943 resultados para Environmental-impact Assessment
Resumo:
The purpose of this paper is to investigate the reasons of social impacts of projects in developing countries despite of thorough impact assessment in appraisal phase of projects. A case study approach on a sewerage project in Barbados was undertaken using primary and secondary information. The study reveals that although the impact assessment report suggested appropriate mitigation measures, but they were not implemented by the contractors. The study suggests fostering an interconnected and symbiotic relationship between appraisal and implementation phases of a project in order to manage project environment. Additionally, a more vigilant and proactive supervisory role should be instituted and strengthened over time and adapted within the dictates of environmental needs. Copyright © 2005 Inderscience Enterprises Ltd.
Resumo:
This paper presents a framework based upon a relationship between environmental benefits and the investments and costs needed to implement and run company operations. As the results of environmental management become more evident it is proposed that the benefits rather than the environmental impacts are measured in the analysis of environmental performance. Four categories, or stages, are defined in this paper: “creative-green”, “expensive-green”, “inefficient-green or beginner”, and finally, the “complacent” stage. The paper describes the characteristics of each category and provides examples of indicators that could be used to measure environmental benefits. Qualitative and quantitative methods are necessary to classify companies according to the framework. It is believed that this paper can assist companies and public organisations to assess operations and projects considering their level of sustainability. The proposed framework can impact FDI and environmental policies in the public arena, and foster innovation on environmental practices within the private sector.
Resumo:
Environmentally conscious construction has received a significant amount of research attention during the last decades. Even though construction literature is rich in studies that emphasize the importance of environmental impact during the construction phase, most of the previous studies failed to combine environmental analysis with other project performance criteria in construction. This is mainly because most of the studies have overlooked the multi-objective nature of construction projects. In order to achieve environmentally conscious construction, multi-objectives and their relationships need to be successfully analyzed in the complex construction environment. The complex construction system is composed of changing project conditions that have an impact on the relationship between time, cost and environmental impact (TCEI) of construction operations. Yet, this impact is still unknown by construction professionals. Studying this impact is vital to fulfill multiple project objectives and achieve environmentally conscious construction. This research proposes an analytical framework to analyze the impact of changing project conditions on the relationship of TCEI. This study includes green house gas (GHG) emissions as an environmental impact category. The methodology utilizes multi-agent systems, multi-objective optimization, analytical network process, and system dynamics tools to study the relationships of TCEI and support decision-making under the influence of project conditions. Life cycle assessment (LCA) is applied to the evaluation of environmental impact in terms of GHG. The mixed method approach allowed for the collection and analysis of qualitative and quantitative data. Structured interviews of professionals in the highway construction field were conducted to gain their perspectives in decision-making under the influence of certain project conditions, while the quantitative data were collected from the Florida Department of Transportation (FDOT) for highway resurfacing projects. The data collected were used to test the framework. The framework yielded statistically significant results in simulating project conditions and optimizing TCEI. The results showed that the change in project conditions had a significant impact on the TCEI optimal solutions. The correlation between TCEI suggested that they affected each other positively, but in different strengths. The findings of the study will assist contractors to visualize the impact of their decision on the relationship of TCEI.
Resumo:
Construction projects are complex endeavors that require the involvement of different professional disciplines in order to meet various project objectives that are often conflicting. The level of complexity and the multi-objective nature of construction projects lend themselves to collaborative design and construction such as integrated project delivery (IPD), in which relevant disciplines work together during project conception, design and construction. Traditionally, the main objectives of construction projects have been to build in the least amount of time with the lowest cost possible, thus the inherent and well-established relationship between cost and time has been the focus of many studies. The importance of being able to effectively model relationships among multiple objectives in building construction has been emphasized in a wide range of research. In general, the trade-off relationship between time and cost is well understood and there is ample research on the subject. However, despite sustainable building designs, relationships between time and environmental impact, as well as cost and environmental impact, have not been fully investigated. The objectives of this research were mainly to analyze and identify relationships of time, cost, and environmental impact, in terms of CO2 emissions, at different levels of a building: material level, component level, and building level, at the pre-use phase, including manufacturing and construction, and the relationships of life cycle cost and life cycle CO2 emissions at the usage phase. Additionally, this research aimed to develop a robust simulation-based multi-objective decision-support tool, called SimulEICon, which took construction data uncertainty into account, and was capable of incorporating life cycle assessment information to the decision-making process. The findings of this research supported the trade-off relationship between time and cost at different building levels. Moreover, the time and CO2 emissions relationship presented trade-off behavior at the pre-use phase. The results of the relationship between cost and CO2 emissions were interestingly proportional at the pre-use phase. The same pattern continually presented after the construction to the usage phase. Understanding the relationships between those objectives is a key in successfully planning and designing environmentally sustainable construction projects.
Resumo:
According to the U.S. National Environmental Policy Act of 1969 (NEPA), federal action to manipulate habitat for species conservation requires an environmental impact statement, which should integrate natural, physical, economic, and social sciences in planning and decision making. Nonetheless, most impact assessments focus disproportionately on physical or ecological impacts rather than integrating ecological and socioeconomic components. We developed a participatory social-ecological impact assessment (SEIA) that addresses the requirements of NEPA and integrates social and ecological concepts for impact assessments. We cooperated with the Bureau of Land Management in Idaho, USA on a project designed to restore habitat for the Greater Sage-Grouse (Centrocercus urophasianus). We employed questionnaires, workshop dialogue, and participatory mapping exercises with stakeholders to identify potential environmental changes and subsequent impacts expected to result from the removal of western juniper (Juniperus occidentalis). Via questionnaires and workshop dialogue, stakeholders identified 46 environmental changes and associated positive or negative impacts to people and communities in Owyhee County, Idaho. Results of the participatory mapping exercises showed that the spatial distribution of social, economic, and ecological values throughout Owyhee County are highly associated with the two main watersheds, wilderness areas, and the historic town of Silver City. Altogether, the SEIA process revealed that perceptions of project scale varied among participants, highlighting the need for specificity about spatial and temporal scales. Overall, the SEIA generated substantial information concerning potential impacts associated with habitat treatments for Greater Sage-Grouse. The SEIA is transferable to other land management and conservation contexts because it supports holistic understanding and framing of connections between humans and ecosystems. By applying this SEIA framework, land managers and affected people have an opportunity to fulfill NEPA requirements and develop more comprehensive management plans that better reflect the linkages of social-ecological systems.
Resumo:
A procedure to evaluate mine rehabilitation practices during the operational phase was developed and validated. It is based on a comparison of actually observed or documented practices with internationally recommended best practices (BP). A set of 150 BP statements was derived from international guides in order to establish the benchmark. The statements are arranged in six rehabilitation programs under three categories: (1) planning (2) operational and (3) management, corresponding to the adoption of the plan-do-check-act management systems model to mine rehabilitation. The procedure consists of (i) performing technical inspections guided by a series of field forms containing BP statements; (ii) classifying evidences in five categories; and (iii) calculating conformity indexes and levels. For testing and calibration purposes, the procedure was applied to nine limestone quarries and conformity indexes were calculated for the rehabilitation programs in each quarry. Most quarries featured poor planning practices, operational practices reached high conformity levels in 50% of the cases and management practices scored moderate conformity. Despite all quarries being ISO 14001 certified, their management systems pay low attention to issues pertaining to land rehabilitation and biodiversity. The best results were achieved by a quarry whose expansion was recently submitted to the environmental impact assessment process, suggesting that public scrutiny may play a positive role in enhancing rehabilitation practices. Conformity indexes and levels can be used to chart the evolution of rehabilitation practices at regular intervals, to establish corporate goals and for communication with stakeholders. (C) 2010 Elsevier Ltd. All rights reserved.
Resumo:
Certification of an ISO 14001 Environmental Management System (EMS) is currently an important requirement for those enterprises wishing to sell their products in the context of a global market. The system`s structure is based on environmental impact evaluation (EIE). However, if an erroneous or inadequate methodology is applied, the entire process may be jeopardized. Many methodologies have been developed for making of EIEs, some of them are fairly complex and unsuitable for EMS implementation in an organizational context, principally when small and medium size enterprises (SMEs) are involved. The proposed methodology for EIE is part of a model for implementing EMS. The methodological approach used was a qualitative exploratory research method based upon sources of evidence such as document analyses, semi-structured interviews and participant observations. By adopting a cooperative implementation model based on the theory of system engineering, difficulties relating to implementation of the sub-system were overcome thus encouraging SMEs to implement EMS. (C) 2007 Elsevier Ltd. All rights reserved.