868 resultados para Construction Project Delivery


Relevância:

90.00% 90.00%

Publicador:

Resumo:

The state of health and safety on construction sites in Ghana was investigated using first hand observation of fourteen (14) construction project sites in 2009 and 2010. At each site, the construction project, workers and the physical environment of the site were inspected and evaluated against health and safety indicators taken from the literature. The results reveal a poor state of health and safety on Ghanaian construction sites. The primary reasons are a lack of strong institutional framework for governing construction activities and poor enforcement of health and safety policies and procedures. Also, Ghanaian society does not place a high premium on health and safety of construction workers on site. Interviews with workers indicated that injuries and accidents are common on sites. However, compensation for injury is often at the discretion of the contractor although collective bargaining agreements between Labour unions and employers prescribe obligations for the contractor in the event of injury to a worker.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Little attention has been focussed on a precise definition and evaluation mechanism for project management risk specifically related to contractors. When bidding, contractors traditionally price risks using unsystematic approaches. The high business failure rate our industry records may indicate that the current unsystematic mechanisms contractors use for building up contingencies may be inadequate. The reluctance of some contractors to include a price for risk in their tenders when bidding for work competitively may also not be a useful approach. Here, instead, we first define the meaning of contractor contingency, and then we develop a facile quantitative technique that contractors can use to estimate a price for project risk. This model will help contractors analyse their exposure to project risks; and help them express the risk in monetary terms for management action. When bidding for work, they can decide how to allocate contingencies strategically in a way that balances risk and reward.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The complexity of construction projects and the fragmentation of the construction industry undertaking those projects has effectively resulted in linear, uncoordinated and highly variable project processes in the UK construction sector. Research undertaken at the University of Salford resulted in the development of an improved project process, the Process Protocol, which considers the whole lifecycle of a construction project whilst integrating its participants under a common framework. The Process Protocol identifies the various phases of a construction project with particular emphasis on what is described in the manufacturing industry as the ‘fuzzy front end’. The participants in the process are described in terms of the activities that need to be undertaken in order to achieve a successful project and process execution. In addition, the decision-making mechanisms, from a client perspective, are illustrated and the foundations for a learning organization/industry are facilitated within a consistent Process Protocol.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

What happens when digital coordination practices are introduced into the institutionalized setting of an engineering project? This question is addressed through an interpretive study that examines how a shared digital model becomes used in the late design stages of a major station refurbishment project. The paper contributes by mobilizing the idea of ‘hybrid practices’ to understand the diverse patterns of activity that emerge to manage digital coordination of design. It articulates how engineering and architecture professions develop different relationships with the shared model; the design team negotiates paper-based practices across organizational boundaries; and diverse practitioners probe the potential and limitations of the digital infrastructure. While different software packages and tools have become linked together into an integrated digital infrastructure, these emerging hybrid practices contrast with the interactions anticipated in practice and policy guidance and presenting new opportunities and challenges for managing project delivery. The study has implications for researchers working in the growing field of empirical work on engineering project organizations as it shows the importance of considering, and suggests new ways to theorise, the introduction of digital coordination practices into these institutionalized settings.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

From its roots in strategic management theory, stakeholder management has been adopted by the construction management academic community and applied as a valid paradigm around which research work has been generated aiming to improve project effi ciencies and effectiveness. However, academics have argued that stakeholder management should move away from purely theoretical discussions and engage more with the realities of construction project work. This paper re-appraises the stakeholder management concept for the construction domain by re-thinking some of the fundamental principles and ideals present within the more general stakeholder theory literature. It engages with issues which researchers have arguably failed to acknowledge and calls for a re-evaluation of construction stakeholder management research by presenting a review around four distinctive themes: the moral obligations of engaging with stakeholders against the business and efficiency driven imperatives of construction organisations; the contrast between theoretical abstractions and empirically grounded research; the tensions between theoretical convergence versus calls for multiple and divergent perspectives on stakeholder management and the practicalities of conducting stakeholder management in the construction domain. Such a critical re-appraisal of stakeholder management thinking both generates new lines of enquiry and promises to help inform and shape current and future industry practice.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

An alternative approach to understanding innovation is made using two intersecting ideas. The first is that successful innovation requires consideration of the social and organizational contexts in which it is located. The complex context of construction work is characterized by inter-organizational collaboration, a project-based approach and power distributed amongst collaborating organizations. The second is that innovations can be divided into two modes: ‘bounded’, where the implications of innovation are restricted within a single, coherent sphere of influence, and ‘unbounded’, where the effects of implementation spill over beyond this. Bounded innovations are adequately explained within the construction literature. However, less discussed are unbounded innovations, where many firms' collaboration is required for successful implementation, even though many innovations can be considered unbounded within construction's inter-organizational context. It is argued that unbounded innovations require an approach to understand and facilitate the interactions both within a range of actors and between the actors and technological artefacts. The insights from a sociology of technology approach can be applied to the multiplicity of negotiations and alignments that constitute the implementation of unbounded innovation. The utility of concepts from the sociology of technology, including ‘system building’ and ‘heterogeneous engineering’, is demonstrated by applying them to an empirical study of an unbounded innovation on a major construction project (the new terminal at Heathrow Airport, London, UK). This study suggests that ‘system building’ contains outcomes that are not only transformations of practices, processes and systems, but also the potential transformation of technologies themselves.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The construction industry is widely recognised as being inherent with risk and uncertainty. This necessitates the need for effective project risk management to achieve the project objectives of time, cost and quality. A popular tool employed in projects to aid in the management of risk is a risk register. This tool documents the project risks and is often employed by the Project Manager (PM) to manage the associated risks on a project. This research aims to ascertain how widely risk registers are used by Project Managers as part of their risk management practices. To achieve this aim entailed interviewing ten PMs, to discuss their use of the risk register as a risk management tool. The results from these interviews indicated the prevalent use of this document and recognised its effectiveness in the management of project risks. The findings identified the front end and feasibility phases of a project as crucial stages for using risk registers, noting it as a vital ingredient in the risk response planning of the decision making process. Moreover, the composition of the risk register was also understood, with an insight into how PMs produce and develop this tool also ascertained. In conclusion, this research signifies the extensive use of the risk register by PMs. A majority of PMs were of the view that risk registers constitute an essential component of their project risk management practices. This suggests a need for further research on the extent to which risk registers actually help PMs to control the risks in a construction project, particularly residual risks, and how this can be improved to minimize deviations from expected outcomes.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Numerous Building Information Modelling (BIM) tools are well established and potentially beneficial in certain uses. However, issues of adoption and implementation persist, particularly for on-site use of BIM tools in the construction phase. We describe an empirical case-study of the implementation of an innovative ‘Site BIM’ system on a major hospital construction project. The main contractor on the project developed BIM-enabled tools to allow site workers using mobile tablet personal computers to access design information and to capture work quality and progress data on-site. Accounts show that ‘Site BIM’, while judged to be successful and actively supporting users, was delivered through an exploratory and emergent development process of informal prototyping. Technical IT skills were adopted into the construction project through personal relationships and arrangements rather than formal processes. Implementation was driven by construction project employees rather than controlled centrally by the corporate IT function.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Students in the architecture, engineering, and construction disciplines are often challenged with visualizing and understanding the complex spatial and temporal relationships involved in designing and constructing three-dimensional (3D) structures. An evolving body of research traces the use of educational computer simulations to enhance student learning experiences through testing real-world scenarios and the development of student decision-making skills. Ongoing research at Pennsylvania State University aims to improve engineering education in construction through interactive construction project learning applications in an immersive virtual reality environment. This paper describes the first- and second-generation development of the Virtual Construction Simulator (VCS), a tool that enables students to simultaneously create and review construction schedules through 3D model interaction. The educational value and utility of VCS was assessed through surveys, focus group interviews, and a student exercise conducted in a construction management class. Results revealed VCS is a valuable and effective four-dimensional (4D) model creation and schedule review application that fosters collaborative work and greater student task focus. This paper concludes with a discussion of the findings and the future development steps of the VCS educational simulation

Relevância:

90.00% 90.00%

Publicador:

Resumo:

There is a renewed interest in immersive visualization to navigate digital data-sets associated with large building and infrastructure projects. Following work with a fully immersive visualization facility at the University, this paper details the development of a complementary mobile visualization environment. It articulates progress on the requirements for this facility; the overall design of hardware and software; and the laboratory testing and planning for user pilots in construction applications. Like our fixed facility, this new light-weight mobile solution enables a group of users to navigate a 3D model at a 1:1 scale and to work collaboratively with structured asset information. However it offers greater flexibility as two users can assemble and start using it at a new location within an hour. The solution has been developed and tested in a laboratory and will be piloted in engineering design review and stakeholder engagement applications on a major construction project.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Objective: To clarify how infection control requirements are represented, communicated, and understood in work interactions through the medical facility construction project life cycle. To assist project participants with effective infection control management by highlighting the nature of such requirements and presenting recommendations to aid practice. Background: A 4-year study regarding client requirement representation and use on National Health Service construction projects in the United Kingdom provided empirical evidence of infection control requirement communication and understanding through design and construction work interactions. Methods: An analysis of construction project resources (e.g., infection control regulations and room data sheets) was combined with semi-structured interviews with hospital client employees and design and construction professionals to provide valuable insights into the management of infection control issues. Results: Infection control requirements are representationally indistinct but also omnipresent through all phases of the construction project life cycle: Failure to recognize their nature, relevance, and significance can result in delays, stoppages, and redesign work. Construction project resources (e.g., regulatory guidance and room data sheets) can mask or obscure the meaning of infection control issues. Conclusions: A preemptive identification of issues combined with knowledge sharing activities among project stakeholders can enable infection control requirements to be properly understood and addressed. Such initiatives should also reference existing infection control regulatory guidance and advice.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

L’elaborato ha avuto ad oggetto l’analisi delle sofisticate soluzioni normative proposte dall’ordinamento nazionale in relazione all’evoluzione della finanza di progetto. In particolare, è stata condotto un dettagliato studio delle fasi che compongono il project financing, nonché dei soggetti che, a diverso titolo e ragione, vi partecipano. L’elaborato contiene, poi, recenti esempi concreti di project financing nelle infrastrutture primarie (autostrade) tra cui il progetto di costruzione e la successiva gestione dell’autostrada regionale Medio Padana veneta, dell’autostrada regionale Cispadana, e dell’autostrada “Nogara-mare”. L’ultimo parte della tesi è stata infine incentrata sull’analisi delle più recenti pronunce giurisprudenziali in materia di project financing. In particolare, si ha avuto modo di analizzare il fenomeno dello jus poenitendi dell’amministrazione aggiudicatrice, nonché, più in generale gli eventi che possono negativamente incidere sulla finanza di progetto (mancata aggiudicazione, risoluzione del contratto di gestione, ecc.).

Relevância:

90.00% 90.00%

Publicador:

Resumo:

During the project, managers encounter numerous contingencies and are faced with the challenging task of making decisions that will effectively keep the project on track. This task is very challenging because construction projects are non-prototypical and the processes are irreversible. Therefore, it is critical to apply a methodological approach to develop a few alternative management decision strategies during the planning phase, which can be deployed to manage alternative scenarios resulting from expected and unexpected disruptions in the as-planned schedule. Such a methodology should have the following features but are missing in the existing research: (1) looking at the effects of local decisions on the global project outcomes, (2) studying how a schedule responds to decisions and disruptive events because the risk in a schedule is a function of the decisions made, (3) establishing a method to assess and improve the management decision strategies, and (4) developing project specific decision strategies because each construction project is unique and the lessons from a particular project cannot be easily applied to projects that have different contexts. The objective of this dissertation is to develop a schedule-based simulation framework to design, assess, and improve sequences of decisions for the execution stage. The contribution of this research is the introduction of applying decision strategies to manage a project and the establishment of iterative methodology to continuously assess and improve decision strategies and schedules. The project managers or schedulers can implement the methodology to develop and identify schedules accompanied by suitable decision strategies to manage a project at the planning stage. The developed methodology also lays the foundation for an algorithm towards continuously automatically generating satisfactory schedule and strategies through the construction life of a project. Different from studying isolated daily decisions, the proposed framework introduces the notion of {em decision strategies} to manage construction process. A decision strategy is a sequence of interdependent decisions determined by resource allocation policies such as labor, material, equipment, and space policies. The schedule-based simulation framework consists of two parts, experiment design and result assessment. The core of the experiment design is the establishment of an iterative method to test and improve decision strategies and schedules, which is based on the introduction of decision strategies and the development of a schedule-based simulation testbed. The simulation testbed used is Interactive Construction Decision Making Aid (ICDMA). ICDMA has an emulator to duplicate the construction process that has been previously developed and a random event generator that allows the decision-maker to respond to disruptions in the emulation. It is used to study how the schedule responds to these disruptions and the corresponding decisions made over the duration of the project while accounting for cascading impacts and dependencies between activities. The dissertation is organized into two parts. The first part presents the existing research, identifies the departure points of this work, and develops a schedule-based simulation framework to design, assess, and improve decision strategies. In the second part, the proposed schedule-based simulation framework is applied to investigate specific research problems.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Several parties (stakeholders) are involved in a construction project. The conventional Risk Management Process (RMP) manages risks from a single party perspective, which does not give adequate consideration to the needs of others. The objective of multi-party risk management is to assist decision-makers in managing risk systematically and most efficiently in a multi-party environment. Multi-party Risk Management Processes (MRMP) consist of risk identification, structuring, analysis and developing responses from all party perspectives. The MRMP has been applied to a cement plant construction project in Thailand to demonstrate its effectiveness.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

An inherent weakness in the management of large scale projects is the failure to achieve the scheduled completion date. When projects are planned with the objective of time achievement, the initial planning plays a vital role in the successful achievement of project deadlines. Cost and quality are additional priorities when such projects are being executed. This article proposes a methodology for achieving time duration of a project through risk analysis with the application of a Monte Carlo simulation technique. The methodology is demonstrated using a case application of a cross-country petroleum pipeline construction project.