929 resultados para Lost Creek


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the Disaster Grants – Public Assistance program of the Iowa River - Flint Creek Levee District in Des Moines County and Louisa County, Iowa for the year ended June 30, 2009

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the Honey Creek Resort Operations Account maintained by Central Group Management, LLC for the year ended June 30, 2010

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the Honey Creek Resort Operations Account maintained by Central Group Management, LLC for the year ended June 30, 2011

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on a special investigation of the Department of Natural Resources’ Honey Creek Resort for the period October 1, 2010 through October 20, 2011

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Data sheet produced by the Iowa Department of Natural Resources is about different times of animals, insects, snakes, birds, fish, butterflies, etc. that can be found in Iowa.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the Operations Account of Honey Creek Resort, Moravia, Iowa as of and for the year ended June 30, 2012

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the Honey Creek Resort Operations Account maintained by Central Group Management, LLC for the year ended June 30, 2012

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report deals with the probable impact of urban development on the magnitude and frequency of flooding in the lower reach of the Walnut Creek Basin.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The US Highway 6 Bridge over Keg Creek outside of Council Bluffs, Iowa is a demonstration bridge site chosen to put into practice newly-developed Accelerated Bridge Construction (ABC) concepts. One of these new concepts is the use of prefabricated high performance concrete (HPC) bridge elements that are connected, in place, utilizing advanced material closure-pours and quick-to-install connection details. The Keg Creek Bridge is the first bridge in the US to utilize moment-resisting ultra-high performance concrete (UHPC) joints in negative moment regions over piers. Through laboratory and live load field testing, performance of these transverse joints as well as global bridge behavior is quantified and examined. The effectiveness of the structural performance of the bridge is evaluated to provide guidance for future designs of similar bridges throughout the US.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the Honey Creek Resort Operations Account maintained by Central Group Management, LLC for the year ended June 30, 2013

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Paradise Lost can be read on various levels, some of which challenge or even contradict others. The main, explicit narrative from Genesis chapters 2 and 3 is shadowed by many other related stories. Some of these buried tales question or subvert the values made explicit in the dominant narrative. An attentive reader needs to be alert to the ways in which such references introduce teasing complexities. The approach of Satan to Eve in the ninth book of Paradise Lost is loaded in just that way with allusion to the literature of Greece and Rome. The poem recovers for this long and intricately constructed passage the weight of classical reference, especially in similes, that it had during the first Satanic books. Gardens, both classical and biblical, disguised or transformed serpents, and the weight of allusions that Eve is required to bear, all threaten to undermine the meanings of the overt narrative. The narrator has difficulty rescuing Eve from the allusions she attracts, or the many stories told about her.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A water-surface-elevation profile and peak discharges for the flood of May 19, 1990, along Perry Creek in Plymouth and Woodbury Counties, Iowa, are presented in this report. The peak discharge for the May 19, 1990, flood on Perry Creek at 38th Street, Sioux City (06600000) is the second largest flood-peak discharge recorded at the streamflow-gaging station for the period 1939-95. The peak discharge for May 19, 1990, of 8,670 cubic feet per second, is approximately equal to the 35-year recurrence-interval discharge. The report provides information on flood stages and discharges and floodflow frequencies for streamflow- gaging stations in the Perry Creek Basin using flood information collected during 1939-95. Information on temporary bench marks and reference points established in the Perry Creek Basin during 1990-93 is also included in the report. A flood history describes rainfall conditions for the three largest floods that occurred during 1939-95 (July 1944, September 1949, and May 1990).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Duck Creek Watershed, the recipient of a 2009 DNR Watershed Management Planning Grant and a focus of an upcoming City of Davenport master plan, is characterized by relatively flat grades and highly impervious areas. Plagued by issues such as high bacteria loads, stream bank erosion and flooding, solving these problems may take generations. The City of Davenport has taken a microwatershed approach to identify the significant contributors to water quality and flooding issues that affect Duck Creek, its tributaries and the surrounding landscape to make inroads into the larger issues. This project is the next phase of a multi-phased project that addresses the microwatershed that includes St Ambrose University. Work here will improve water quality within Duck Creek and address major flooding issues on campus while also reducing downstream flooding. This project will convert an existing parking lot into a green parking area by removing the hard surface and installing below ground facilities for storm water infiltration, detention, and reuse. Permeable pavement, bio­ swales and infiltration areas will be constructed on top of the infiltration facilities. We estimate that this project will capture and treat 1,110,000 gallons (3.5 acre feet) of storm water runoff which accounts to the runoff volume from a 10-year storm event while reducing pollutants by 30-100%.