848 resultados para Case construction


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Purpose – Employee turnover entails considerable costs and is a major problem for the construction industry. By creating an extensive framework, this study aims to examine whether perceived work-related factors affect turnover intention in South Korean construction companies. Research design – The paper is based on the results of a questionnaire of 136 employees that was conducted and provided by a Korean construction company. Research hypotheses were tested via correlation analyses. The most influencing work-related factors, as well as differences among job levels, were determined by multiple regression analyses. Findings – Communication, immediate leaders, organizational commitment, and organizational pride substantially affect turnover intentions. All of these factors can be considered as relational factors. The most influencing factors differ among job levels. Discussion/practical implications – Immediate leaders should be aware of their role in retaining employees and enhance communication, organizational commitment and pride. This study shows how the importance of certain variables differs for groups of employees. Theoretical implications/limitations– This study is based on a sample of employees from a Korean construction company. Therefore, the generalizability of the findings has to be tested. Future research should test the proposed framework with other factors or resources. Originality/value – This study shed light on the turnover subject in the South Korean construction industry. It shows that different factors can influence turnover intention among job levels. A framework was created, which is based on 16 work-related factors including organizational factors, HRM practices and job attitudes.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Purpose – Employee turnover entails considerable costs and is a major problem for the construction industry. By creating an extensive framework, this study aims to examine whether perceived work-related factors affect turnover intention in South Korean construction companies. Research design – The paper is based on the results of a questionnaire of 136 employees that was conducted and provided by a Korean construction company. Research hypotheses were tested via correlation analyses. The most influencing work-related factors, as well as differences among job levels, were determined by multiple regression analyses. Findings – Communication, immediate leaders, organizational commitment, and organizational pride substantially affect turnover intentions. All of these factors can be considered as relational factors. The most influencing factors differ among job levels. Discussion/practical implications – Immediate leaders should be aware of their role in retaining employees and enhance communication, organizational commitment and pride. This study shows how the importance of certain variables differs for groups of employees. Theoretical implications/limitations– This study is based on a sample of employees from a Korean construction company. Therefore, the generalizability of the findings has to be tested. Future research should test the proposed framework with other factors or resources. Originality/value – This study shed light on the turnover subject in the South Korean construction industry. It shows that different factors can influence turnover intention among job levels. A framework was created, which is based on 16 work-related factors including organizational factors, HRM practices and job attitudes.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The construction industry should be a priority to all governments because it impacts economically and socially on all citizens. Sector turnover in industrialised economies typically averages 8-12% of GDP. Further, construction is critical to economic growth. Recent Australian studies estimate that a 10% gain in efficiency in construction translates to a 2.5% increase in GDP Inefficiencies in the Australian construction industry have been identified by a number of recent studies modelling the building process. They have identified potential savings in time of between 25% and 40% by reducing non-value added steps in the process. A culture of reform is now emerging in the industry – one in which alternate forms of project delivery are being trialed. Government and industry have identified Alliance Contracting as a means to increase efficiency in the construction industry as part of a new innovative procurement environment. Alliance contracting requires parties to form relationships and work cooperatively to provide a more complete service. This is a significant cultural change for the construction industry, with its well-known adversarial record in traditional contracting. Alliance contracts offer enormous potential benefits, but the Australian construction industry needs to develop new skills to effectively participate in the new relationship environment. This paper describes a collaborative project identifying skill needs for clients and construction professionals to more effectively participate in an increasingly sophisticated international procurement environment. The aim of identifying these skill needs is to assist industry, government, and skill developers to prepare the Australian construction workforce for the future. The collaborating Australian team has been fortunate to secure the Australian National Museum in Canberra as its live case study. The Acton Peninsula Development is the first major building development in the world awarded on the basis of a joint alliance contract.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Many studies have been carried out in relation to construction procurement methods. Evidence shows that there needs to be a change of culture and attitude in the construction industry, moving away from traditional adversarial relationship into cooperative and collaborative relationship. At the same time there is also an increasing concern and discussion on alternative procurement methods, drifting away from traditional procurement systems. Relational contracting approaches have become more popular in recent years, and have appeared in common forms such as partnering, alliancing and relationship management contracts. This paper reports the findings of a survey undertaken with a private organisation based on an alliance project during its design stage, identifying the critical factors that influence the success of the alliance project. Legal aspects focusing on dispute resolution in alliancing are also highlighted.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The construction industry is dynamic in nature. The concept of project success has remained ambiguously defined in the construction industry. Project success is almost the ultimate goal for every project. However, it means different things to different people. While some writers consider time, cost and quality as predominant criteria, others suggest that success is something more complex. The aim of this paper is to develop a framework for measuring success of construction projects. In this paper, a set of key performance indicators (KPIs), measured both objectively and subjectively are developed through a comprehensive literature review. The validity of the proposed KPIs is also tested by three case studies. Then, the limitations of the suggested KPIs are discussed. With the development of KPIs, a benchmark for measuring the performance of a construction project can be set. It also provides significant insights into developing a general and comprehensive base for further research.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – Virtual prototyping technologies linked to building information models are commonplace within the aeronautical and automotive industries. Their use within the construction industry is now emerging. The purpose of this paper is to show how these technologies have been adopted on the pre-tender planning for a typical construction project. Design/methodology/approach – The research methodology taken was an “action research” approach where the researchers and developers were actively involved in the production of the virtual prototypes on behalf of the contractor thereby gaining consistent access to the decisions of the planning staff. The experiences from the case study were considered together with similar research on other construction projects. Findings – The findings from the case studies identify the role of virtual prototyping in components modelling, site modelling, construction equipment modelling, temporary works modelling, construction method visualization and method verification processes. Originality/value – The paper presents a state-of-the-art review and discusses the implications for the tendering process as these technologies are adopted. The adoption of the technologies will lead to new protocols and changes in the procurement of buildings and infrastructure.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Executive Summary The objective of this report was to use the Sydney Opera House as a case study of the application of Building Information Modelling (BIM). The Sydney opera House is a complex, large building with very irregular building configuration, that makes it a challenging test. A number of key concerns are evident at SOH: • the building structure is complex, and building service systems - already the major cost of ongoing maintenance - are undergoing technology change, with new computer based services becoming increasingly important. • the current “documentation” of the facility is comprised of several independent systems, some overlapping and is inadequate to service current and future services required • the building has reached a milestone age in terms of the condition and maintainability of key public areas and service systems, functionality of spaces and longer term strategic management. • many business functions such as space or event management require up-to-date information of the facility that are currently inadequately delivered, expensive and time consuming to update and deliver to customers. • major building upgrades are being planned that will put considerable strain on existing Facilities Portfolio services, and their capacity to manage them effectively While some of these concerns are unique to the House, many will be common to larger commercial and institutional portfolios. The work described here supported a complementary task which sought to identify if a building information model – an integrated building database – could be created, that would support asset & facility management functions (see Sydney Opera House – FM Exemplar Project, Report Number: 2005-001-C-4 Building Information Modelling for FM at Sydney Opera House), a business strategy that has been well demonstrated. The development of the BIMSS - Open Specification for BIM has been surprisingly straightforward. The lack of technical difficulties in converting the House’s existing conventions and standards to the new model based environment can be related to three key factors: • SOH Facilities Portfolio – the internal group responsible for asset and facility management - have already well established building and documentation policies in place. The setting and adherence to well thought out operational standards has been based on the need to create an environment that is understood by all users and that addresses the major business needs of the House. • The second factor is the nature of the IFC Model Specification used to define the BIM protocol. The IFC standard is based on building practice and nomenclature, widely used in the construction industries across the globe. For example the nomenclature of building parts – eg ifcWall, corresponds to our normal terminology, but extends the traditional drawing environment currently used for design and documentation. This demonstrates that the international IFC model accurately represents local practice for building data representation and management. • a BIM environment sets up opportunities for innovative processes that can exploit the rich data in the model and improve services and functions for the House: for example several high-level processes have been identified that could benefit from standardized Building Information Models such as maintenance processes using engineering data, business processes using scheduling, venue access, security data and benchmarking processes using building performance data. The new technology matches business needs for current and new services. The adoption of IFC compliant applications opens the way forward for shared building model collaboration and new processes, a significant new focus of the BIM standards. In summary, SOH current building standards have been successfully drafted for a BIM environment and are confidently expected to be fully developed when BIM is adopted operationally by SOH. These BIM standards and their application to the Opera House are intended as a template for other organisations to adopt for the own procurement and facility management activities. Appendices provide an overview of the IFC Integrated Object Model and an understanding IFC Model Data.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Objectives The procurement research of Sydney Opera House FM Exemplar Project aims to develop innovative methods and guidelines for the procurement of FM services, applicable to iconic and / or performing arts centre facilities, or facilities with similar FM functions. The initial procurement report in June 2005 analysed the strategic objectives and operational requirements that provide ‘demand statements’ as evaluation criteria in the service procurement process. The subsequent interim procurement report in September 2005 discussed the elements contributing to the criteria for decision-making in the service procurement process. This procurement report concentrates on the research on procurement strategies and innovative methods using a case study approach. The objectives of this report are: • to investigate service procurement methods and process in iconic and/or performing arts centre facilities; • to showcase FM innovation in Sydney Opera House through a case study; • to establish a preliminary decision-making framework and guidelines for selection of appropriate FM procurement routes to provide a useful model for FM community. Findings Findings from this procurement research are presented as follows. • FM innovation and experience of Sydney Opera House • Innovative procurement methods and processes, drawn from a case study of Sydney Opera House as exemplar • An integrated performance framework to link maintenance service functions to high level organisational objective and strategies • Procurement methods and contract outcomes, focusing on building maintenance and cleaning services of Sydney Opera House • Multi-dimensional assessment of Service Providers • General decision-making strategies and guidelines for selection of appropriate FM procurement routes Further Research Whilst the Sydney Opera House case study emphasises the experience of Sydney Opera House, a study of procurement strategies and methods from published research and FM good practice will supply facilities managers with alternative procurement routes. Further research on the procurement theme will develop a final decision-making model for the procurement of FM services, drawn from the evaluation of the case study outcomes, as well as FM good practice and findings from current published research.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This report draws together the key findings from six case studies on the subject of ebusiness Adoption in Construction conducted in Australia by the University of Newcastle (UON) and Royal Melbourne Institute of Technology (RMIT) from 2005 through to mid-2006 under the auspices of the Cooperative Research Centre for Construction Innovation (CRC_CI). Reference to this timing is important because one of the key themes to emerge from the study is that the take-up of e-business is a dynamic phenomenon within the construction industry.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Trying to innovate or wanting to? Making a start is the most difficult step on any journey. Whether trying to innovate for the first time, or seeking improvements on current performance, organisations are confronted with a plethora of options. Innovate now! makes action easier by presenting some of the key considerations for improving innovation performance. This guide has been based on the outcomes of a survey and case studies conducted between 2003 and 2005 in the Australian property and construction industry and therefore contains unique and up-to-date information, examples and suggestions tailored specifically to your industry needs. The large-scale industry survey and 12 innovation case studies on which this guide are based were carried out by The BRITE (Building Research, Innovation, Technology and Environment) Project as part of research for the Cooperative Research Centre for Construction Innovation. The stakeholders volunteering to take part in BRITE research included over 400 businesses, 14 government organisations, 8 industry associations and 4 universities.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This project is an extension of a previous CRC project (220-059-B) which developed a program for life prediction of gutters in Queensland schools. A number of sources of information on service life of metallic building components were formed into databases linked to a Case-Based Reasoning Engine which extracted relevant cases from each source.