981 resultados para Innovative HR Practices
Resumo:
There has been a great deal of concern by county engineers and supervisors over constrained budgets, lack of resources and a deteriorating infrastructure, as they affect the secondary road system in Iowa. In addition, public input and/or political pressure have been increasing over the years. This study was initiated to determine the most important issues facing counties and document the way in which various Iowa counties have been addressing those issues. The list of issues was developed through meetings of county engineers and supervisors in each of the Iowa Department of Transportation (DOT) regions around the state. Questionnaires were sent to all engineers and supervisors statewide asking them how the various issues (e.g. snow and ice removal policies, Level "B" roads, and so on) were handled in their respective counties. The responses were then compiled into this document. The subjects selected and used include: county policies, ordinances, resolutions; snow and ice removal policy; dust control; Level "B" roads; vacating roads; rural development; private entrance construction and maintenance; roadside management practices; right of way encroachments and easements; personnel matters, staff and organization; communicating information to citizens; supervisor/ engineer relations; and county leasing/purchasing practices.
Resumo:
Soil slope instability concerning highway infrastructure is an ongoing problem in Iowa, as slope failures endanger public safety and continue to result in costly repair work. Volume I of this current study summarizes research methods and findings, while Volume II provides procedural details for incorporating into practice an infrequently-used testing technique–borehole shear tests. Volume III of this study of field investigation of fifteen slopes in Iowa demonstrates through further experimental testing how lateral forces develop along stabilizing piles to resist slope movements. Results establish the feasibility of an alternative stabilization approach utilizing small-diameter pile elements. Also, a step-by-step procedure that can be used by both state and county transportation agencies to design slope reinforcement using slender piles is documented. Initial evidence of the efficiency and cost-effectiveness of stabilizing nuisance slope failures with grouted micropiles is presented. Employment of the remediation alternative is deemed more appropriate for stabilizing shallow slope failures. Overall, work accomplished in this research study included completing a comprehensive literature review on the state of the knowledge of slope stability and slope stabilization, the preparation and performance of fourteen full-scale pile load tests, the analysis of load test results, and the documentation of a design methodology for implementing the technology into current practices of slope stabilization. Recommendations for further research include monitoring pilot studies of slope reinforcement with grouted micropiles, supplementary experimental studies, and advanced numerical studies.
Resumo:
A review of the Iowa Department of Transportation's field data collection and reporting system has been performed. Included were several systems used by the Office of Construction and Local Jurisdictions. The entire field data collection and reporting systems for asphalt cement concrete (ACC) paving, portland cement concrete (PCC) paving, and PCC structures were streamlined and computerized. The field procedures for materials acceptance were also reviewed. Best practices were identified and a method was developed to prioritize materials so transportation agencies could focus their efforts on high priority materials. Iowa State University researchers facilitated a discussion about Equal Employment Opportunity (EEO) and Affirmative Action (AA) procedures between the Office of Construction field staff and the Office of Contracts. A set of alternative procedures was developed. Later the Office of Contracts considered these alternatives as they developed new procedures that are currently being implemented. The job close-out package was reviewed and two unnecessary procedures were eliminated. Numerous other procedures were reviewed and flowcharted. Several changes have been recommended that will increase efficiency and allow staff time to be devoted to higher priority activities. It is estimated the improvements in ACC paving, PCC paving and structural concrete will by similar to three full time equivalent (FTE) positions to field construction, field materials and Office of Materials. Elimination of EEO interviews will be equivalent to one FTE position. It is estimated that other miscellaneous changes will be equivalent to at least one other FTE person. This is a total five FTEs. These are conservative estimates based on savings that are easily quantified. It is likely that total positive effect is greater when items that are difficult to quantify are considered.
Resumo:
This report describes a new approach to the problem of scheduling highway construction type projects. The technique can accurately model linear activities and identify the controlling activity path on a linear schedule. Current scheduling practices are unable to accomplish these two tasks with any accuracy for linear activities, leaving planners and manager suspicious of the information they provide. Basic linear scheduling is not a new technique, and many attempts have been made to apply it to various types of work in the past. However, the technique has never been widely used because of the lack of an analytical approach to activity relationships and development of an analytical approach to determining controlling activities. The Linear Scheduling Model (LSM) developed in this report, completes the linear scheduling technique by adding to linear scheduling all of the analytical capabilities, including computer applications, present in CPM scheduling today. The LSM has tremendous potential, and will likely have a significant impact on the way linear construction is scheduled in the future.
Resumo:
In May 1950 a proposal for a research project was submitted to the newly formed Iowa Highway Research Board for consideration and action. This project, designated RPSl by the Board, encompassed the study, development, preparation of preliminary plans and specifications for the construction of a wheel track to be used in the accelerated testing of highway pavements. The device envisioned in the proposal was a circular track about seventy-five feet in diameter equipped with a suitable automobile-tired device to test pavements about five feet in width laid into the track under regular construction practices by small scale construction equipment. The Board, upon review, revised and expanded the basic concepts of the project. The project as revised by the Board included a study of the feasibility of developing, constructing and operating an accelerated testing track in which pavements, bases and subgrades may be laid one full lane, or at least ten feet, in width by full size construction equipment in conformity with usual construction practices. The pavements so laid are to be subjected, during test, to conditions as nearly simulating actual traffic as possible.
Resumo:
If adequately designed and high quality material and good construction practices are used, portland cement concrete is very durable. This is demonstrated by the oldest pavement in Iowa (second oldest in the U.S.) paved in 1904, which performed well for 70 years without resurfacing. The design thickness is an important factor in both the performance and cost of pavement. The objective of this paper is to provide a 30-year performance evaluation of a pavement constructed to determine the required design thickness for low volume secondary roadways. In 1951 Greene County and the Iowa Highway Research Board of the Iowa Department of Transportation initiated a four-mile (6.4 km) demonstration project to evaluate thicknesses ranging from 4-1/2" (11.4 cm) to 6" (15.2 cm). The project, consisting of 10 research sections, was formed pavement placed on a gravel roadbed with very little preparation except for redistribution of the loose aggregate. Eight sections were non-reinforced except for centerline tie bars and no contraction joints were used. Mesh reinforcing and contraction joints spaced at 29' 7" (9.02 m) intervals were used in two 4-1/2" (11.4 cm) thick sections. The only air entrained section was non-reinforced. The pavement performed well over its 30-year life carrying a light volume of traffic and did not require major maintenance. There was substantial cracking with average slab length varying directly with thickness. The 4-1/2" (11.4 cm) thick non-air entrained, mesh-reinforced pavement with contraction joints has performed the best.
Resumo:
Innovative Rail Ltd. of Cedar Rapids, Iowa produced a new rail/highway crossing gate arm that shows promise in two areas: a. Minimizing arm breakage, and b. Added target value to motorists. The new gate was demonstrated to the Chicago and North Western Transportation Company, and that railroad has requested its use at two crossings on an "experimental basis" to determine if its installation provides relief in those areas. On April 18, 1986, the Department observed a test of the material under field conditions with the Transportation Company. The gate received four mid-center strikes at 5 MPH by a company truck while in the lowered position, and showed no damage. In a fifth mid-center strike at 15 MPH, the gate was visibly damaged at the connection to its raising mechanism, but continued to function though at a 5-10 degree drop. Several pictures of the gate and its saddle mechanism are shown in Appendix A of this report. Innovative Rail established distributorships in the United States and Canada, and has since gone out of business.
Resumo:
This report summarizes the analysis of transverse cracking in asphalt pavement by a five state study team from Iowa, Kansas, Nebraska, North Dakota, and Oklahoma. The study was initiated under the sponsorship of the Federal Highway Administration and four evaluation conferences were held during the course of the study. Each state conducted a crack inventory on their asphalt pavement. An effort was made to correlate this inventory with numerous factors that were considered to be pertinent to the cracking problem. One state did indicate that there was a correlation between transverse cracking severity and the subsurface geology. The other states were unable to identify any significant factors as being the primary contributors. The analysis of the problem was divided into, (1) mix design, (2) maintenance, and (3) 3R rehabilitation. Many potential factors to be considered were identified under each of these three study divisions. There were many conclusions as to good and bad practices. One major conclusions was that a more effective crack maintenance program with early sealing was essential. Some new practices were suggested as potentially more cost effective in design, construction and maintenance. The interchange of methods and procedures by individual states yielded benefits in that other states selected practices that would be an improvement to their program.
Resumo:
Reconstruction of bridge approach slabs which have failed due to a loss of support from embankment fill consolidation or erosion can be particularly challenging in urban areas where lane closures must be minimized. Precast prestressed concrete pavement is a potential solution for rapid bridge approach slab reconstruction which uses prefabricated pavement panels that can be installed and opened to traffic quickly. To evaluate this solution, the Iowa Department of Transportation constructed a precast prestressed approach slab demonstration project on Highway 60 near Sheldon, Iowa in August/September 2006. Two approach slabs at either end of a new bridge were constructed using precast prestressed concrete panels. This report documents the successful development, design, and construction of the precast prestressed concrete bridge approach slabs on Highway 60. The report discusses the challenges and issues that were faced during the project and presents recommendations for future implementation of this innovative construction technique.
Resumo:
The focus of highway runoff monitoring programs is on the identification of highway contributions to nonpoint source degradation of surface and groundwater quality. The results of such studies will assist the Iowa Department of Transportation (DOT) in the development of maintenance practices that will minimize the impact of highway transportation networks on water quality while at the same time maintaining public safety. Highway runoff monitoring research will be useful in developing a basis to address issues in environmental impact statements for future highway network expansions. Further, it will lead to optimization of cost effectiveness/environmental factors related to de-icing, weed and dust control, highway drainage, construction methods, etc. In this report, the authors present the data accumulated to date with a preliminary interpretation of the significance of the data. The report will discuss the site setup, operational aspects of data collection, and problems encountered. In addition, recommendations are included to optimize information gained from the study.
Resumo:
Information concerning standard design practices and details for the Iowa Department of Transportation (IDOT) was provided to the research team. This was reviewed in detail so that the researchers would be familiar with the terminology and standard construction details. A comprehensive literature review was completed to gather information concerning constructability concepts applicable to bridges. It was determined that most of the literature deals with constructability as a general topic with only a limited amount of literature with specific concepts for bridge design and construction. Literature was also examined concerning the development of appropriate microcomputer databases. These activities represent completion of Task 1 as identified in the study.
Resumo:
Currently there are no guidelines within the Manual on Uniform Traffic Control Devices (MUTCD) on construction phasing and maintenance of traffic (MOT) for retrofit construction and maintenance projects involving innovative geometric designs. The research presented in this report addressed this gap in existing knowledge by investigating the state of the practice of construction phasing and MOT for several types of innovative geometric designs including the roundabout, single point urban interchange (SPUI), diverging diamond interchange (DDI), restricted-crossing left turn (RCUT), median U-turn (MUT), and displaced left turn (DLT). This report provides guidelines for transportation practitioners in developing construction phasing and MOT plans for innovative geometric designs. This report includes MOT Phasing Diagrams to assist in the development of MOT strategies for innovative designs. The MOT Phasing Diagrams were developed through a review of literature, survey, interviews with practitioners, and review of plans from innovative geometric design projects. These diagrams are provided as a tool to assist in improving work zone safety and mobility through construction of projects with innovative geometric designs. The aforementioned synthesis of existing knowledge documented existing practices for these types of designs.
A Progress Report on Treating Loess, Fine Sands and Soft Limestones with Liquid Binders, HR-20, 1954
Resumo:
Certain areas of Iowa abound in loess, others contain soft limestones that are readily and cheaply available, and a large portion of the state is underlaid with sand. None of these materials is considered suitable in present practices for use in all-weather road construction. The loess is too fine and too difficult to handle; the limestones are considered too soft, and some of the harder ones unsound for this use; the sands are not naturally of the desired gradation and do not lend themselves to blending into satisfactory gradations. The purpose of this project is, therefore, to study and develop means and to determine the feasibility of using these materials, loess, fine sand, and soft limestones, either separately or in combinations in conjunction with liquid binders to produce paving mixtures applicable for all-weather road construction. Also included in the project was the development of methods of processing any of these materials, if necessary, to make them suitable for the desired purpose
Resumo:
This study presents an innovative methodology for forensic science image analysis for event reconstruction. The methodology is based on experiences from real cases. It provides real added value to technical guidelines such as standard operating procedures (SOPs) and enriches the community of practices at stake in this field. This bottom-up solution outlines the many facets of analysis and the complexity of the decision-making process. Additionally, the methodology provides a backbone for articulating more detailed and technical procedures and SOPs. It emerged from a grounded theory approach; data from individual and collective interviews with eight Swiss and nine European forensic image analysis experts were collected and interpreted in a continuous, circular and reflexive manner. Throughout the process of conducting interviews and panel discussions, similarities and discrepancies were discussed in detail to provide a comprehensive picture of practices and points of view and to ultimately formalise shared know-how. Our contribution sheds light on the complexity of the choices, actions and interactions along the path of data collection and analysis, enhancing both the researchers' and participants' reflexivity.
Resumo:
Kunnissa eletään muutosten aikaa, ja osaamisen johtamisella pyritään vastaamaan kehityksen mukanaan tuomiin haasteisiin. Osaamisen johtamista pidetäänkin tärkeänä asiana kuntien kehittämisessä. Viime vuosina osaamisen johtaminen on ollut voimakkaasti esillä myös yksityisellä sektorilla, jossa se on nähty tärkeänä elementtinä kilpailukyvyn kehittämisessä. Osaamisen johtaminen on toimintaa, jolla kehitetään yksilöiden ja organisaation osaamista sekä organisaation yhteistyövalmiutta. Osaamisen johtamisessa huomioidaan myös organisaatiolle asetetut strategiset tavoitteet. Tässä tutkimuksessa osaamisen johtaminen ankkuroidaan tietojohtamisen, henkilöstövoimavarojen johtamisen (HRM:n) ja oppivan organisaation viitekehyksiin. Tutkimusotteeksi on valittu kvantitatiivinen tutkimusote. Kvantitatiivinen tutkimusote mahdollistaa osaamisen johtamisen rakenteellisen analyysin ja kuvaamisen. Tutkimuksen kohderyhmänä ovat kaikki Suomen 444 kuntaa vuonna 2004. Tutkimuksen tiedonkeruu suoritettiin lomakekyselyn avulla, ja tutkimus kohdistettiin kuntien henkilöstöasioiden asiantuntijoille. Tutkimuksen keskeisenä tavoitteena oli mallintaa ja kuvata osaamisen johtamista Suomen kunnissa. Tutkimusongelma liittyy kuntien osaamisen johtamisen nykytilaan ja tavoitteisiin sekä siihen, missä vaiheissa kunnat ovat osaamisen johtamisessaan. Kyselyn avulla tutkittiin myös kuntien halukkuutta kehittää osaamisen johtamistaan. Vastausten pohjalta analysoitiin lisäksi, mitkä asiat kunnissa vaikuttavat osaamisen johtamiseen. Tutkimuksen tuloksissa tulevat esille neljä erilaista kunnissa vallitsevaa osaamisen johtamisen orientaatiota: Strategiaohjattu yhteisöllinen orientaatio, Innovatiivinen orientaatio, Teknologinen orientaatio ja Strategialähtöinen järjestelmäorientaatio. Nämä neljä orientaatiota ovat tunnistettavissa myös taustakirjallisuudessa. Kunnat ryhmiteltiin orientaatioiden perusteella neljään ryhmään, jotka nimettiin seuraavasti: Innostuneet aloittelijat, Tekniset aloittelijat, Edistyneet ja Kehittyvät. Innostuneiden aloittelijoiden ryhmässä korostuu innovatiivinen orientaatio, mutta muut osaamisen johtamisen orientaatiot tulevat esille heikosti. Teknisten aloittelijoiden ryhmässä korostuu teknologinen orientaatio, mutta muut osaamisen johtamisen orientaatiot tulevat esille heikosti. Edistyneiden ryhmässä kaikki osaamisen johtamisen orientaatiot tulevat hyvin esille. Kehittyvien ryhmässä korostuvat sekä innovatiivinen että teknologinen orientaatio. Kuntien osaamisen johtamisen nykytilanne on murroksessa. Osaamisen johtaminen on suuressa osassa kunnista hyvässä vauhdissa, mutta kehitettävääkin on. Tietotekniset välineet osaamisen johtamisessa ovat hyvät useimmissa kunnissa. Tulevaisuuden osaamistarpeina pidetään erityisesti vuorovaikutustaitoja ja oman ammattialan osaamista. Kunnissa on myös huomioitu ainakin tavoitteiden tasolla tulevaisuus ja sen tuomat haasteet.