981 resultados para Large projects


Relevância:

30.00% 30.00%

Publicador:

Resumo:

There is an increasing awareness among all kinds of organisations (in business,government and civil society) about the benefits of jointly working with stakeholders to satisfy both their goals and the social demands placed upon them. This is particularly the case within corporate social responsibility (CSR) frameworks. In this regard, multi-criteria tools for decision-making like the analytic hierarchy process (AHP) described in the paper can be useful for the building relationships with stakeholders. Since these tools can reveal decision-maker’s preferences, the integration of opinions from various stakeholders in the decision-making process may result in better and more innovative solutions with significant shared value. This paper is based on ongoing research to assess the feasibility of an AHP-based model to support CSR decisions in large infrastructure projects carried out by Red Electrica de España, the sole transmission agent and operator of the Spanishelectricity system.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Smart Grids are advanced power networks that introduce intelligent management, control, and operation systems to address the new challenges generated by the growing energy demand and the appearance of renewal energies. In the literature, Smart Grids are presented as an exemplar SoS: systems composed of large heterogeneous and independent systems that leverage emergent behavior from their interaction. Smart Grids are currently scaling up the electricity service to millions of customers. These Smart Grids are known as Large-Scale Smart Grids. From the experience in several projects about Large-Scale Smart Grids, this paper defines Large-Scale Smart Grids as a SoS that integrate a set of SoS and conceptualizes the properties of this SoS. In addition, the paper defines the architectural framework for deploying the software architectures of Large-Scale Smart Grid SoS.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

La comparación de las diferentes ofertas presentadas en la licitación de un proyecto,con el sistema de contratación tradicional de medición abierta y precio unitario cerrado, requiere herramientas de análisis que sean capaces de discriminar propuestas que teniendo un importe global parecido pueden presentar un impacto económico muy diferente durante la ejecución. Una de las situaciones que no se detecta fácilmente con los métodos tradicionales es el comportamiento del coste real frente a las variaciones de las cantidades realmente ejecutadas en obra respecto de las estimadas en el proyecto. Este texto propone abordar esta situación mediante un sistema de análisis cuantitativo del riesgo como el método de Montecarlo. Este procedimiento, como es sabido, consiste en permitir que los datos de entrada que definen el problema varíen unas funciones de probabilidad definidas, generar un gran número de casos de prueba y tratar los resultados estadísticamente para obtener los valores finales más probables,con los parámetros necesarios para medir la fiabilidad de la estimación. Se presenta un modelo para la comparación de ofertas, desarrollado de manera que puede aplicarse en casos reales aplicando a los datos conocidos unas condiciones de variación que sean fáciles de establecer por los profesionales que realizan estas tareas. ABSTRACT: The comparison of the different bids in the tender for a project, with the traditional contract system based on unit rates open to and re-measurement, requires analysis tools that are able to discriminate proposals having a similar overall economic impact, but that might show a very different behaviour during the execution of the works. One situation not easily detected by traditional methods is the reaction of the actual cost to the changes in the exact quantity of works finally executed respect of the work estimated in the project. This paper intends to address this situation through the Monte Carlo method, a system of quantitative risk analysis. This procedure, as is known, is allows the input data defining the problem to vary some within well defined probability functions, generating a large number of test cases, the results being statistically treated to obtain the most probable final values, with the rest of the parameters needed to measure the reliability of the estimate. We present a model for the comparison of bids, designed in a way that it can be applied in real cases, based on data and assumptions that are easy to understand and set up by professionals who wish to perform these tasks.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This study analyzes the effect of organizational characteristics on the innovation project performance. This research applies fuzzy set Qualitative Comparative Analysis (fsQCA) to a large sample of Spanish firms appearing in the Community Innovation survey (CIS). The results show that the combination of organizational innovation, firm size and cooperationwith national and, especially, international firms is a sufficient condition for the success of innovation projects within the organization. Evidence also suggests that variables such as the investment on R&D peremployee or the seniority of the company do not affect the success of innovation projects. These findings help complement some results in previous studies on innovation projects performance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The function of a protein generally is determined by its three-dimensional (3D) structure. Thus, it would be useful to know the 3D structure of the thousands of protein sequences that are emerging from the many genome projects. To this end, fold assignment, comparative protein structure modeling, and model evaluation were automated completely. As an illustration, the method was applied to the proteins in the Saccharomyces cerevisiae (baker’s yeast) genome. It resulted in all-atom 3D models for substantial segments of 1,071 (17%) of the yeast proteins, only 40 of which have had their 3D structure determined experimentally. Of the 1,071 modeled yeast proteins, 236 were related clearly to a protein of known structure for the first time; 41 of these previously have not been characterized at all.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A large library of phage-displayed human single-chain Fv antibodies (scFv), containing 6.7 × 109 members, was generated by improving the steps of library construction. Fourteen different protein antigens were used to affinity select antibodies from this library. A panel of specific antibodies was isolated with each antigen, and each panel contained an average of 8.7 different scFv. Measurements of antibody–antigen interactions revealed several affinities below 1 nM, comparable to affinities observed during the secondary murine immune response. In particular, four different scFv recognizing the ErbB2 protein had affinities ranging from 220 pM to 4 nM. Antibodies derived from the library proved to be useful reagents for immunoassays. For example, antibodies generated to the Chlamydia trachomatis elementary bodies stained Chlamydia-infected cells, but not uninfected cells. These results demonstrate that phage antibody libraries are ideally suited for the rapid production of panels of high-affinity mAbs to a wide variety of protein antigens. Such libraries should prove especially useful for generating reagents to study the function of gene products identified by genome projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Previously conducted sequence analysis of Arabidopsis thaliana (ecotype Columbia-0) reported an insertion of 270-kb mtDNA into the pericentric region on the short arm of chromosome 2. DNA fiber-based fluorescence in situ hybridization analyses reveal that the mtDNA insert is 618 ± 42 kb, ≈2.3 times greater than that determined by contig assembly and sequencing analysis. Portions of the mitochondrial genome previously believed to be absent were identified within the insert. Sections of the mtDNA are repeated throughout the insert. The cytological data illustrate that DNA contig assembly by using bacterial artificial chromosomes tends to produce a minimal clone path by skipping over duplicated regions, thereby resulting in sequencing errors. We demonstrate that fiber-fluorescence in situ hybridization is a powerful technique to analyze large repetitive regions in the higher eukaryotic genomes and is a valuable complement to ongoing large genome sequencing projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Thesis (Master, Computing) -- Queen's University, 2016-05-29 18:11:34.114

Relevância:

30.00% 30.00%

Publicador:

Resumo:

We address the practical issue of using thermal image data without adjustment or calibration for projects which do not require actual temperatures per se. Large scale airborne scanning in the thermal band at 8.5–13 μm was obtained for a mangrove and salt marsh in subtropical eastern Australia. For open sites, the raw image values were strongly positively correlated with ground level temperatures. For sites under mangrove canopy cover, image values indicated temperatures 2–4°C lower than those measured on the ground. The raw image was useful in identifying water bodies under canopy and has the potential for locating channel lines of deeper water. This could facilitate modification to increase flushing in the system, thereby reducing mosquito larval survival.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Rural electrification projects and programmes in many countries have suffered from design, planning, implementation and operational flaws as a result of ineffective project planning and lack of systematic project risk analysis. This paper presents a hierarchical risk-management framework for effectively managing large-scale development projects. The proposed framework first identifies, with the involvement of stakeholders, the risk factors for a rural electrification programme at three different levels (national, state and site). Subsequently it develops a qualitative risk prioritising scheme through probability and severity mapping and provides mitigating measures for most vulnerable risks. The study concludes that the hierarchical risk-management approach provides an effective framework for managing large-scale rural electrification programmes. © IAIA 2007.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Conventional project management techniques are not always sufficient to ensure time, cost and quality achievement of large-scale construction projects due to complexity in planning, design and implementation processes. The main reasons for project non-achievement are changes in scope and design, changes in government policies and regulations, unforeseen inflation, underestimation and improper estimation. Projects that are exposed to such an uncertain environment can be effectively managed with the application of risk management throughout the project's life cycle. However, the effectiveness of risk management depends on the technique through which the effects of risk factors are analysed/quantified. This study proposes the Analytic Hierarchy Process (AHP), a multiple attribute decision making technique, as a tool for risk analysis because it can handle subjective as well as objective factors in a decision model that are conflicting in nature. This provides a decision support system (DSS) to project management for making the right decision at the right time for ensuring project success in line with organisation policy, project objectives and a competitive business environment. The whole methodology is explained through a case application of a cross-country petroleum pipeline project in India and its effectiveness in project management is demonstrated.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

An increasing number of organisational researchers have turned to social capital theory in an attempt to better understand the impetus for knowledge sharing at the individual and organisational level. This thesis extends that research by investigating the impact of social capital on knowledge sharing at the group-level in the organisational project context. The objective of the thesis is to investigate the importance of social capital in fostering tacit knowledge sharing among the team members of a project. The analytical focus is on the Nahapiet and Ghoshal framework of social capital but also includes elements of other scholars' work. In brief, social capital is defined as an asset that is embedded in the network of relationships possessed by an individual or social unit. It is argued that the main dimensions of social capital that are of relevance to knowledge sharing are structural, cognitive, and relational because these, among other things, foster the exchange and combination of knowledge and resources among the team members. Empirically, the study is based on the grounded theory method. Data were collected from five projects in large, medium, and small ICT companies in Malaysia. Underpinned by the constant comparative method, data were derived from 55 interviews, and observations. The data were analysed using open, axial, and selective coding. The analysis also involved counting frequency occurrence from the coding generated by grounded theory to find the important items and categories under social capital dimensions and knowledge sharing, and for further explaining sub-groups within the data. The analysis shows that the most important dimension for tacit knowledge sharing is structural capital. Most importantly, the findings also suggest that structural capital is a prerequisite of cognitive capital and relational capital at the group-level in an organisational project. It also found that in a project context, relational capital is hard to realise because it requires time and frequent interactions among the team members. The findings from quantitative analysis show that frequent meetings and interactions, relationship, positions, shared visions, shared objectives, and collaboration are among the factors that foster the sharing of tacit knowledge among the team members. In conclusion, the present study adds to the existing literature on social capital in two main ways. Firstly, it distinguishes the dimensions of social capital and identifies that structural capital is the most important dimension in social capital and it is a prerequisite of cognitive and relational capital in a project context. Secondly, it identifies the causal sequence in the dimension of social capital suggesting avenues for further theoretical and empirical work in this emerging area of inquiry.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Many planning and control tools, especially network analysis, have been developed in the last four decades. The majority of them were created in military organization to solve the problem of planning and controlling research and development projects. The original version of the network model (i.e. C.P.M/PERT) was transplanted to the construction industry without the consideration of the special nature and environment of construction projects. It suited the purpose of setting up targets and defining objectives, but it failed in satisfying the requirement of detailed planning and control at the site level. Several analytical and heuristic rules based methods were designed and combined with the structure of C.P.M. to eliminate its deficiencies. None of them provides a complete solution to the problem of resource, time and cost control. VERT was designed to deal with new ventures. It is suitable for project evaluation at the development stage. CYCLONE, on the other hand, is concerned with the design and micro-analysis of the production process. This work introduces an extensive critical review of the available planning techniques and addresses the problem of planning for site operation and control. Based on the outline of the nature of site control, this research developed a simulation based network model which combines part of the logics of both VERT and CYCLONE. Several new nodes were designed to model the availability and flow of resources, the overhead and operating cost and special nodes for evaluating time and cost. A large software package is written to handle the input, the simulation process and the output of the model. This package is designed to be used on any microcomputer using MS-DOS operating system. Data from real life projects were used to demonstrate the capability of the technique. Finally, a set of conclusions are drawn regarding the features and limitations of the proposed model, and recommendations for future work are outlined at the end of this thesis.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Practitioners assess performance of entities in increasingly large and complicated datasets. If non-parametric models, such as Data Envelopment Analysis, were ever considered as simple push-button technologies, this is impossible when many variables are available or when data have to be compiled from several sources. This paper introduces by the 'COOPER-framework' a comprehensive model for carrying out non-parametric projects. The framework consists of six interrelated phases: Concepts and objectives, On structuring data, Operational models, Performance comparison model, Evaluation, and Result and deployment. Each of the phases describes some necessary steps a researcher should examine for a well defined and repeatable analysis. The COOPER-framework provides for the novice analyst guidance, structure and advice for a sound non-parametric analysis. The more experienced analyst benefits from a check list such that important issues are not forgotten. In addition, by the use of a standardized framework non-parametric assessments will be more reliable, more repeatable, more manageable, faster and less costly. © 2010 Elsevier B.V. All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Post-disaster housing reconstruction projects face several challenges. Resources and material supplies are often scarce; several and different types of organizations are involved, while projects must be completed as quickly as possible to foster recovery. Within this context, the chapter aims to increase the understanding of relief supply chain design in reconstruction. In addition, the chapter is introducing a community based and beneficiary perspective to relief supply chains by evaluating the implications of local components for supply chain design in reconstruction. This is achieved through the means of secondary data analysis based on the evaluation reports of two major housing reconstruction projects that took place in Europe the last decade. A comparative analysis of the organizational designs of these projects highlights the ways in which users can be involved. The performance of reconstruction supply chains seems to depend to a large extent on the way beneficiaries are integrated in supply chain design impacting positively on the effectiveness of reconstruction supply chains.