780 resultados para Driver fatigue risk management
Resumo:
‘Risk’ in social work is typically read as risk-of-bads, and specifically extreme bads. This paper develops the implications of the logical objection to attempts to predict low frequency extreme events (such as child homicides). Our argument is that if we focus on these low probability high cost outcomes—these heart wrenching, but unpredictable, tragedies—we take social work away from the good that it can do, leave it open to inappropriate disapprobation, and, in terms of outcomes, do less well by the vulnerable. This point is reinforced by discussion of developments in other academic fields, and by further examination of the logic (and the morality) of protection under uncertainty. We explore the implications for the way social work should be evaluated. A proper academic understanding of risk, and decision making under uncertainty, has, we argue clear practical implications.
Resumo:
Risk management in software engineering has become a recognized project management practice but it seems that not all companies are systematically applying it. At the same time, agile methods have become popular, partly because proponents claim that agile methods implicitly reduce risks due
to, for example, more frequent and earlier feedback, shorter periods of development time and easier prediction of cost. Therefore, there is a need to investigate how risk management can be usable in iterative and evolutionary software development processes. This paper investigates the gathering of empirical data on risk management from the project environment and presents
a novel approach to manage risk in agile projects. Our approach is based on a prototype tool, Agile Risk Tool (ART). This tool reduces human effort in risk management by using software agents to identify, assess and monitor risk, based on input and data collected from the project environment and by applying
some designated rules. As validation, groups of student project data were used to provide evidence of the efficacy of this approach. We demonstrate the approach and the feasibility of using a lightweight risk management tool to alert, assess and monitor risk with reduced human effort.
Resumo:
Lead (Pb) is a non-threshold toxin capable of inducing toxic effects at any blood level but availability of soil screening criteria for assessing potential health risks is limited. The oral bioaccessibility of Pb in 163 soil samples was attributed to sources through solubility estimation and domain identification. Samples were extracted following the Unified BARGE Method. Urban, mineralisation, peat and granite domains accounted for elevated Pb concentrations compared to rural samples. High Pb solubility explained moderate-high gastric (G) bioaccessible fractions throughout the study area. Higher maximum G concentrations were measured in urban (97.6 mg kg−1) and mineralisation (199.8 mg kg−1) domains. Higher average G concentrations occurred in mineralisation (36.4 mg kg−1) and granite (36.0 mg kg−1) domains. Findings suggest diffuse anthropogenic and widespread geogenic contamination could be capable of presenting health risks, having implications for land management decisions in jurisdictions where guidance advises these forms of pollution should not be regarded as contaminated land.
Resumo:
Intravenous sedation is a widely used pharmacological method of patient management commonly used in dental surgery for the treatment of anxious patients. Variety exists in fasting regimes between different centres offering dental sedation, with some advocating starvation in line with general anaesthesia protocols and others not enforcing starvation at all. The currently available guidelines on fasting protocols are ambiguous and open to interpretation partly because they are based on expert opinion rather than evidence-based research. This article reviews the available evidence on the subject of pre-operative fasting and discusses current guidelines.
Resumo:
This study presents findings from a series of interviews with Risk Managers and/or Chief Risk Officers from major Malaysian companies about the prerequisites for the effective implementation of Risk Management programmes. The interviews highlight the importance of a number of factors, including: a strong commitment from the Board of Directors and Management in general, a desire for an appropriate risk culture, the development of formal Risk Management frameworks and policies, a recognition of the importance of risk communication, the appointment of a Chief Risk Officer (CRO) and the development of a complementary system of internal audit.
Resumo:
The UK government introduced the Private Finance Initiative (PFI) and, latterly, the Local Improvement Finance Trust (LIFT) in an attempt to improve public service provision. As a variant of PFI, LIFT seeks to create a framework for the effective provision of primary care facilities. Like conventional PFI procurement, LIFT projects involve long-term contracts, complex multi-party interactions and thus create various risks to public sector clients. This paper investigates the advantages and disadvantages of LIFT with a focus on how this approach facilitates or impedes risk management from the public sector client perspective. Our paper concludes that LIFT has a potential for creating additional problems, including the further reduction of public sector control, conflicts of interest, the inappropriate use of enabling funds, and higher than market rental costs affecting the uptake of space in the buildings by local health care providers. However, there is also evidence that LIFT has facilitated new investment and that Primary Care Trusts (PCTs) have themselves started addressing some of the weaknesses of this procurement format through the bundling of projects and other forms of regional co-operation.
Resumo:
Enterprise Risk Management (ERM) is the discipline by which enterprises monitor, analyze, and control risks from across the enterprise, with the goal of identifying underlying correlations and thus optimizing the risk-taking behavior in a portfolio context. This study analyzes the valuation implications of ERM Maturity. We use data from the industry leading Risk and Insurance Management Society Risk Maturity Model over the period from 2006 to 2011, which scores firms on a five-point maturity scale. Our results suggest that firms that have reached mature levels of ERM are exhibiting a higher firm value, as measured by Tobin's Q. We find a statistically significant positive relation to the magnitude of 25 percent. Upon decomposition of the maturity score, we find that the most important aspects of ERM from a valuation perspective relate to the level of top–down executive engagement and the resultant cascade of ERM culture throughout the firm. Firms that have successfully integrated the ERM process into both their strategic activities and everyday practices display superior ability in uncovering risk dependencies and correlations across the entire enterprise and as a consequence enhanced value when undertaking the ERM maturity journey ceteris paribus.
Resumo:
This thesis consists of an introductory chapter (essay I) and five more empirical essays on electricity markets and CO2 spot price behaviour, derivatives pricing analysis and hedging. Essay I presents the structure of the thesis and electricity markets functioning and characteristics, as well as the type of products traded, to be analyzed on the following essays. In the second essay we conduct an empirical study on co-movements in electricity markets resorting to wavelet analysis, discussing long-term dynamics and markets integration. Essay three is about hedging performance and multiscale relationships in the German electricity spot and futures markets, also using wavelet analysis. We concentrate the investigation on the relationship between coherence evolution and hedge ratio analysis, on a time-frequency-scale approach, between spot and futures which conditions the effectiveness of the hedging strategy. Essays four, five and six are interrelated between them and with the other two previous essays given the nature of the commodity analyzed, CO2 emission allowances, traded in electricity markets. Relationships between electricity prices, primary energy fuel prices and carbon dioxide permits are analyzed on essay four. The efficiency of the European market for allowances is examined taking into account markets heterogeneity. Essay five analyzes stylized statistical properties of the recent traded asset CO2 emission allowances, for spot and futures returns, examining also the relation linking convenience yield and risk premium, for the German European Energy Exchange (EEX) between October 2005 and October 2009. The study was conducted through empirical estimations of CO2 allowances risk premium, convenience yield, and their relation. Future prices from an ex-post perspective are examined to show evidence for significant negative risk premium, or else a positive forward premium. Finally, essay six analyzes emission allowances futures hedging effectiveness, providing evidence for utility gains increases with investor’s preference over risk. Deregulation of electricity markets has led to higher uncertainty in electricity prices and by presenting these essays we try to shed new lights about structuring, pricing and hedging in this type of markets.
Resumo:
Long-term contractual decisions are the basis of an efficient risk management. However those types of decisions have to be supported with a robust price forecast methodology. This paper reports a different approach for long-term price forecast which tries to give answers to that need. Making use of regression models, the proposed methodology has as main objective to find the maximum and a minimum Market Clearing Price (MCP) for a specific programming period, and with a desired confidence level α. Due to the problem complexity, the meta-heuristic Particle Swarm Optimization (PSO) was used to find the best regression parameters and the results compared with the obtained by using a Genetic Algorithm (GA). To validate these models, results from realistic data are presented and discussed in detail.
Resumo:
Short-term risk management is highly dependent on long-term contractual decisions previously established; risk aversion factor of the agent and short-term price forecast accuracy. Trying to give answers to that problem, this paper provides a different approach for short-term risk management on electricity markets. Based on long-term contractual decisions and making use of a price range forecast method developed by the authors, the short-term risk management tool presented here has as main concern to find the optimal spot market strategies that a producer should have for a specific day in function of his risk aversion factor, with the objective to maximize the profits and simultaneously to practice the hedge against price market volatility. Due to the complexity of the optimization problem, the authors make use of Particle Swarm Optimization (PSO) to find the optimal solution. Results from realistic data, namely from OMEL electricity market, are presented and discussed in detail.