948 resultados para Dairy Barns for Nebraska
Resumo:
We explore and investigate Japanese dairy markets. We first provide an overview of consumer demand and how it evolved after World War II. Using historical data and econometric estimates of Japanese dairy demand, we identify economic, cultural, and demographic forces that have been shaping consumption patterns. Then we summarize the characteristics of Japanese milk production and dairy processing and policies affecting them. We next describe the import regime and trade flows in dairy products. The analysis of the regulatory system of the dairy sector shows how its incentive structure affects the long-term prospects of various segments of the industry. The paper concludes with policy recommendations of how to reform the Japanese dairy sector.
Resumo:
This paper is an overview of important findings regarding the ongoing evolution of Asian dairy markets based on a series of new economic investigations. These investigations provide systematic empirical foundations for assessing Asian dairy markets with their new consumption patterns, changing industries, and trade prospects under different domestic and trade policy regimes. The findings are drawn from four case studies (China, India, Japan, and Korea), as well as a prospective analysis of future regional patterns of consumption and a policy analysis of trade liberalization of Asian dairy markets. The overview distills the findings of these new investigations and integrates them in the earlier economic literature; it draws policy implications and identifies lessons for countries outside of Asia, especially for emerging exporters in Latin America.
Resumo:
We assess the international competitiveness of the dairy industries in Argentina and Chile, combining recent market intelligence gathered from field visits with quantitative simulations of global policy reform scenarios. Both countries exhibit strong potential for export growth but face significant internal and external barriers to expanding their dairy industries. Global policy reforms would resolve some of the international obstacles to their expansion. Argentina has great potential, but it is handicapped by its current macroeconomic policies, trade policy distortions, and the uncertainty associated with policy implementation. Chile is more limited in terms of natural capacity for expansion, but it has a positive trade and investment environment.
Resumo:
In 2001, extensive archaeological excavations were conducted at the Oneida Cheese Factory in Jones County. The county is a microcosm of larger dairying trends found throughout northeast Iowa, the state’s premier dairy-producing region. Jones County moved from homemade cheese and butter production by farm women, to the industrialization of the dairy farm and opening of cheese factories and butter creameries. A number of innovations affected the industry around the turn-of-the-twentieth century, including reliable butterfat testing, the introduction of ensilage (silos) that created yearround milk production, and consolidation of the many local creameries into larger creamery organizations, such as the Diamond Creamery run by Henry D. Sherman of Jones County. Iowa’s dairy industry of today looks very different from its heritage: consolidation and competition have drastically reduced the number of cows, dairy farms, and processing plants. In recent years, northeast Iowa has become the center of a movement to revitalize Iowa’s dairy industry, particularly through the use of value-added strategies, such as niche markets and large regional co-operatives: the lessons from Iowa’s dairying legacy are resurfacing as a solution to modern agricultural challenges.
Resumo:
Selostus: Rypsipuristeen asteittainen korvaaminen pellavapuristeella lypsylehmien säilörehuun perustuvassa ruokinnassa
Resumo:
Selostus: Mahdollisuus lyhytaikaisen virtsankeruun käyttöön lypsylehmien virtsan pseudouridiinin erityksen määrittämisessä
Resumo:
Selostus: Säilörehun käymisasteen ja valkuaistäydennyksen vaikutus maidon tuotantoon
Resumo:
Selostus: Perinnöllinen edistyminen suomalaisessa lypsykarjan jalostusohjelmassa
Resumo:
The application of organic wastes to agricultural soils is not risk-free and can affect soil invertebrates. Ecotoxicological tests based on the behavioral avoidance of earthworms and springtails were performed to evaluate effects of different fertilization strategies on soil quality and habitat function for soil organisms. These tests were performed in soils treated with: i) slurry and chemical fertilizers, according to the conventional fertilization management of the region, ii) conventional fertilization + sludge and iii) unfertilized reference soil. Both fertilization strategies contributed to soil acidity mitigation and caused no increase in soil heavy metal content. Avoidance test results showed no negative effects of these strategies on soil organisms, compared with the reference soil. However, results of the two fertilization managements differed: Springtails did not avoid soils fertilized with dairy sludge in any of the tested combinations. Earthworms avoided soils treated with sludge as of May 2004 (DS1), when compared with conventional fertilization. Possibly, the behavioral avoidance of earthworms is more sensitive to soil properties (other than texture, organic matter and heavy metal content) than springtails
Resumo:
Selostus: Ravintoaineiden saantiin ja maidontuotantoon vaikuttavat tekijät runsaalla säilörehuruokinnalla
Resumo:
Selostus: Ohran ja rypsirouheen fysikaalisen käsittelyn vaikutus maidontuotantoon säilörehuun perustuvalla ruokinnalla
Resumo:
The Iowa Department of Transportation (Iowa DOT), Nebraska Department of Roads (NDOR), and the Federal Highway Administration (FHWA) are proposing to improve the interstate system around Council Bluffs with improvements extending across the Missouri River on I-80 to east of the I-480 interchange in Omaha, Nebraska, see Figure 1-1. The study considers long-term, broad-based transportation improvements along I-80, I-29, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system1, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. These improvements, once implemented, would bring the segments of I-80 and I-29 up to current engineering standards and modernize the roadway to accommodate future traffic needs. In 2001, Iowa DOT and FHWA initiated the Council Bluffs Interstate System (CBIS) Improvements Project. The agencies concluded that the environmental study process would be conducted in two stages; that is, a tiered approach would be applied. The project is being conducted pursuant to the National Environmental Policy Act (NEPA) regulations issued by the Council on Environmental Quality (CEQ), 40 Code of Federal Regulations (CFR) Part 1502.20, and FHWA 23 CFR Part 771.111, that permit tiering for large, complex NEPA studies. Tier 1 is an examination of the overall interstate system improvement needs, including a clear explanation of the area’s transportation needs, a study of alternatives to satisfy them, and broad consideration of potential environmental and social impacts. The Tier 1 evaluation is at a sufficient level of engineering and environmental detail to assist decision makers in selecting a preferred transportation strategy. Tier 1 includes preparation of a draft and final Environmental Impact Statement (EIS) that would disclose the potential environmental and social effects (evaluated at a planning level that considers a variety of conceptual designs) of the proposed improvements. The final EIS will conclude with a Record of Decision (ROD) that states the preferred plan for improvements to be implemented. Essentially, the Tier 1 document will establish the planning framework for the needed improvements. Because the scope of the overall system improvements is large, the interstate improvements would be implemented as a series of individual projects that fit into the overall planning framework. The Tier 1 Area of Potential Impact, which is discussed in detail in Section 4 is an alternative that considers a combination of the most reasonable concepts that have been developed, buffered by approximately 100 or more feet to ensure that any Tier 2 design modifications would remain inside the outer boundary.
Resumo:
The Federal Highway Administration (FHWA) approves the selection of the Reconstruction of All or Part of the Interstate (Construction Alternative) as the Preferred Alternative to provide improvements to the interstate system in the Omaha/Council Bluffs metropolitan area, extending across the Missouri River on Interstate 80 to east of the Interstate 480 interchange in Omaha, Nebraska. The study considered long-term, broad-based transportation improvements along Interstate I-29 (I-29), I-80, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. FHWA also approves the decisions to provide full access between West Broadway and I-29, design the I-80/I-29 overlap section as a dual-divided freeway, and locating the new I-80 Missouri River Bridge north of the existing bridge. Improvements to the interstate system, once implemented, would bring the segments of I-80 and I-29 (see Figure 1) up to current engineering standards and accommodate future traffic needs. This Record of Decision (ROD) concludes Tier 1 of the Council Bluffs Interstate System (CBIS) Improvements Project. Tier 1 included an examination of the area’s transportation needs, a study of alternatives to satisfy them, and broad consideration of potential environmental and social impacts. The Tier 1 evaluation consisted of a sufficient level of engineering and environmental detail to assist decision makers in selecting a preferred transportation strategy. During Tier 1 a Draft EIS (FHWA-IA- EIS-04-01D) was developed which was approved by FHWA, Iowa DOT, and Nebraska Department of Roads (NDOR) in November 2004 with comments accepted through March 15, 2005. The Draft EIS summarized the alternatives that were considered to address the transportation needs around Council Bluffs; identified reconstruction of all or part of the interstate, the “Construction Alternative,” as the Preferred Alternative; identified three system-level decisions that needed to be made at the Tier 1 level; and invited comment on the issues. The Final EIS (FHWA-IA- EIS-04-01F) further documented the Construction Alternative as the Preferred Alternative and identified the recommended decisions for the three system level decisions that needed to be made in Tier 1. This ROD defines the Selected Alternative determined in the Tier 1 studies.
Resumo:
The Iowa Department of Transportation (Iowa DOT), Nebraska Department of Roads (NDOR), and the Federal Highway Administration (FHWA) are proposing improvements to the interstate system in the Omaha/Council Bluffs metropolitan area, extending across the Missouri River on Interstate 80 (I-80) to east of the Interstate 480 (I-480) interchange in Omaha, Nebraska (see Figure 1-1). The study considers long-term, broad-base transportation improvements along Interstate I-29 (I-29), I-80, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system1, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. These improvements, once implemented, would bring the segments of I-80 and I-29 up to current engineering standards and modernize the roadway to accommodate future traffic needs.
Resumo:
The Iowa Department of Transportation (Iowa DOT), Nebraska Department of Roads (NDOR), and the Federal Highway Administration (FHWA) are proposing improvements to the interstate system in the Omaha/Council Bluffs metropolitan area, extending across the Missouri River on Interstate 80 (I-80) to east of the Interstate 480 (I-480) interchange in Omaha, Nebraska (see Figure 1-1). The study considers long-term, broad-base transportation improvements along Interstate I-29 (I-29), I-80, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system1, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. These improvements, once implemented, would bring the segments of I-80 and I-29 up to current engineering standards and modernize the roadway to accommodate future traffic needs.