989 resultados para Complex Projects


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Wind resource evaluation in two sites located in Portugal was performed using the mesoscale modelling system Weather Research and Forecasting (WRF) and the wind resource analysis tool commonly used within the wind power industry, the Wind Atlas Analysis and Application Program (WAsP) microscale model. Wind measurement campaigns were conducted in the selected sites, allowing for a comparison between in situ measurements and simulated wind, in terms of flow characteristics and energy yields estimates. Three different methodologies were tested, aiming to provide an overview of the benefits and limitations of these methodologies for wind resource estimation. In the first methodology the mesoscale model acts like “virtual” wind measuring stations, where wind data was computed by WRF for both sites and inserted directly as input in WAsP. In the second approach, the same procedure was followed but here the terrain influences induced by the mesoscale model low resolution terrain data were removed from the simulated wind data. In the third methodology, the simulated wind data is extracted at the top of the planetary boundary layer height for both sites, aiming to assess if the use of geostrophic winds (which, by definition, are not influenced by the local terrain) can bring any improvement in the models performance. The obtained results for the abovementioned methodologies were compared with those resulting from in situ measurements, in terms of mean wind speed, Weibull probability density function parameters and production estimates, considering the installation of one wind turbine in each site. Results showed that the second tested approach is the one that produces values closest to the measured ones, and fairly acceptable deviations were found using this coupling technique in terms of estimated annual production. However, mesoscale output should not be used directly in wind farm sitting projects, mainly due to the mesoscale model terrain data poor resolution. Instead, the use of mesoscale output in microscale models should be seen as a valid alternative to in situ data mainly for preliminary wind resource assessments, although the application of mesoscale and microscale coupling in areas with complex topography should be done with extreme caution.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The initial timing of face-specific effects in event-related potentials (ERPs) is a point of contention in face processing research. Although effects during the time of the N170 are robust in the literature, inconsistent effects during the time of the P100 challenge the interpretation of the N170 as being the initial face-specific ERP effect. The interpretation of the early P100 effects are often attributed to low-level differences between face stimuli and a host of other image categories. Research using sophisticated controls for low-level stimulus characteristics (Rousselet, Husk, Bennett, & Sekuler, 2008) report robust face effects starting at around 130 ms following stimulus onset. The present study examines the independent components (ICs) of the P100 and N170 complex in the context of a minimally controlled low-level stimulus set and a clear P100 effect for faces versus houses at the scalp. Results indicate that four ICs account for the ERPs to faces and houses in the first 200ms following stimulus onset. The IC that accounts for the majority of the scalp N170 (icNla) begins dissociating stimulus conditions at approximately 130 ms, closely replicating the scalp results of Rousselet et al. (2008). The scalp effects at the time of the P100 are accounted for by two constituent ICs (icP1a and icP1b). The IC that projects the greatest voltage at the scalp during the P100 (icP1a) shows a face-minus-house effect over the period of the P100 that is less robust than the N 170 effect of icN 1 a when measured as the average of single subject differential activation robustness. The second constituent process of the P100 (icP1b), although projecting a smaller voltage to the scalp than icP1a, shows a more robust effect for the face-minus-house contrast starting prior to 100 ms following stimulus onset. Further, the effect expressed by icP1 b takes the form of a larger negative projection to medial occipital sites for houses over faces partially canceling the larger projection of icP1a, thereby enhancing the face positivity at this time. These findings have three main implications for ERP research on face processing: First, the ICs that constitute the face-minus-house P100 effect are independent from the ICs that constitute the N170 effect. This suggests that the P100 effect and the N170 effect are anatomically independent. Second, the timing of the N170 effect can be recovered from scalp ERPs that have spatio-temporally overlapping effects possibly associated with low-level stimulus characteristics. This unmixing of the EEG signals may reduce the need for highly constrained stimulus sets, a characteristic that is not always desirable for a topic that is highly coupled to ecological validity. Third, by unmixing the constituent processes of the EEG signals new analysis strategies are made available. In particular the exploration of the relationship between cortical processes over the period of the P100 and N170 ERP complex (and beyond) may provide previously unaccessible answers to questions such as: Is the face effect a special relationship between low-level and high-level processes along the visual stream?

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Chapter 1 presents a brief note on the state at which the construction industry stands at present, bringing into focus the significance of the critical study. Relevance of the study, area of investigation and objectives of the study are outlined in this chapter. The 2nd chapter presents a review of the literature on the relevant areas. In the third chapter an analysis on time and cost overrun in construction highlighting the major factors responsible for it has been done. A couple of case studies to estimate loss to the nation on account of delay in construction have been presented in the chapter. The need for an appropriate estimate and a competent contractor has been emphasised for improving effectiveness in the project implementation. Certain useful equations and thoughts have been formulated on this area in this chapter that can be followed in State PWD and other Govt. organisations. Case studies on project implementation of major projects undertaken by Government sponsored/supported organizations in Kerala have been dealt with in Chapter 4. A detailed description of the project of Kerala Legislature Complex with a critical analysis has been given in this chapter. A detailed account of the investigations carried out on the construction of International Stadium, a sports project of Greater Cochin Development Authority is included here. The project details of Cochin International Airport at Nedumbassery, its promoters and contractors are also discussed in Chapter 4. Various aspects of implementation which led the above projects successful have been discussed in chapter 5. The data collected were analysed through discussion and perceptions to arrive at certain conclusions. The emergence of front-loaded contract and its impact on economics of the project execution are dealt with in this chapter. Analysis of delays in respect of the various project narrated in chapter 3 has been done here. The root causes of the project time and overrun and its remedial measures are also enlisted in this chapter. Study of cost and time overrun of any construction project IS a part of construction management. Under the present environment of heavy investment on construction activities in India, the consequences of mismanagement many a time lead to excessive expenditure which are not be avoidable. Cost consciousness, therefore has to be keener than ever before. Optimization in investment can be achieved by improved dynamism in construction management. The successful completion of coristruction projects within the specified programme, optimizing three major attributes of the process - quality, schedule and costs - has become the most valuable and challenging task for the engineer - managers to perform. So, the various aspects of construction management such as cost control, schedule control, quality assurance, management techniques etc. have also been discussed in this fifth chapter. Chapter 6 summarises the conclusions drawn from the above criticalr1 of rhajor construction projects in Kerala.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In drawing a conclusion for this study, care must be taken in generalizing findings since the population of students and teachers investigated were limited to certain levels in the different schools and countries. This study recognized some complexity of the factors underlying the status of school gardening instruction and activities in Germany, Nigeria and the U.S. as inadequate time for decision-making in the process of gardening, motivation of teachers and students. This was seen as the major impediments that influenced the status of gardening in the three countries. However, these factors were considered to have affected students’ mode of participation in the school gardening projects. This research finding suggests that the promotion and encouragement of students in gardening activities will promote vegetable production and increasing the numbers of practical farmers. Gardening has the potential to create opportunities for learning in an environment where children are able to experience nature first hand and to use the shared experience for communication (Bowker & Tearle, 2007). Therefore, the need for students to be encouraged to participate in gardening programs as the benefit will not only reduce the rate of obesity currently spreading among youths, but will contribute to the improve knowledge on science subjects. To build a network between community, parents and schools, a parent’s community approach should be used as the curriculum. The community approach will tighten the link between schools; community members, parents, teachers and students. This will help facilitate a better gardening projects implementation. Through a close collaboration, teachers and students will be able to identify issues affecting communities and undertake action learning in collaboration with community organizations to assess community needs and plan the implementation strategies as parents are part of the community. The sense of efficacy is a central factor in motivational and learning processes that govern educational improvement, standard and performance on complex tasks of both teachers and students. Dedication and willingness are the major stimulator and achievement of a project. Through a stimulator and provision of incentives and facilities, schools can achieve the best in project development. Teachers and principals should be aware that students are the lever for achieving the set goals in schools. Failure to understand what students need will result in achieving zero result. Therefore, it is advised that schools focus more on how to lure students to work through proper collaboration with the parents and community members. Principals and teachers should identify areas where students need to be corrected, helping them to correct the problem will enable them be committed in the schools’ programs.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Problem structuring methods or PSMs are widely applied across a range of variable but generally small-scale organizational contexts. However, it has been argued that they are seen and experienced less often in areas of wide ranging and highly complex human activity-specifically those relating to sustainability, environment, democracy and conflict (or SEDC). In an attempt to plan, track and influence human activity in SEDC contexts, the authors in this paper make the theoretical case for a PSM, derived from various existing approaches. They show how it could make a contribution in a specific practical context-within sustainable coastal development projects around the Mediterranean which have utilized systemic and prospective sustainability analysis or, as it is now known, Imagine. The latter is itself a PSM but one which is 'bounded' within the limits of the project to help deliver the required 'deliverables' set out in the project blueprint. The authors argue that sustainable development projects would benefit from a deconstruction of process by those engaged in the project and suggest one approach that could be taken-a breakout from a project-bounded PSM to an analysis that embraces the project itself. The paper begins with an introduction to the sustainable development context and literature and then goes on to illustrate the issues by grounding the debate within a set of projects facilitated by Blue Plan for Mediterranean coastal zones. The paper goes on to show how the analytical framework could be applied and what insights might be generated.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The UK industry has been criticised for being slow to adopt construction process innovations. Research shows that the idiosyncrasies of participants, their roles in the system and the contextual differences between sections of the industry make this a highly complex problem. There is considerable evidence that informal social networks play a key role in diffusion of innovations. The aim is to identify informal communication networks of project participants and the role these play in the diffusion of construction innovations. The characteristics of this network will be analysed in order to understand how they can be used to accelerate innovation diffusion within and between projects. Social Network Analysis is used to determine informal communication routes. Control and experiment case study projects are used within two different organizations. This allows informal communication routes concerning innovations to be mapped, whilst testing if the informal routes can facilitate diffusion. Analysis will focus upon understanding the combination of informal strong and weak ties, and how these impede or facilitate the diffusion of the innovation. Initial work suggests the presence of an informal communication network. Actors within this informal network, and the organization's management are unaware of its' existence and their informal roles within it. Thus, the network remains an untapped medium regarding innovation diffusion. It is proposed that successful innovation diffusion is dependent upon understanding informal strong and weak ties, at project, organization and industry level.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

As integrated software solutions reshape project delivery, they alter the bases for collaboration and competition across firms in complex industries. This paper synthesises and extends literatures on strategy in project-based industries and digitally-integrated work to understand how project-based firms interact with digital infrastructures for project delivery. Four identified strategies are to: 1) develop and use capabilities to shape the integrated software solutions that are used in projects; 2) co-specialize, developing complementary assets to work repeatedly with a particular integrator firm; 3) retain flexibility by developing and maintaining capabilities in multiple digital technologies and processes; and 4) manage interfaces, translating work into project formats for coordination while hiding proprietary data and capabilities in internal systems. The paper articulates the strategic importance of digital infrastructures for delivery as well as product architectures. It concludes by discussing managerial implications of the identified strategies and areas for further research.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Industrial projects are often complex and burdened with time pressures and a lack of information. The term 'soft-project' used here stands for projects where the ‘what’ and/or the ‘how’ is uncertain, which is often the experience in projects involving software intensive systems developments. This thesis intertwines the disciplines of project management and requirements engineering in a goal-oriented application of the maxim ‘keep all objectives satisfied’. It thus proposes a method for appraising projects. In this method, a goal-oriented analysis establishes a framework with which expert judgements are collected so as to construct a confidence profile in regard to the feasibility and adequacy of the project's planned outputs. It is hoped that this appraisal method will contribute to the activities of project ‘shaping’ and aligning stakeholders’ expectations whilst helping project managers appreciate what parts of their project can be progressed and what parts should be held pending further analysis. This thesis offers the following original contribution: an appreciation of appraisal in the project context; a goal-oriented confidence profiling technique; and: a technique to produce goal-refinement diagrams – referred to as Goal Sketching. Collectively these amount to a method for the ‘Goal Refinement Appraisal of Soft-Projects’ (GRASP). The validity of the GRASP method is shown for two projects. In the first it is used for shaping a business investigation project. This is done in real-time in the project. The second case is a retrospective study of an enterprise IT project. This case tests the effectiveness of forecasting project difficulty from an initial confidence profile.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

We define and experimentally test a public provision mechanism that meets three basic ethical requirements and allows community members to influence, via monetary bids, which of several projects is implemented. For each project, participants are assigned personal values, which can be positive or negative. We provide either public or private information about personal values. This produces two distinct public provision games, which are experimentally implemented and analyzed for various projects. In spite of the complex experimental task, participants do not rely on bidding their own personal values as an obvious simple heuristic whose general acceptance would result in fair and efficient outcomes. Rather, they rely on strategic underbidding. Although underbidding is affected by projects’ characteristics, the provision mechanism mostly leads to the implementation of the most efficient project.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Carbon has been described as a ‘surreal commodity’. Whilst carbon trading, storage, sequestration and emissions have become a part of the contemporary climate lexicon, how carbon is understood, valued and interpreted by actors responsible for implementing carbon sequestration projects is still unclear. In this review paper, we are concerned with how carbon has come to take on a range of meanings, and in particular, we appraise what is known about the situated meanings that people involved in delivering, and participating in, carbon sequestration projects in the global South assign to this complex element. Whilst there has been some reflection on the new meanings conferred on carbon via the neoliberal processes of marketisation, and how these processes interact with historical and contemporary narratives of environmental change, less is known about how these meanings are (re)produced and (re)interpreted locally. We review how carbon has been defined both as a chemical element and as a tradable, marketable commodity, and discuss the implications these global meanings might have for situated understandings, particularly linked to climate change narratives, amongst communities in the global South. We consider how the concept of carbon capabilities, alongside theoretical notions of networks, assemblages and local knowledges of the environment and nature, might be useful in beginning to understand how communities engage with abstract notions of carbon. We discuss the implications of specific values attributed to carbon, and therefore to different ecologies, for wider conceptualisations of how nature is valued, and climate is understood, and particularly how this may impact on community interactions with carbon sequestration projects. Knowing more about how people understand, value and know carbon allows policies to be better informed and practices more effectively targeted at engaging local populations meaningfully in carbon-related projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The ventral tegmental area (VTA) is a nodal link in reward circuitry. Based on its striatal output, it has been subdivided in a caudomedial part which targets the ventromedial striatum, and a lateral part which targets the ventrolateral striatum [Ikemoto S (2007) Dopamine reward circuitry: two projection systems from the ventral midbrain to the nucleus accumbens-olfactory tubercle complex. Brain Res Rev 56:27-78]. Whether these two VTA parts are interconnected and to what extent the VTA innervates the substantia nigra compacta (SNc) and retrorubral nucleus (RR) are critical issues for understanding information processing in the basal ganglia. Here, VTA projections to the VTA-nigral complex were examined in rats, using Phaseolus vulgaris leucoagglutinin (PHA-L) as anterograde tracer. The results show that the dorsolateral VTA projects to itself, as well as to the dorsal tier of the SNc and RR, largely avoiding the caudomedial VTA. The ventrolateral VTA innervates mainly the interfascicular nucleus. The components of the caudomedial VTA (the interfascicular, paranigral and caudal linear nuclei) are connected with each other. In addition, the caudomedial VTA (especially the paranigral and caudal linear nuclei) innervates the lateral VTA, and, to a lesser degree, the SNc and RR. The caudal pole of the VTA sends robust, bilateral projections to virtually all the VTA-nigral complex, which terminate in the dorsal and ventral tiers. Modest inputs from the medial supramammillary nucleus to ventromedial parts of the VTA-nigral complex were also identified. In double-immunostained sections, PHA-L-labeled varicosities were sometimes found apposed to tyrosine hydroxylase-positive neurons in the ventral mesencephalon. Overall, the results underscore that VTA projections to the VTA-nigral complex are substantial and topically organized. In general, these projections, like the spiralated striato-nigro-striatal loops, display a medial-to-lateral organization. This anatomical arrangement conceivably permits the ventromedial striatum to influence the activity of the lateral striatum. The caudal pole of the VTA appears to be a critical site for a global recruitment of the mesotelencephalic system. (C) 2008 IBRO. Published by Elsevier Ltd. All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Complex qualitative research projects often require not only adjustments during project implemellfation, but also
adaptation of the methodology and research design. The paper discusses the enhancement of the structured-case
approach to include action research style interventions within structured-case cycles. An application of this approach is presented based on a study of a Community of Practice (CoP) ill the information .lystems domain conducted in four research cycles over several years. The major benefits of the evolved method in elude the flexibility of the resulting research process, and the capacity to capture diverse project outcomes, at the same time making themy building more transparent

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper reports the findings of a research project which was aimed at developing and promoting a greater understanding of the uniqueness of successful Australian-Malaysian partnerships and joint ventures undertaken on complex multi-partner mega construction projects. The aim of the investigation was to identify the critical success factors specific to such partnerships. The theoretical framework was grounded in a previous empirical study on design firm internationalisation which demonstrated that long-term success in international markets is enhanced by the management of integration of transformation of social, cultural and intellectual capital within the firm. A generic adaptive performance framework mapping the key performance indicators for each of these dimensions was developed which can be modified to unique contexts related to specific geographical localities. In the Australian Malaysian Institute study the framework is tested within the context of firm and shared partnership capital. The broad interpretive framework of adaptive performance was refined as a result of the findings of the four case studies of Malaysian organisations to develop a partnerships capacity performance measurement framework for Malaysian firms working on international projects. Six in-depth interviews were conducted with ten participants across the four Malaysian firms and a thematic analysis was undertaken of the transcripts. A reflexive capability maturity assessment tool was developed from insights gained into the underlying causes of key barriers coupled with common themes emerging in relation to the successful approaches used by case study firms to overcome those barriers. Specific examples of the case study firms' demonstration of reflexive capability in the areas of market knowledge, design management and market entry are presented.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

There are a growing number of large-scale freshwater ecological restoration projects worldwide. Assessments of the benefits and costs of restoration often exclude an analysis of uncertainty in the modelled outcomes. To address this shortcoming we explicitly model the uncertainties associated with measures of ecosystem health in the estuary of the Murray– Darling Basin, Australia and how those measures may change with the implementation of a Basin-wide Plan to recover water to improve ecosystem health. Specifically, we compare two metrics – one simple and one more complex – to manage end-of-system flow requirements for one ecosystem asset in the Basin, the internationally important Coorong saline wetlands. Our risk assessment confirms that the ecological conditions in the Coorong are likely to improve with implementation of the Basin Plan; however, there are risks of a Type III error (where the correct answer is found for the wrong question) associated with using the simple metric for adaptive management. 

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper reports the increasing popularity of outsourcing academic works by university students motivated by the lure of lucrative dividends and visa opportunities. Due to a lack of formal methods in detecting such transactions, freelance websites are thriving in facilitating the trade of outsourced assignments. This is compounded by the fact that many university staff have neither the time nor training to perform complex media analysis and forensic investigations. This paper proposes a method to aid in the identification of those who outsource assignment works on the most popular site freelancer.com. We include a recent real-world case study to demonstrate the relevancy and applicability of our methodology. In this case study, a suspect attempts to evade detection via use of anti-forensics which demonstrates the capability and awareness of evasion techniques used by students.