691 resultados para Forfeiture clause
Resumo:
Executive Summary The objective of this report was to use the Sydney Opera House as a case study of the application of Building Information Modelling (BIM). The Sydney opera House is a complex, large building with very irregular building configuration, that makes it a challenging test. A number of key concerns are evident at SOH: • the building structure is complex, and building service systems - already the major cost of ongoing maintenance - are undergoing technology change, with new computer based services becoming increasingly important. • the current “documentation” of the facility is comprised of several independent systems, some overlapping and is inadequate to service current and future services required • the building has reached a milestone age in terms of the condition and maintainability of key public areas and service systems, functionality of spaces and longer term strategic management. • many business functions such as space or event management require up-to-date information of the facility that are currently inadequately delivered, expensive and time consuming to update and deliver to customers. • major building upgrades are being planned that will put considerable strain on existing Facilities Portfolio services, and their capacity to manage them effectively While some of these concerns are unique to the House, many will be common to larger commercial and institutional portfolios. The work described here supported a complementary task which sought to identify if a building information model – an integrated building database – could be created, that would support asset & facility management functions (see Sydney Opera House – FM Exemplar Project, Report Number: 2005-001-C-4 Building Information Modelling for FM at Sydney Opera House), a business strategy that has been well demonstrated. The development of the BIMSS - Open Specification for BIM has been surprisingly straightforward. The lack of technical difficulties in converting the House’s existing conventions and standards to the new model based environment can be related to three key factors: • SOH Facilities Portfolio – the internal group responsible for asset and facility management - have already well established building and documentation policies in place. The setting and adherence to well thought out operational standards has been based on the need to create an environment that is understood by all users and that addresses the major business needs of the House. • The second factor is the nature of the IFC Model Specification used to define the BIM protocol. The IFC standard is based on building practice and nomenclature, widely used in the construction industries across the globe. For example the nomenclature of building parts – eg ifcWall, corresponds to our normal terminology, but extends the traditional drawing environment currently used for design and documentation. This demonstrates that the international IFC model accurately represents local practice for building data representation and management. • a BIM environment sets up opportunities for innovative processes that can exploit the rich data in the model and improve services and functions for the House: for example several high-level processes have been identified that could benefit from standardized Building Information Models such as maintenance processes using engineering data, business processes using scheduling, venue access, security data and benchmarking processes using building performance data. The new technology matches business needs for current and new services. The adoption of IFC compliant applications opens the way forward for shared building model collaboration and new processes, a significant new focus of the BIM standards. In summary, SOH current building standards have been successfully drafted for a BIM environment and are confidently expected to be fully developed when BIM is adopted operationally by SOH. These BIM standards and their application to the Opera House are intended as a template for other organisations to adopt for the own procurement and facility management activities. Appendices provide an overview of the IFC Integrated Object Model and an understanding IFC Model Data.
Resumo:
“SOH see significant benefit in digitising its drawings and operation and maintenance manuals. Since SOH do not currently have digital models of the Opera House structure or other components, there is an opportunity for this national case study to promote the application of Digital Facility Modelling using standardized Building Information Models (BIM)”. The digital modelling element of this project examined the potential of building information models for Facility Management focusing on the following areas: • The re-usability of building information for FM purposes • BIM as an Integrated information model for facility management • Extendibility of the BIM to cope with business specific requirements • Commercial facility management software using standardised building information models • The ability to add (organisation specific) intelligence to the model • A roadmap for SOH to adopt BIM for FM The project has established that BIM – building information modelling - is an appropriate and potentially beneficial technology for the storage of integrated building, maintenance and management data for SOH. Based on the attributes of a BIM, several advantages can be envisioned: consistency in the data, intelligence in the model, multiple representations, source of information for intelligent programs and intelligent queries. The IFC – open building exchange standard – specification provides comprehensive support for asset and facility management functions, and offers new management, collaboration and procurement relationships based on sharing of intelligent building data. The major advantages of using an open standard are: information can be read and manipulated by any compliant software, reduced user “lock in” to proprietary solutions, third party software can be the “best of breed” to suit the process and scope at hand, standardised BIM solutions consider the wider implications of information exchange outside the scope of any particular vendor, information can be archived as ASCII files for archival purposes, and data quality can be enhanced as the now single source of users’ information has improved accuracy, correctness, currency, completeness and relevance. SOH current building standards have been successfully drafted for a BIM environment and are confidently expected to be fully developed when BIM is adopted operationally by SOH. There have been remarkably few technical difficulties in converting the House’s existing conventions and standards to the new model based environment. This demonstrates that the IFC model represents world practice for building data representation and management (see Sydney Opera House – FM Exemplar Project Report Number 2005-001-C-3, Open Specification for BIM: Sydney Opera House Case Study). Availability of FM applications based on BIM is in its infancy but focussed systems are already in operation internationally and show excellent prospects for implementation systems at SOH. In addition to the generic benefits of standardised BIM described above, the following FM specific advantages can be expected from this new integrated facilities management environment: faster and more effective processes, controlled whole life costs and environmental data, better customer service, common operational picture for current and strategic planning, visual decision-making and a total ownership cost model. Tests with partial BIM data – provided by several of SOH’s current consultants – show that the creation of a SOH complete model is realistic, but subject to resolution of compliance and detailed functional support by participating software applications. The showcase has demonstrated successfully that IFC based exchange is possible with several common BIM based applications through the creation of a new partial model of the building. Data exchanged has been geometrically accurate (the SOH building structure represents some of the most complex building elements) and supports rich information describing the types of objects, with their properties and relationships.
Resumo:
Objectives The procurement research of Sydney Opera House FM Exemplar Project aims to develop innovative methods and guidelines for the procurement of FM services, applicable to iconic and / or performing arts centre facilities, or facilities with similar FM functions. The initial procurement report in June 2005 analysed the strategic objectives and operational requirements that provide ‘demand statements’ as evaluation criteria in the service procurement process. The subsequent interim procurement report in September 2005 discussed the elements contributing to the criteria for decision-making in the service procurement process. This procurement report concentrates on the research on procurement strategies and innovative methods using a case study approach. The objectives of this report are: • to investigate service procurement methods and process in iconic and/or performing arts centre facilities; • to showcase FM innovation in Sydney Opera House through a case study; • to establish a preliminary decision-making framework and guidelines for selection of appropriate FM procurement routes to provide a useful model for FM community. Findings Findings from this procurement research are presented as follows. • FM innovation and experience of Sydney Opera House • Innovative procurement methods and processes, drawn from a case study of Sydney Opera House as exemplar • An integrated performance framework to link maintenance service functions to high level organisational objective and strategies • Procurement methods and contract outcomes, focusing on building maintenance and cleaning services of Sydney Opera House • Multi-dimensional assessment of Service Providers • General decision-making strategies and guidelines for selection of appropriate FM procurement routes Further Research Whilst the Sydney Opera House case study emphasises the experience of Sydney Opera House, a study of procurement strategies and methods from published research and FM good practice will supply facilities managers with alternative procurement routes. Further research on the procurement theme will develop a final decision-making model for the procurement of FM services, drawn from the evaluation of the case study outcomes, as well as FM good practice and findings from current published research.
Resumo:
This benchmarking research report builds on the previous benchmarking review (Report 2005-001-C-1) and presents the benchmarking data collection and framework developments thus far. The objective is to deliver a benchmarking framework and recommendations on implementation of best practice on asset maintenance. The FM Exemplar Project using the Sydney Opera House has conducted a two (2) stage survey of iconic facilities. The benchmarking team has been led by Rider Hunt Terotech with researchers from the CSIRO and The University of Sydney.
Resumo:
This Digital Modelling Report incorporates the previous research completed for the FM Exemplar Project utilising the Sydney Opera House as a case study. The research has demonstrated significant benefits in digitising design documentation and operational and maintenance manuals. Since Sydney Opera House do not have digital models of its structure, there is an opportunity to investigate the application of Digital Facility Modelling using standardised Building Information Models (BIM). The digital modelling research project has examined the potential of standardised building information models to develop a digital facility model supporting facilities management (FM). The focus of this investigation was on the following areas: • The re-usability of standardised building information models (BIM) for FM purposes. • The potential of BIM as an information framework acting as integrator for various FM data sources. • The extendibility and flexibility of the BIM to cope with business specific data and requirements. • Commercial FM software using standardised building information models. • The ability to add (organisation-specific) intelligence to the model. • A roadmap for Sydney Opera House to adopt BIM for FM.
Resumo:
This Services Procurement Report incorporates the previous benchmarking research and aims to develop innovative methods and guidelines for the procurement of FM services, applicable to iconic and / or performing arts centre facilities, or facilities with similar FM functions. The FM Exemplar Project utilising the Sydney Opera House produced its initial procurement report in June 2005 which analysed the strategic objectives and operational requirements that provide ‘demand statements’ as evaluation criteria in the service procurement process. The subsequent interim procurement report in September 2005 discussed the elements contributing to the criteria for decision-making in the service procurement process. This procurement report concentrates on the research on procurement strategies and innovative methods using a case study approach. The objectives of this report are to: Investigate service procurement methods and process in iconic and/or performing arts centre facilities; Showcase FM innovation in Sydney Opera House through a case study; Establish a preliminary decision-making framework and guidelines for selection of appropriate FM procurement routes to provide a useful model for FM community
Resumo:
his report describes in detail a project aimed at providing a better understanding of the business drivers and barriers to the adoption of Building Information Modelling (BIM) in the Architecture Engineering and Construction (AEC) and facility management (FM) industry sectors. The objectives of the project were to investigate the nature of economic, process and industry constraints to BIM adoption and then - if possible - to identify business strategies, and cost/benefit models that may support adoption of BIM in AEC/FM industry. The research was based on case studies from the property, construction and facility management sectors as well as other industries and interviews with business leaders and users of advanced applications of CAD in the industry.
Resumo:
An earlier CRC-CI project on ‘automatic estimating’ (AE) has shown the key benefit of model-based design methodologies in building design and construction to be the provision of timely quantitative cost evaluations. Furthermore, using AE during design improves design options, and results in improved design turn-around times, better design quality and/or lower costs. However, AEs for civil engineering structures do not exist; and research partners in the CRC-CI expressed interest in exploring the development of such a process. This document reports on these investigations. The central objective of the study was to evaluate the benefits and costs of developing an AE for concrete civil engineering works. By studying existing documents and through interviews with design engineers, contractors and estimators, we have established that current civil engineering practices (mainly roads/bridges) do not use model-based planning/design. Drawings are executed in 2D and only completed at the end of lengthy planning/design project management lifecycle stages. We have also determined that estimating plays two important, but different roles. The first is part of project management (which we have called macro level estimating). Estimating in this domain sets project budgets, controls quality delivery and contains costs. The second role is estimating during planning/design (micro level estimating). The difference between the two roles is that the former is performed at the end of various lifecycle stages, whereas the latter is performed at any suitable time during planning/design.
Resumo:
The determination of the most appropriate procurement method for capital works projects is a challenging task for the Department of Housing and Works (DHW) and other Western Australian State Government Agencies because of the array of assessment criteria that are considered and the procurement methods that are available. A number of different procurement systems can be used to deliver capital works projects such a traditional, design and construct and management. Sub-classifications of these systems have proliferated and continue to emerge in response to market demands. The selection of an inappropriate procurement method may lead to undesirable project outcomes. To facilitate DHW in selecting an appropriate procurement method for its capital works projects, a six step procurement method selection process is presented. The characteristics of the most common forms of procurement method used in Australia are presented. Case studies where procurement methods have been used for specific types of capital works in Western Australia are offered to provide a reference point and learning opportunity for procurement method selection.
Resumo:
A plethora of methods for procuring building projects are available to meet the needs of clients. Deciding what method to use for a given project is a difficult and challenging task as a client’s objectives and priorities need to marry with the selected method so as to improve the likelihood of the project being procured successfully. The decision as to what procurement system to use should be made as early as possible and underpinned by the client’s business case for the project. The risks and how they can potentially affect the client’s business should also be considered. In this report, the need for client’s to develop a procurement strategy, which outlines the key means by which the objectives of the project are to be achieved is emphasised. Once a client has established a business case for a project, appointed a principal advisor, determined their requirements and brief, then consideration as to which procurement method to be adopted should be made. An understanding of the characteristics of various procurement options is required before a recommendation can be made to a client. Procurement systems can be categorised as traditional, design and construct, management and collaborative. The characteristics of these systems along with the procurement methods commonly used are described. The main advantages and disadvantages, and circumstances under which a system could be considered applicable for a given project are also identified.
Resumo:
This document provides an overview of the differences and similarities in the objectives and implementation frameworks of the training and employment policies applying to public construction projects in Western Australia and Queensland. The material in the document clearly demonstrates the extent to which approaches to the pursuit of training objectives in particular have been informed by the experiences of other jurisdictions. The two State governments now have very similar approaches to the promotion of training with the WA government basing a good part of its policy approach on the “Queensland model”. As the two States share many similar economic and other characteristics, and have very similar social and economic goals, this similarity is to be expected. The capacity to benefit from the experiences of other jurisdictions is to be welcomed. The similarity in policy approach also suggests a potential for ongoing collaborations between the State governments on research aimed at further improving training and employment outcomes via public construction projects.
Resumo:
This document outlines a framework that could be used by government agencies in assessing policy interventions aimed at achieving social outcomes from government construction contracts. The framework represents a rational interpretation of the information gathered during the multi-outcomes construction policies project. The multi-outcomes project focused on the costs and benefits of using public construction contracts to promote the achievement of training and employment and public art objectives. The origin of the policy framework in a cost-benefit appraisal of current policy interventions is evidenced by its emphasis on sensitivity to policy commitment and project circumstances (especially project size and scope).The quantitative and qualitative analysis conducted in the multi-outcomes project highlighted, first, that in the absence of strong industry commitment to policy objectives, policy interventions typically result in high levels of avoidance activity, substantial administrative costs and very few benefits. Thus, for policy action on, for example, training or local employment to be successful compliance issues must be adequately addressed. Currently it appears that pre-qualification schemes (similar to the Priority Access Scheme) and schemes that rely on measuring, for example, the training investments of contractors within particular projects do not achieve high levels of compliance and involve significant administrative costs. Thus, an alternative is suggested in the policy framework developed here: a levy on each public construction project – set as a proportion of the total project costs. Although a full evaluation of this policy alternative was beyond the scope of the multi-outcomes construction policies project, it appears to offer the potential to minimize the transaction costs on contractors whilst enabling the creation of a training agency dedicated to improving the supply of skilled construction labour. A recommendation is thus made that this policy alternative be fully researched and evaluated. As noted above, the outcomes of the multi-outcomes research project also highlighted the need for sensitivity to project circumstances in the development and implementation of polices for public construction projects. Ideally a policy framework would have the flexibility to respond to circumstances where contractors share a commitment to the policy objectives and are able to identify measurable social outcomes from the particular government projects they are involved in. This would involve a project-by-project negotiation of goals and performance measures. It is likely to only be practical for large, longer term projects.
Resumo:
The K-Adv has been developed around the concept that it comprises an ICT enabling infrastructure that encompasses ICT hardware and software infrastructure facilities together with an enabling ICT support system; a leadership infrastructure support system that provides the vision for its implementation and the realisation capacity for the vision to be realised; and the necessary people infrastructure that includes the people capabilities and capacities supported by organisational processes that facilitates this resource to be mobilised.