994 resultados para Military equipment


Relevância:

20.00% 20.00%

Publicador:

Resumo:

"The 1990s saw the United Nations, the militaries of key member states, and NGOs increasingly entangled in the complex affairs of disrupted states. Whether as deliverers of humanitarian assistance or as agents of political, social, and civic reconstruction, whether in Somalia, Bosnia, Kosovo, or East Timor, these actors have had to learn ways of interacting with each other in order to optimize the benefits for the populations they seek to assist. Yet the challenges have proved daunting. Civil and military actors have different organizational cultures and standard operating procedures and are confronted with the need to work together to perform tasks to which different actors may attach quite different priorities."--BOOK JACKET.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The modern society has come to expect the electrical energy on demand, while many of the facilities in power systems are aging beyond repair and maintenance. The risk of failure is increasing with the aging equipments and can pose serious consequences for continuity of electricity supply. As the equipments used in high voltage power networks are very expensive, economically it may not be feasible to purchase and store spares in a warehouse for extended periods of time. On the other hand, there is normally a significant time before receiving equipment once it is ordered. This situation has created a considerable interest in the evaluation and application of probability methods for aging plant and provisions of spares in bulk supply networks, and can be of particular importance for substations. Quantitative adequacy assessment of substation and sub-transmission power systems is generally done using a contingency enumeration approach which includes the evaluation of contingencies, classification of the contingencies based on selected failure criteria. The problem is very complex because of the need to include detailed modelling and operation of substation and sub-transmission equipment using network flow evaluation and to consider multiple levels of component failures. In this thesis a new model associated with aging equipment is developed to combine the standard tools of random failures, as well as specific model for aging failures. This technique is applied in this thesis to include and examine the impact of aging equipments on system reliability of bulk supply loads and consumers in distribution network for defined range of planning years. The power system risk indices depend on many factors such as the actual physical network configuration and operation, aging conditions of the equipment, and the relevant constraints. The impact and importance of equipment reliability on power system risk indices in a network with aging facilities contains valuable information for utilities to better understand network performance and the weak links in the system. In this thesis, algorithms are developed to measure the contribution of individual equipment to the power system risk indices, as part of the novel risk analysis tool. A new cost worth approach was developed in this thesis that can make an early decision in planning for replacement activities concerning non-repairable aging components, in order to maintain a system reliability performance which economically is acceptable. The concepts, techniques and procedures developed in this thesis are illustrated numerically using published test systems. It is believed that the methods and approaches presented, substantially improve the accuracy of risk predictions by explicit consideration of the effect of equipment entering a period of increased risk of a non-repairable failure.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents a preliminary crash avoidance framework for heavy equipment control systems. Safe equipment operation is a major concern on construction sites since fatal on-site injuries are an industry-wide problem. The proposed framework has potential for effecting active safety for equipment operation. The framework contains algorithms for spatial modeling, object tracking, and path planning. Beyond generating spatial models in fractions of seconds, these algorithms can successfully track objects in an environment and produce a collision-free 3D motion trajectory for equipment.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the long term, with development of skill, knowledge, exposure and confidence within the engineering profession, rigorous analysis techniques have the potential to become a reliable and far more comprehensive method for design and verification of the structural adequacy of OPS, write Nimal J Perera, David P Thambiratnam and Brian Clark. This paper explores the potential to enhance operator safety of self-propelled mechanical plant subjected to roll over and impact of falling objects using the non-linear and dynamic response simulation capabilities of analytical processes to supplement quasi-static testing methods prescribed in International and Australian Codes of Practice for bolt on Operator Protection Systems (OPS) that are post fitted. The paper is based on research work carried out by the authors at the Queensland University of Technology (QUT) over a period of three years by instrumentation of prototype tests, scale model tests in the laboratory and rigorous analysis using validated Finite Element (FE) Models. The FE codes used were ABAQUS for implicit analysis and LSDYNA for explicit analysis. The rigorous analysis and dynamic simulation technique described in the paper can be used to investigate the structural response due to accident scenarios such as multiple roll over, impact of multiple objects and combinations of such events and thereby enhance the safety and performance of Roll Over and Falling Object Protection Systems (ROPS and FOPS). The analytical techniques are based on sound engineering principles and well established practice for investigation of dynamic impact on all self propelled vehicles. They are used for many other similar applications where experimental techniques are not feasible.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this paper is to study the profiling of property, plant and equipment (PPE) contributions in Australia and Malaysia construction companies. A company’s worth is usually based on the listed share price on the stock exchange. In arriving at the net profit, the contribution of PPE in the company’s assets is somehow being neglected. This paper will investigate the followings; firstly the level of PPE contribution in the construction firms by comparing the PPE contributions to the company’s asset as a whole which includes fixed (non-current) assets and current assets. This will determine the true strength of the companies, rather than relying on the share prices alone. Secondly, the paper will determine the trend of company’s asset ownership to show the company’s performance of the PPE ownership during the period of study. The data is based on the selected construction companies listed on the Australian Stock Exchange (ASX) and Malaysian Stock Exchange, known as Bursa Malaysia. The profiling will help to determine the strength of the construction firms based on the PPE holding, and the level of PPE ownerships in the two countries construction firms during the period of study.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Melodic alarms proposed in the IEC 60601-1-8 standard for medical electrical equipment were tested for learnability and discriminability. Thirty-three non-anaesthetist participants learned the alarms over two sessions of practice, with or without mnemonics suggested in the standard. Fewer than 30% of participants could identify the alarms with 100% accuracy at the end of practice. Confusions persisted between pairs of alarms, especially if mnemonics were used during learning (p = 0.011). Participants responded faster (p < 0.00001) and more accurately (p = 0.002) to medium priority alarms than to high priority alarms, even though they rated the high priority alarms as sounding more urgent (p < 0.00001). Participants with at least 1 year of formal musical training identified the alarms more accurately (p = 0.0002) than musically untrained participants, and found the task easier overall (p < 0.00001). More intensive studies of the IEC 60601-1-8 alarms are needed for their effectiveness to be determined.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to examine the quality of service of a South East Asian country's military facilities management organisation. Design/methodology/approach – An interview survey and questionnaire survey were used to obtain a description and summary of stakeholders’ expectations and the extent to which they were being satisfied by the services provided. Findings – The method provides a useful means of identifying and prioritising varying expectations between stakeholder groups and of indicating any mismatch in expectations in the management of military facilities. Social implications – The development and use of a method to test and improve the effectiveness and efficiency of the management of military facilities helps in providing better value for money. Originality/value – In addition to re-affirming Parasuraman's overall dimensions of service expectation, the empirical summary of the stakeholders’ expectations obtained in this way is of practical value for the service provider in developing a strategy for expectation management. For the case studied, it is also apparent that although the current processes in service delivery are well understood by all involved stakeholders, there is a need for further improvement with regards to their expectation levels. It is also one of the very few reported studies on the management of military facilities.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Downtime (DT) caused by non-availability of equipment and equipment breakdown has non-trivial impact on the performance of construction projects. Earlier research has often addressed this fact, but it has rarely explained the causes and consequences of DT – especially in the context of developing countries. This paper presents a DT model to address this issue. Using this model, the generic factors and processes related to DT are identified, and the impact of DT is quantified. By applying the model framework to nine road projects in Nepal, the impact of DT is explored in terms of its duration and cost. The research findings highlight how various factors and processes interact with each other to create DT, and mitigate or exacerbate its impact on project performance. It is suggested that construction companies need to adopt proactive equipment management and maintenance programs to minimize the impact of DT.