about the evaluation of PSOs and the complex environment within which they operate which makes evaluation difficult as they are
answerable to multiple stakeholders who have different objectives and different criteria for measuring success.
Resumo:
From the Founding of the Bank of France to the Present Time