878 resultados para Control performance
Resumo:
Carbon isotope ratio of androgens in urine specimens is routinely determined to exclude an abuse of testosterone or testosterone prohormones by athletes. Increasing application of gas chromatography/combustion/isotope ratio mass spectrometry (GC/C/IRMS) in the last years for target and systematic investigations on samples has resulted in the demand for rapid sample throughput as well as high selectivity in the extraction process particularly in the case of conspicuous samples. For that purpose, we present herein the complimentary use of an SPE-based assay and an HPLC fractionation method as a two-stage strategy for the isolation of testosterone metabolites and endogenous reference compounds prior to GC/C/IRMS analyses. Assays validation demonstrated acceptable performance in terms of intermediate precision (range: 0.1-0.4 per thousand) and Bland-Altman analyses revealed no significant bias (0.2 per thousand). For further validation of this two-stage analyses strategy, all the specimens (n=124) collected during a major sport event were processed.
Resumo:
Annual Report, Agency Performance Plan
Resumo:
Agency Performance Report
Resumo:
Agency Performance Report
Resumo:
The Agency Performance Report for the Governor’s Office of Drug Control Policy is published in accordance with the Accountable Government Act. The information provided within this report is to aid in decision-making and to illustrate accountability to stakeholders and citizens. The report is indicative of the agency’s progress in meeting performance targets and achieving goals consistent with the enterprise strategic plan, the agency strategic plan and agency performance plan.
Resumo:
The Agency Performance Report for the Governor’s Office of Drug Control Policy is published in accordance with the Accountable Government Act. The information provided within this report is to aid in decision-making and to illustrate accountability to stakeholders and citizens. The report is indicative of the agency’s progress in meeting performance targets and achieving goals consistent with the enterprise strategic plan, the agency strategic plan and agency performance plan.
Resumo:
Agency Performance Plan, Governor’s Office of Drug Control Policy
Resumo:
Background: Quality control procedures vary considerably among the providers of equipment for home mechanical ventilation (HMV). Methods: A multicentre quality control survey of HMV was performed at the home of 300 patients included in the HMV programmes of four hospitals in Barcelona. It consisted of three steps: (1) the prescribed ventilation settings, the actual settings in the ventilator control panel, and the actual performance of the ventilator measured at home were compared; (2) the different ventilator alarms were tested; and (3) the effect of differences between the prescribed settings and the actual performance of the ventilator on non-programmed readmissions of the patient was determined. Results: Considerable differences were found between actual, set, and prescribed values of ventilator variables; these differences were similar in volume and pressure preset ventilators. The percentage of patients with a discrepancy between the prescribed and actual measured main ventilator variable (minute ventilation or inspiratory pressure) of more than 20% and 30% was 13% and 4%, respectively. The number of ventilators with built in alarms for power off, disconnection, or obstruction was 225, 280 and 157, respectively. These alarms did not work in two (0.9%), 52 (18.6%) and eight (5.1%) ventilators, respectively. The number of non-programmed hospital readmissions in the year before the study did not correlate with the index of ventilator error. Conclusions: This study illustrates the current limitations of the quality control of HMV and suggests that improvements should be made to ensure adequate ventilator settings and correct ventilator performance and ventilator alarm operation.
Resumo:
Agency Performance Plan, Governor’s Office of Drug Control Policy
Resumo:
Agency Performance Plan, Governor’s Office of Drug Control Policy
Resumo:
The Agency Performance Report for the Governor’s Office of Drug Control Policy is published in accordance with the Accountable Government Act. The information provided within this report is to aid in decision-making and to illustrate accountability to stakeholders and citizens. The report is indicative of the agency’s progress in meeting performance targets and achieving goals consistent with the enterprise strategic plan, the agency strategic plan and agency performance plan.
Resumo:
Agency Performance Plan
Resumo:
Agency Performance Report
Resumo:
Agency Performance Report
Resumo:
Agency Performance Report