756 resultados para Construction industry Costs
Resumo:
Construction industry contributes significantly to environmental degradation, and governments in many countries which are endeavouring to address the situation. Malaysia is no exception. This paper examines the path towards green construction project delivery in Malaysia, focusing on current green policies and initiatives by governments. The historical waves in Malaysian approaches to tackling environmental issues are described, starting from the early 20th century, through the 1990s to the present, and the influence of these approaches on construction practices is analysed. Based on the findings of policy review, essential green construction practices aimed at mitigating the adverse effects of construction activities on the environment in Malaysia were identified. This paper paves the way for future studies in construction and sustainability in Malaysia, especially for the Southeast Asian region where sustainability practices are urgently needed.
Resumo:
Construction projects have a negative impact on the environment. As Malaysia is planning more construction projects to cater for its current and future development needs, practitioners are urged to undertake greener approaches to construction. One of the efforts is the introduction of green procurement, which is promoted under the Malaysian Government’s MyHijau initiative. Construction procurement is recognised as a tool to shift the construction business into a greener industry. However, the implementation of green procurement in Malaysia is still in its infancy and faces a number of challenges, such as the lack of knowledge. A significant gap has been found between policy formulation and actual project delivery as there are no practical guidelines for stakeholders to procure environmental-friendly construction projects. To address this problem, the present research (as part of an ongoing PhD project) aims to develop a green procurement framework that guides stakeholders in procuring green projects in Malaysia. This article highlights the concept of green procurement in Malaysia, the work carried out to date to achieve the research objectives and the preliminary framework that has been established. It is hoped that this research will help academics and practitioners to further explore the potential of green procurement to improve sustainability in the current construction industry practices.
Resumo:
Older adults report a desire to remain within the preferred environment for as long as possible. This desire is referred to as aging-in-place. Aging-in-place integrates housing and care options. Factors affecting the ability to remain within the preferred environment include current home designs, access to housing choices, social support networks, and community services, to name a few. Research supports physical and psychosocial benefits of aging-in-place for the individual. Home modifications have the potential to influence the quality of life in a number of positive directions that range from personal mobility to community engagement. Modifications range from minor to significant. Financial resources, contractor interest and expertise, consumer awareness and consumer opportunity affect the degree of change. Increasingly, construction professionals express an interest in learning more about aging-in place. Queries ranged from obtaining a greater understanding of the meaning of the concept, impact of demographic change on housing stock, and increased awareness of universal design features. This paper presents findings from a survey administered to current members of the Canadian Home Builders’ Association – Calgary Regional Office. Within this presentation, we report findings on members understanding of demographic change and the effect of this change on the current and future housing stock. We discuss perceived barriers and benefits of the development of business models to support aging-in-place. Finally, we conclude with discussion of educational support to enhance the understanding of aging-in-place.
Resumo:
The decision in McDermott v Robinson Helicopter Company (No 2) [2014] QSC 213 involves an extensive examination of authorities on the general principle relating to the awarding of costs to a successful party. The court concluded that there was a predilection in favour of distributing costs according to the outcome or 'event' of particular issues in the action.
Resumo:
Purpose: Knowledge management (KM) is important to the knowledge-intensive construction industry. The diversified and changing nature of works in this field warrants us to stocktake, identify changes and map out KM research framework for future exploration. Design/methodology/approach: The study involves three aspects. First, three stages of KM research in construction were distinguished in terms of the time distribution of 217 target publications. Major topics in the stages were extracted for understanding the changes of research emphasis from evolutionary perspective. Second, the past works were summed up in a three-dimensional research framework in terms of management organization, managerial methodology and approach, and managerial objective. Finally, potential research orientations in the future were predicted to expand the existing research framework. Findings: It was found that (1) KM research has significantly blossomed in the last two decades with a great potential; (2) major topics of KM were changing in terms of technology, technique, organization, attribute of knowledge and research objectives; (3) past KM studies centred around management organization, managerial methodology and approach, and managerial objective thus a three-dimensional research framework was proposed; (4) within the research framework, team-level, project-level and firm-level KM were studied to achieve project, organizational and competitive objectives by integrated methodologies of information technology, social technique and KM process tool; and (5) nine potential research orientations were predicted corresponding to the three dimensions. Finally, an expanded research framework was proposed to encourage and guide future research works in this field. Research limitations/implications: The paper only focused on the construction industry. The findings need further exploration in order to discover any possible missing important research works which were not published in English or not included in the time period. Originality/value: The paper formed a systematic framework of KM research in construction and predicted the potential research orientations. It provides much value for the researchers who want to understand the past and the future of global KM research in the construction industry.
Resumo:
- Purpose The purpose of this paper is to investigate the current skills gap in both generic and skill areas within the construction industry in Queensland, Australia. - Design/methodology/approach An internet-based survey was administered to collect the opinions of construction employees about the workplace-training environment and their perceptions towards training. The survey intended to address the following research questions, specifically in relation to the construction industry. - Findings The survey results reveal that whilst overall participation in workplace training is high, the current workplace training environments do not foster balanced skill development. The study reveals that in the current absence of a formal and well-balanced training mechanism, construction workers generally resort to their own informal self-development initiatives to develop the needed role-specific theoretical knowledge. - Research limitations/implications The findings of the research are based on the data primarily collected in the construction industry in Queensland, Australia. The data are limited to a single Tier 2 construction company. - Practical implications The findings of this study can be utilised to suggest improvements in the current (or develop new) workplace training initiatives. - Social implications The research suggests that workplace training has positive relationship with career growth. The results suggest that in the construction industry, employees are generally well aware of the importance of workplace training in their career development and they largely appreciate training as being a critical factor for developing their capacity to perform their roles successfully, and to maintain their employability. - Originality/value This paper is unique as it investigates the current skills gap in both generic and skill areas within the construction industry in Queensland, Australia. So far no work has been undertaken to identify and discusses the main method of workplace learning within the Tier 2 industry in the context of Queensland Australia.
Resumo:
Three strategically important uses of IT in the construction industry are the storage and management of project documents on webservers (EDM), the electronic handling of orders and invoices between companies (EDI) and the use of 3-D models including non-geometrical attributes for integrated design and construction (BIM). In a broad longitudinal survey study of IT use in the Swedish Construction Industry the extent of use of these techniques was measured in 1998, 2000 and 2007. The results showed that EDM and EDI are currently already well-established techniques whereas BIM, although it promises the biggest potential benefits to the industry, only seems to be at the beginning of adoption. In a follow-up to the quantitative studies, the factors affecting the decisions to implement EDM, EDI and BIM as well as the actual adoption processes, were studied using semi-structured interviews with practitioners. The theoretical basis for the interview studies was informed by theoretical frameworks from IT-adoption theory, where in particular the UTAUT model has provided the main basis for the analyses presented here. The results showed that the decisions to take the above technologies into use are made on three differ- ent levels: the individual level, the organizational level in the form of a company, and the organiza- tional level in the form of a project. The different patterns in adoption can to some part be explained by where the decisions are mainly taken. EDM is driven from the organisation/project level, EDI mainly from the organisation/company level, and BIM is driven by individuals pioneering the technique.
Resumo:
Triggered by the very quick proliferation of Internet connectivity, electronic document management (EDM) systems are now rapidly being adopted for managing the documentation that is produced and exchanged in construction projects. Nevertheless there are still substantial barriers to the efficient use of such systems, mainly of a psychological nature and related to insufficient training. This paper presents the results of empirical studies carried out during 2002 concerning the current usage of EDM systems in the Finnish construction industry. The studies employed three different methods in order to provide a multifaceted view of the problem area, both on the industry and individual project level. In order to provide an accurate measurement of overall usage volume in the industry as a whole telephone interviews with key personnel from 100 randomly chosen construction projects were conducted. The interviews showed that while around 1/3 of big projects already have adopted the use of EDM, very few small projects have adopted this technology. The barriers to introduction were investigated through interviews with representatives for half a dozen of providers of systems and ASP-services. These interviews shed a lot of light on the dynamics of the market for this type of services and illustrated the diversity of business strategies adopted by vendors. In the final study log files from a project which had used an EDM system were analysed in order to determine usage patterns. The results illustrated that use is yet incomplete in coverage and that only a part of the individuals involved in the project used the system efficiently, either as information producers or consumers. The study also provided feedback on the usefulness of the log files.