934 resultados para Industrial buildings Design and construction
Resumo:
"July 1980."
Resumo:
No more published.
Resumo:
The suspen-dome system is a new structural form that has become popular in the construction of long-span roof structures. These domes are very slender and lightweight, their configuration is complicated, and hence sequential consideration in the structural design is needed. This paper focuses on these considerations, which include the method for designing cable prestress force, a simplified analysis method, and the estimation of buckling capacity. Buckling is one of the most important problems for dome structures. This paper presents the findings of an intensive buckling study of the Lamella suspen-dome system that takes geometric imperfection, asymmetric loading, rise-to-span ratio, and connection rigidity into consideration. Finally, suggested design and construction guidelines are given in the conclusion of this paper. (c) 2005 Elsevier Ltd. All rights reserved.
Resumo:
SINNMR (Sonically Induced Narrowing of the Nuclear Magnetic Resonance spectra of solids), is a novel technique that is being developed to enable the routine study of solids by nuclear magnetic resonance spectroscopy. SINNMR aims to narrow the broad resonances that are characteristic of solid state NMR by inducing rapid incoherent motion of solid particles suspended in a support medium, using high frequency ultrasound in the range 2-10 MHz. The width of the normal broad resonances from solids are due to incomplete averaging of several components of the total spin Hamiltonian caused by restrictions placed on molecular motion within a solid. At present Magic Angle Spinning (MAS) NMR is the classical solid state technique used to reduce line broadening, but: this has associated problems, not least of which is the appearance of many spinning side bands which confuse the spectra. It is hoped that SlNNMR will offer a simple alternative, particularly as it does not reveal spinning sidebands The fundamental question concerning whether the use of ultrasound within a cryo-magnet will cause quenching has been investigated with success, as even under the most extreme conditions of power, frequency and irradiator time, the magnet does not quench. The objective of this work is to design and construct a SINNMR probe for use in a super conducting cryo-magnet NMR spectrometer. A cell for such a probe has been constructed and incorporated into an adapted high resolution broadband probe. It has been proved that the cell is capable of causing cavitation, up to 10 MHz, by running a series of ultrasonic reactions within it and observing the reaction products. It was found that the ultrasound was causing the sample to be heated to unacceptable temperatures and this necessitated the incorporation of temperature stabilisation devices. Work has been performed on the investigation of the narrowing of the solid state 23Na spectrum of tri-sodium phosphate using high frequency ultrasound. Work has also been completed on the signal enhancement and T1 reduction of a liquid mixture and a pure compound using ultrasound. Some preliminary "bench" experiments have been completed on a novel ultrasonic device designed to help minimise sample heating. The concept involves passing the ultrasound through a temperature stabilised, liquid filled funnel that has a drum skin on the end that will enable the passage of ultrasound into the sample. Bench experiments have proved that acoustic attenuation is low and that cavitation in the liquid beyond the device is still possible.
Resumo:
This study is concerned with quality and productivity aspects of traditional house building. The research focuses on these issues by concentrating on the services and finishing stages of the building process. These are work stages which have not been fully investigated in previous productivity related studies. The primary objective of the research is to promote an integrated design and construction led approach to traditional house building based on an original concept of 'development cycles'. This process involves the following: site monitoring; the analysis of work operations; implementing design and construction changes founded on unique information collected during site monitoring; and subsequent re-monitoring to measure and assess Ihe effect of change. A volume house building firm has been involved in this applied research and has allowed access to its sites for production monitoring purposes. The firm also assisted in design detailing for a small group of 'experimental' production houses where various design and construction changes were implemented. Results from the collaborative research have shown certain quality and productivity improvements to be possible using this approach, albeit on a limited scale at this early experimental stage. The improvements have been possible because an improved activity sampling technique, developed for, and employed by the study, has been able to describe why many quality and productivity related problems occur during site building work. Experience derived from the research has shown the following attributes to be important: positive attitudes towards innovation; effective communication; careful planning and organisation; and good coordination and control at site level. These are all essential aspects of quality led management and determine to a large extent the overall success of this approach. Future work recommendations must include a more widespread use of innovative practices so that further design and construction modifications can be made. By doing this, productivity can be improved, cost savings made and better quality afforded.
Resumo:
A man-machine system called teleoperator system has been developed to work in hazardous environments such as nuclear reactor plants. Force reflection is a type of force feedback in which forces experienced by the remote manipulator are fed back to the manual controller. In a force-reflecting teleoperation system, the operator uses the manual controller to direct the remote manipulator and receives visual information from a video image and/or graphical animation on the computer screen. This thesis presents the design of a portable Force-Reflecting Manual Controller (FRMC) for the teleoperation of tasks such as hazardous material handling, waste cleanup, and space-related operations. The work consists of the design and construction of a prototype 1-Degree-of-Freedom (DOF) FRMC, the development of the Graphical User Interface (GUI), and system integration. Two control strategies - PID and fuzzy logic controllers are developed and experimentally tested. The system response of each is analyzed and evaluated. In addition, the concept of a telesensation system is introduced, and a variety of design alternatives of a 3-DOF FRMC are proposed for future development.
Resumo:
The aims of this thesis were evaluation the type of wave channel, wave current, and effect of some parameters on them and identification and comparison between types of wave maker in laboratory situations. In this study, designing and making of two dimension channels (flume) and wave maker for experiment son the marine buoy, marine building and energy conversion systems were also investigated. In current research, the physical relation between pump and pumpage and the designing of current making in flume were evaluated. The related calculation for steel building, channels beside glasses and also equations of wave maker plate movement, power of motor and absorb wave(co astal slope) were calculated. In continue of this study, the servo motor was designed and applied for moving of wave maker’s plate. One Ball Screw Leaner was used for having better movement mechanisms of equipment and convert of the around movement to linear movement. The Programmable Logic Controller (PLC) was also used for control of wave maker system. The studies were explained type of ocean energies and energy conversion systems. In another part of this research, the systems of energy resistance in special way of Oscillating Water Column (OWC) were explained and one sample model was designed and applied in hydrolic channel at the Sheikh Bahaii building in Azad University, Science and Research Branch. The dimensions of designed flume was considered at 16 1.98 0. 57 m which had ability to provide regular waves as well as irregular waves with little changing on the control system. The ability of making waves was evaluated in our designed channel and the results were showed that all of the calculation in designed flume was correct. The mean of error between our results and theory calculation was conducted 7%, which was showed the well result in this situation. With evaluating of designed OWC model and considering of changes in the some part of system, one bigger sample of this model can be used for designing the energy conversion system model. The obtained results showed that the best form for chamber in exit position of system, were zero degree (0) in angle for moving below part, forty and five (45) degree in front wall of system and the moving forward of front wall keep in two times of height of wave.
Resumo:
El peticionari és el propietari d’una nau industrial aïllada del terme municipal de Cassà de la Selva destinada a la venda i exposició de materials per a la construcció. A causa de la creixent demanda en el sector es vol ampliar la superfície de la nau, amb la intenció d’augmentar la zona comercial. El disseny i càlcul de l’ampliació de la nau aïllada inclou moviment de terres, fonaments, estructura, tancaments, coberta, paviments, obra de paleta, fusteria, i pintura. També s’inclourà el disseny i càlcul de les instal·lacions (aigua, baixa tensió, il·luminació, climatització, ventilació, contra incendis, plaques solars, sanejament) de l’ampliació
Resumo:
With an increasing level of collaboration amongst researchers, software developers and industry practitioners in the past three decades, building information modelling (BIM) is now recognized as an emerging technological and procedural shift within the architect, engineering and construction (AEC) industry. BIM is not only considered as a way to make a profound impact on the professions of AEC, but is also regarded as an approach to assist the industry to develop new ways of thinking and practice. Despite the widespread development and recognition of BIM, a succinct and systematic review of the existing BIM research and achievement is scarce. It is also necessary to take stock on existing applications and have a fresh look at where BIM should be heading and how it can benefit from the advances being made. This paper first presents a review of BIM research and achievement in AEC industry. A number of suggestions are then made for future research in BIM. This paper maintains that the value of BIM during design and construction phases is well documented over the last decade, and new research needs to expand the level of development and analysis from design/build stage to postconstruction and facility asset management. New research in BIM could also move beyond the traditional building type to managing the broader range of facilities and built assets and providing preventative maintenance schedules for sustainable and intelligent buildings
Resumo:
A common problem in many data based modelling algorithms such as associative memory networks is the problem of the curse of dimensionality. In this paper, a new two-stage neurofuzzy system design and construction algorithm (NeuDeC) for nonlinear dynamical processes is introduced to effectively tackle this problem. A new simple preprocessing method is initially derived and applied to reduce the rule base, followed by a fine model detection process based on the reduced rule set by using forward orthogonal least squares model structure detection. In both stages, new A-optimality experimental design-based criteria we used. In the preprocessing stage, a lower bound of the A-optimality design criterion is derived and applied as a subset selection metric, but in the later stage, the A-optimality design criterion is incorporated into a new composite cost function that minimises model prediction error as well as penalises the model parameter variance. The utilisation of NeuDeC leads to unbiased model parameters with low parameter variance and the additional benefit of a parsimonious model structure. Numerical examples are included to demonstrate the effectiveness of this new modelling approach for high dimensional inputs.
Resumo:
Large parts of the world are subjected to one or more natural hazards, such as earthquakes, tsunamis, landslides, tropical storms (hurricanes, cyclones and typhoons), costal inundation and flooding. Virtually the entire world is at risk of man-made hazards. In recent decades, rapid population growth and economic development in hazard-prone areas have greatly increased the potential of multiple hazards to cause damage and destruction of buildings, bridges, power plants, and other infrastructure; thus posing a grave danger to the community and disruption of economic and societal activities. Although an individual hazard is significant in many parts of the United States (U.S.), in certain areas more than one hazard may pose a threat to the constructed environment. In such areas, structural design and construction practices should address multiple hazards in an integrated manner to achieve structural performance that is consistent with owner expectations and general societal objectives. The growing interest and importance of multiple-hazard engineering has been recognized recently. This has spurred the evolution of multiple-hazard risk-assessment frameworks and development of design approaches which have paved way for future research towards sustainable construction of new and improved structures and retrofitting of the existing structures. This report provides a review of literature and the current state of practice for assessment, design and mitigation of the impact of multiple hazards on structural infrastructure. It also presents an overview of future research needs related to multiple-hazard performance of constructed facilities.
Resumo:
The Commercial and Industrial Network improvement and programming policy reflected in this summary report was adopted for use in future highway programming by the Transportation Commission on November 5, 1991. The Iowa Department of Transportation, as directed by the Legislature, has established a 2,331-mile network of commercial and industrial highways and is directing a significant amount of primary construction funding resources toward improvements to this network. This summary outlines the technical needs assessment for improvements on the Commercial and Industrial Network for the next 20-year period. The portions of the network which require four-lane capacity, as well as major improvements to the two-lane sections, are graphically displayed. Detailed improvement needs and costs are listed in tabular form for the first two five-year periods (1992-1996 and 1997-2001). It is essential to note that these improvement needs are the result of a technical assessment and do not imply any funding commitment.
Resumo:
Multi-level concrete buildings requrre substantial temporary formwork structures to support the slabs during construction. The primary function of this formwork is to safely disperse the applied loads so that the slab being constructed, or the portion of the permanent structure already constructed, is not overloaded. Multi-level formwork is a procedure in which a limited number of formwork and shoring sets are cycled up the building as construction progresses. In this process, each new slab is supported by a number of lower level slabs. The new slab load is, essentially, distributed to these supporting slabs in direct proportion to their relative stiffness. When a slab is post-tensioned using draped tendons, slab lift occurs as a portion of the slab self-weight is balanced. The formwork and shores supporting that slab are unloaded by an amount equivalent to the load balanced by the post-tensioning. This produces a load distribution inherently different from that of a conventionally reinforced slab. Through , theoretical modelling and extensive on-site shore load measurement, this research examines the effects of post-tensioning on multilevel formwork load distribution. The research demonstrates that the load distribution process for post-tensioned slabs allows for improvements to current construction practice. These enhancements include a shortening of the construction period; an improvement in the safety of multi-level form work operations; and a reduction in the quantity of form work materials required for a project. These enhancements are achieved through the general improvement in safety offered by post-tensioning during the various formwork operations. The research demonstrates that there is generally a significant improvement in the factors of safety over those for conventionally reinforced slabs. This improvement in the factor of safety occurs at all stages of the multi-level formwork operation. The general improvement in the factors of safety with post-tensioned slabs allows for a shortening of the slab construction cycle time. Further, the low level of load redistribution that occurs during the stripping operations makes post-tensioned slabs ideally suited to reshoring procedures. Provided the overall number of interconnected levels remains unaltered, it is possible to increase the number of reshored levels while reducing the number of undisturbed shoring levels without altering the factors of safety, thereby, reducing the overall quantity of formwork and shoring materials.