362 resultados para Contractor


Relevância:

10.00% 10.00%

Publicador:

Resumo:

It is recognized that, in general, the performance of construction projects does not meet optimal expectations. One aspect of this is the performance of each participant, which is interdependent and makes a significance impact on overall project outcomes. Of these, the client is traditionally the owner of the project, the architect or engineer is engaged as the lead designer and a contractor is selected to construct the facilities. Generally, the performance of the participants is gauged by considering three main factors, namely time, cost and quality. As the level of satisfaction is a subjective measurement, it is rarely used in the performance evaluation of construction work. Recently, various approaches to the measurement of satisfaction have been made in attempting to determine the performance of construction project outcomes – for instance client satisfaction, consultant satisfaction, contractor satisfaction, customer satisfaction and home buyer satisfaction. These not only identify the performance of the construction project, but are also used to improve and maintain relationships. In addition, these assessments are necessary for continuous improvement and enhanced cooperation between participants. The measurement of satisfaction levels primarily involves expectations and perceptions. An expectation can be regarded as a comparison standard of different needs, motives and beliefs, while a perception is a subjective interpretation that is influenced by moods, experiences and values. This suggests that the disparity between perceptions and expectations may be used to represent different levels of satisfaction. However, this concept is rather new and in need of further investigation. This paper examines the current methods commonly practiced in measuring satisfaction level and the advantages of promoting these methods. The results provided are a preliminary review of the advantages of satisfaction measurement in the construction industry and recommendations are made concerning the most appropriate methods for use in identifying the performance of project outcomes.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The outcomes of the construction projects can be evaluated in numerous ways. One method is to measure the satisfaction of participants as represented by the differences between their expectations and perceptions. This measurement is used widely in construction as it promises benefits, such as the improvement of product delivery, and enhances services quality by identifying some necessary changes. Commonly satisfaction measurement is gauged by evaluating the level of client satisfaction of construction performance. The measurement of customer satisfaction on the other hand, is based on the quality of the end product. This evaluation is used to encourage contractors to improve their performance to a required level and to ensure that the projects are delivered as expected- in terms of time, budget and quality. Several studies of performance measurement have indicated that contractor performance is still not satisfactory, as the outcome delivered is not as required (because of cost overruns, time overruns or because it is generally unsatisfactory). This drawback may be due to the contractors’ lack of expertise, motivation and/or satisfaction. The measurement of performance based on contractor satisfaction levels is still new and very few studies have yet taken place in the construction industry. This paper examines how the characteristics of a contracting organisation – namely its experience in the industry, background, past performance, size of organisation and financial stability- may influence its satisfaction levels with regards to project performance. Previous literature reviews and interviews are used as research tools in the preliminary investigation. The outcome is expected to present a basic understanding of contractor satisfaction measurement and its potential for improving the performance of project outcomes.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Project Procurement is a ‘great’ environment for ethical issues with its low-price state of mind and competition. It has many opportunities that could contribute to illegal activities or unethical behavior especially in the construction industry. In 2006 alone, 17.3% of 417 Malaysian government contract projects were considered sick due to the poor performance by the contractors. Therefore it is important to govern the project procurement, especially the plan procurement stage to ensure the accountability and transparency of the decision made in awarding the right contract to the best contractor. This is where project governance framework (PGF) is really needed in project procurement planning. Project governance is a subset of corporate governance focusing on the areas of corporate governance related to project activities, including: portfolio direction, project sponsorship, project and program management and efficiency and disclosure and reporting. This paper highlights the importance of implementing project governance framework (PGF) to ensure that the decision makers are answerable and accountable to the stakeholders, and the decision making is transparent to avoid any ethical issues arises. A comprehensive preliminary literature is carried out to discover the importance of executing PGF in project procurement in Malaysian public sector. By understanding the important of PGF, it is hoped that this will bring a signal to other developing countries to implement the similar method in ensuring the transparency of the decision making in project procurement planning in their countries.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Motivation is a major driver of project performance. Despite team member ability to deliver successful project outcomes if they are not positively motivated to pursue joint project goals, then performance will be constrained. One approach to improving the motivation of project organizations is by offering a financial reward for the achievement of set performance standards above a minimum required level. However, little investigation has been undertaken into the features of successful incentive systems as a part of an overall delivery strategy. With input from organizational management literature, and drawing on the literature covering psychological and economic theories of motivation, this paper presents an integrated framework that can be used by project organizations to assess the impact of financial reward systems on motivation in construction projects. The integrated framework offers four motivation indicators which reflect key theoretical concepts across both psychological and economic disciplines. The indicators are: (1) Goal Commitment, (2) Distributive Justice, (3) Procedural Justice, and (4) Reciprocity. The paper also interprets the integrated framework against the results of a successful Australian social infrastructure project case study and identifies key learning’s for project organizations to consider when designing financial reward systems. Case study results suggest that motivation directed towards the achievement of incentive goals is influenced not only by the value placed on the financial reward for commercial benefit, but also driven by the strength of the project initiatives that encourage just and fair dealings, supporting the establishment of trust and positive reciprocal behavior across a project team. The strength of the project relationships was found to be influenced by how attractive the achievement of the goal is to the incentive recipient and how likely they were to push for the achievement of the goal. Interestingly, findings also suggested that contractor motivation is also influenced by the fairness of the performance measurement process and their perception of the trustworthiness and transparency of their client. These findings provide the basis for future research on the impact of financial reward systems on motivation in construction projects. It is anticipated that such research will shed new light on this complex topic and further define how reward systems should be designed to promote project team motivation. Due to the unique nature of construction projects with high levels of task complexity and interdependence, results are expected to vary in comparison to previous studies based on individuals or single-entity organizations.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Office building retrofit projects face many challenges for on-site waste management. While the projects themselves have the potential for a significant level of reuse and recycling from decon-struction and demolition, their unique characteristics often prohibit direct application of existing waste management systems, which are typically based on managing waste generated through new material application in new build projects. Moreover, current waste management plans include no stimuli to involve Small and Medium Enterprises (SMEs) for on-site waste management. As SMEs carry out the majority of on-site work as subcontractors, their active involvements will result in more proactive approaches to waste management and enhance project delivery. This paper discusses the interim results of a continuing research aimed at engaging SMEs in the planning processes of waste management through the collaboration between subcontractors and main contractors of retrofitting projects. It introduces a conceptual model for SMEs to proactively plan and manage on-site waste generation for both deconstruction and construction stages, before traditional waste management plans by the main contractor come into place. The model also suggests a collaboration process between SMEs as subcontractors and large companies as the main contractor to improve the involvement and performance of SMEs in waste management of office building retrofit projects.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Many studies into construction procurement methods reveal evidence of a need to change the culture and attitude in the construction industry, transition from traditional adversarial relationships to cooperative and collaborative relationships. At the same time there is also increasing concern and discussion on alternative procurement methods, involving a movement away from traditional procurement systems. Relational contracting approaches, such as partnering and relationship management, are business strategies that align the objectives of clients, commercial participants and stakeholders. It provides a collaborative environment and a framework for all participants to adapt their behaviour to project objectives and allows for engagement of those subcontractors and suppliers down the supply chain. The efficacy of relationship management in the client and contractor groups is proven and well documented. However, the industry has a history of slow implementation of relational contracting down the supply chain. Furthermore, there exists little research on relationship management conducted in the supply chain context. This research aims to explore the association between relational contracting structures and processes and supply chain sustainability in the civil engineering construction industry. It endeavours to shed light on the practices and prerequisites for relationship management implementation success and for supply sustainability to develop. The research methodology is a triangulated approach based on Cheung.s (2006) earlier research where questionnaire survey, interviews and case studies were conducted. This new research includes a face-to-face questionnaire survey that was carried out with 100 professionals from 27 contracting organisations in Queensland from June 2008 to January 2009. A follow-up survey sub-questionnaire, further examining project participants. perspectives was sent to another group of professionals (as identified in the main questionnaire survey). Statistical analysis including multiple regression, correlation, principal component factor analysis and analysis of variance were used to identify the underlying dimensions and test the relationships among variables. Interviews and case studies were conducted to assist in providing a deeper understanding as well as explaining findings of the quantitative study. The qualitative approaches also gave the opportunity to critique and validate the research findings. This research presents the implementation of relationship management from the contractor.s perspective. Findings show that the adaption of relational contracting approach in the supply chain is found to be limited; contractors still prefer to keep the suppliers and subcontractors at arm.s length. This research shows that the degree of match and mismatch between organisational structuring and organisational process has an impact on staff.s commitment level and performance effectiveness. Key issues affecting performance effectiveness and relationship effectiveness include total influence between parties, access to information, personal acquaintance, communication process, risk identification, timely problem solving and commercial framework. Findings also indicate that alliance and Early Contractor Involvement (ECI) projects achieve higher performance effectiveness at both short-term and long-term levels compared to projects with either no or partial relationship management adopted.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Request For Proposal (RFP) with the design‐build (DB) procurement arrangement is a document in which an owner develops his requirements and conveys the project scope to DB contractors. Owners should provide an appropriate level of design in DB RFPs to adequately describe their requirements without compromising the prospects for innovation. This paper examines and compares the different levels of owner‐provided design in DB RFPs by the content analysis of 84 requests for RFPs for public DB projects advertised between 2000 and 2010 with an aggregate contract value of over $5.4 billion. A statistical analysis was also conducted in order to explore the relationship between the proportion of owner‐provided design and other project information, including project type, advertisement time, project size, contractor selection method, procurement process and contract type. The results show that the majority (64.8%) of the RFPs provide less than 10% of the owner‐provided design. The owner‐provided design proportion has a significant association with project type, project size, contractor selection method and contract type. In addition, owners are generally providing less design in recent years than hitherto. The research findings also provide owners with perspectives to determine the appropriate level of owner‐provided design in DB RFPs.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In an attempt to enhance the efficiency, productivity and competitiveness of today’s Architectural, Engineering, and Contractor (AEC) industry, this paper summarises the current status of an ongoing PhD research investigation in developing a sustainable AEC industry specific best-practice ‘Innovation-driven Change Framework’—more specifically a summation of the ‘fourth interrelated dynamic’ (culture). Leveraging off the outcomes of a two year industry and government supported Cooperative Research Centre for Construction Innovation (CRCCI) research project, as well as referring to recent internationally renowned case studies and related literature investigations, this research investigation includes further identifying, processing, analysing and categorizing various culture change methods, models, frameworks and processes utilized within the AEC and other industry sectors, and incorporating these findings in developing an AEC industry-specific ‘Innovation-driven Change Framework’

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Design-Build (DB) system has been widely adopted overseas but it has not received the same popularity yet in the People’s Republic of China. The selection of design-build variant is regarded as one of the critical obstacles to the application of this alternative. This paper investigates categories of design-build variants in the construction market of China. The develop-and-construction, enhanced design-build, traditional-design-build and engineering procurement-construction (EPC) are the four current designbuild variants adopted by clients. Each of them is developed to meet a varying set of circumstances and has its own advantages and disadvantages. The develop-and-construction is mostly used in large, complex projects in housing industry and it will guarantee client’s great control over the project while still leave some design room for the contractor. The traditional-design-build and enhanced-design-build systems are mostly applied in projects that are comparatively simple, small-scale, and the DB contractors will have greater control of the projects. The EPC is the extension of pure design-build method and is widely adopted in the petrochemical, metallurgical and electronic fields because of the high-technique requirements and the necessity for one entity to control the design, construction, procurement and commissioning etc. Four corresponding design-build projects are also presented in this paper in order to better illustrate the operational process and provide the insight for understanding the design-build variants in Mainland China.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Public road authorities have a key responsibility in driving initiatives for reducing greenhouse gas (GHG) emissions in the road construction project lifecycle. A coherent and efficient chain of procurement processes and methods is needed to convert green policies into tangible actions that capture the potential for GHG reduction. Yet, many infrastructure clients lack developed methodologies regarding green procurement practices. Designing more efficient solutions for green procurement requires an evaluation of the current initiatives and stages of development. A mapping of the current GHG reduction initiatives in Australian public road procurement is presented in this paper. The study includes the five largest Australian state road authorities, which cover 94% of the total 817,089 km of Australian main roads (not local) and account for 96% of the total A$13 billion annual major road construction and maintenance expenditure. The state road authorities’ green procurement processes and tools are evaluated based on interviews and a review of documents. Altogether 12 people, comprising 1-3 people of each organisation, participated in the interviews and provided documents. An evaluation matrix was developed for mapping the findings across the lifecycle of road construction project delivery. The results show how Australian state road authorities drive decisions with an impact on GHG emissions on the strategic planning phase, project development phase, and project implementation phase. The road authorities demonstrate varying levels of advancement in their green procurement methodologies. Six major gaps in the current green procurement processes are identified and, respectively, six recommendations for future research and development are suggested. The greatest gaps remain in the project development phase, which has a critical role in fixing the project (GHG reduction) goals, identifying risks and opportunities, and selecting the contractor to deliver the project. Specifically, the role of mass-haul optimisation as a part of GHG minimisation was reviewed, and mass-haul management was found to be an underutilised element with GHG reduction potential.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Clients and Design-build (DB) contractors are two key stakeholders in DB projects, and contribute significantly to the successful project performance. This study aims to identify and compare such key competences in the construction market of the PRC. After the survey of available literature and face-to-face interviews, a two-round Delphi questionnaire survey was conducted to identify the key competences of clients and DB contractors in DB projects. Relative importance of these identified competences were ranked and compared. The questionnaire results indicated distinct differences between the key competences of clients and that of contractors. The contractor’s key competences emphasize on DB experience, corporate management capability, building and design expertise, financial capability, enterprise qualification and reputation. While the client’s competences focus on the ability to clearly define the project scope & requirements, financial capacity, contract management ability, adequate staff, effective coordination with DB contractor and similar DB experience. Both clients and DB contractors should clearly understand the competence requirements in DB projects and possess all the necessary competences for the successful outcome of DB projects. The identification of these key competences provides clients and DB contractors with indicators to assess their capabilities before going for the DB option. Furthermore, the comparison of competences for clients and DB contractors will result in better understanding of DB system and improve the communication between these stakeholders.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In response to the need to leverage private finance and the lack of competition in some parts of the Australian public sector infrastructure market, the Australian Federal government has demonstrated its desire to attract new sources of in-bound foreign direct investment (FDI) by multinational contractors. This study aims to update progress towards an investigation into the determinants of multinational contractors’ willingness to bid for Australian public sector major road and bridges. This research deploys Dunning’s eclectic theory for the first time in terms of in-bound FDI by multinational contractors into Australia. Elsewhere, the authors have developed Dunning’s principal hypothesis to suit the context of this research and to address a weakness arising in this hypothesis that is based on a nominal (yes or no) approach to the ownership, location and internalisation factors in Dunning's eclectic framework and which fails to speak to the relative explanatory power of these factors. The authors have completed a first stage test of this development of Dunning's hypothesis based on publically available secondary data, in which it was concluded tentatively that the location factor appears to have the greatest explanatory power. This paper aims to present, for the first time, a further and novel development of the operation of Dunning's eclectic paradigm within the context of multinational contracting, as well as a preview of the design and planned analysis of the next empirical stage in this research concerning case studies. Finally, and beyond the theoretical contributions expected, other expected contributions are mentioned concerning research method and practical implications.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The exploratory research presented in this discussion paper was undertaken as input to a major research grant application for the Australian Research Council. The research looks at the contribution of the Australian built environment to meet social and environmental needs. The paper examines the following research questions: What are the main challenges facing the Australian built environment? What types of building innovations might address those challenges? The research questions were addressed through desk-top research, involving an international review of (1) relevant academic literature in top-tier construction management and general management journals, and (2) high profile industry reports published internationally. Future research will involve assessing the diffusion of the identified building innovations and gauging their impact on social and environmental goals.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

As the Indonesian construction industry is now promising to become the engine of national economic development, achieving quality and higher performance, not only domestically but also in the international market, are becoming crucial issues. Implementing quality management systems (QMSs) based on ISO 9001 are important in helping Indonesian construction companies become more competitive, for it is acknowledged that quality in construction is a major concern in the global construction industry. However, the possession of ISO 9001 certification does not reflect the presence of a well-operated QMS, which is capable of giving customer and project end-users satisfaction. The review of literature found that there is a significant correlation between a company.s organisational culture and the quality performance of contractors. While research into this area has involved many researchers, there is no critical mass of information specifically related to the Indonesian situation. Studies based on contemporary perspectives of the characteristics of the Indonesian construction organisational culture using Cameron and Quinn.s Organizational Culture Assessment Instrument (OCAI) and its relationship with the contractor.s ISO 9001 practices, have not been previously undertaken. This thesis research, therefore, investigated the culture profiles in Indonesian construction organisations, together with the current implementation of ISO 9001 and their performance during implementing QMSs, as information in these areas has a bearing on the poor performance and low levels of competitiveness of Indonesian construction companies. Questionnaire surveys were distributed to selected representative grade 7 civil engineering contractors located in the two provincial capitals of Makassar and Manado, and the national capital, Jakarta, in order to collect responses designed to examine the effectiveness of their QMSs implementation. The survey also aimed to identify current problems within the systems, and examine the performance of companies while implementing their QMSs. The questionnaire contained questions to assess the organisational culture profiles of Indonesian construction companies, adopting the OCAI. The survey results were then used to analyse the influence of different organisational culture profiles on QMSs implementation among respondent companies. The results from the questionnaire survey supported the development of a Culture-based Quality Management System Improvement Implementation Framework, designed to help Indonesian construction companies identify some typical barriers associated with impacting on effective QMSs implementation; to assist them to develop cultural values that can drive effective QMSs implementation; to undertake effective QMSs practices; and to recognise the potential results and longer-term benefits obtainable from implementing effective QMSs. A Focus Group Discussion was conducted with the assistance of a panel of professional construction practitioners, policy makers and academic experts, which further considered and validated the usefulness and applicability of the framework. Based on the outcome from this discussion and on the results of the earlier data analysis, a final version of the framework was developed to assist Indonesian construction companies in improving their capability of construction project delivery, and thereby contribute to providing or improving the competitive advantage of Indonesian construction companies in the local, national and global construction market.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Teachers of construction economics and estimating have for a long time recognised that there is more to construction pricing than detailed calculation of costs (to the contractor). We always get to the point where we have to say "of course, experience or familiarity of the market is very important and this needs judgement, intuition, etc". Quite how important is the matter in construction pricing is not known and we tend to trivialise its effect. If judgement of the market has a minimal effect, little harm would be done, but if it is really important then some quite serious consequences arise which go well beyond the teaching environment. Major areas of concern for the quantity surveyor are in cost modelling and cost planning - neither of which pay any significant attention to the market effect. There are currently two schools of thought about the market effect issue. The first school is prepared to ignore possible effects until more is known. This may be called the pragmatic school. The second school exists solely to criticise the first school. We will call this the antagonistic school. Neither the pragmatic nor the antagonistic schools seem to be particularly keen to resolve the issue one way or the other. The founder and leader of the antagonistic school is Brian Fine whose paper in 1974 is still the basic text on the subject, and in which he coined the term 'socially acceptable' price to describe what we now recognise as the market effect. Mr Fine's argument was then, and is since, that the uncertainty surrounding the contractors' costing and cost estimating process is such that the uncertainty surrounding the contractors' cost that it logically leads to a market-orientated pricing approach. Very little factual evidence, however, seems to be available to support these arguments in any conclusive manner. A further, and more important point for the pragmatic school, is that, even if the market effect is as important as Mr Fine believes, there are no indications of how it can be measured, evaluated or predicted. Since 1974 evidence has been accumulating which tends to reinforce the antagonists' view. A review of the literature covering both contractors' and designers' estimates found many references to the use of value judgements in construction pricing (Ashworth & Skitmore, 1985), which supports the antagonistic view in implying the existence of uncertainty overload. The most convincing evidence emerged quite by accident in some research we recently completed with practicing quantity surveyors in estimating accuracy (Skitmore, 1985). In addition to demonstrating that individual quantity surveyors and certain types of buildings had significant effect on estimating accuracy, one surprise result was that only a very small amount of information was used by the most expert surveyors for relatively very accurate estimates. Only the type and size of building, it seemed, was really relevant in determining accuracy. More detailed information about the buildings' specification, and even a sight to the drawings, did not significantly improve their accuracy level. This seemed to offer clear evidence that the constructional aspects of the project were largely irrelevant and that the expert surveyors were somehow tuning in to the market price of the building. The obvious next step is to feed our expert surveyors with more relevant 'market' information in order to assess its effect. The problem with this is that our experts do not seem able to verbalise their requirements in this respect - a common occurrence in research of this nature. The lack of research into the nature of market effects on prices also means the literature provides little of benefit. Hence the need for this study. It was felt that a clearer picture of the nature of construction markets would be obtained in an environment where free enterprise was a truly ideological force. For this reason, the United States of America was chosen for the next stage of our investigations. Several people were interviewed in an informal and unstructured manner to elicit their views on the action of market forces on construction prices. Although a small number of people were involved, they were thought to be reasonably representative of knowledge in construction pricing. They were also very well able to articulate their views. Our initial reaction to the interviews was that our USA subjects held very close views to those held in the UK. However, detailed analysis revealed the existence of remarkably clear and consistent insights that would not have been obtained in the UK. Further evidence was also obtained from literature relating to the subject and some of the interviewees very kindly expanded on their views in later postal correspondence. We have now analysed all the evidence received and, although a great deal is of an anecdotal nature, we feel that our findings enable at least the basic nature of the subject to be understood and that the factors and their interrelationships can now be examined more formally in relation to construction price levels. I must express my gratitude to the Royal Institution of Chartered Surveyors' Educational Trust and the University of Salford's Department of Civil Engineering for collectively funding this study. My sincere thanks also go to our American participants who freely gave their time and valuable knowledge to us in our enquiries. Finally, I must record my thanks to Tim and Anne for their remarkable ability to produce an intelligible typescript from my unintelligible writing.