934 resultados para Building sites--Planning
Resumo:
Michigan State University and OER Africa are creating a win-win collaboration of existing organizations for African publishing, localizing, and sharing of teaching and learning materials that fill critical resource gaps in African MSc agriculture curriculum. By the end of the 18-month planning and pilot initiative, African agriculture universities, faculty, students, researchers, NGO leaders, extension staff, and farmers will participate in building AgShare by demonstrating its benefits and outcomes and by building momentum and support for growth.
Resumo:
HTPSELEX is a public database providing access to primary and derived data from high-throughput SELEX experiments aimed at characterizing the binding specificity of transcription factors. The resource is primarily intended to serve computational biologists interested in building models of transcription factor binding sites from large sets of binding sequences. The guiding principle is to make available all information that is relevant for this purpose. For each experiment, we try to provide accurate information about the protein material used, details of the wet lab protocol, an archive of sequencing trace files, assembled clone sequences (concatemers) and complete sets of in vitro selected protein-binding tags. In addition, we offer in-house derived binding sites models. HTPSELEX also offers reasonably large SELEX libraries obtained with conventional low-throughput protocols. The FTP site contains the trace archives and database flatfiles. The web server offers user-friendly interfaces for viewing individual entries and quality-controlled download of SELEX sequence libraries according to a user-defined sequencing quality threshold. HTPSELEX is available from ftp://ftp.isrec.isb-sib.ch/pub/databases/htpselex/ and http://www.isrec.isb-sib.ch/htpselex.
Resumo:
In Switzerland, the issue of land consumption has made it to the front of the political agenda in recent years. Studies conducted on a national level have concluded that there is an excess of land zoned for construction (ARE, 2008), which is seen as contributing to urban sprawl. This situation is looked upon as a failure of the Federal Law on Spatial Planning (LAT, 1979) and there is a political push to change it in order to reinforce zoning regulations. In this article, we look on the issue from a different angle. While there may be large quantities of land zoned for construction, in many urban areas land actually available for development is scarce. Building on the idea that planning's efficiency is linked to its capacity of influencing actual land-use, we focus on how this situation can be dealt with within the current Swiss institutional context.
Resumo:
In Switzerland, the land management regime is characterized by a liberal attitude towards the institution of property rights, which is guaranteed by the Constitution. Under the present Swiss constitutional arrangement, authorities (municipalities) are required to take into account landowners' interests when implementing their spatial planning policy. In other words, the institution of property rights cannot be restricted easily in order to implement zoning plans and planning projects. This situation causes many problems. One of them is the gap between the way land is really used by the landowners and the way land should be used based on zoning plans. In fact, zoning plans only describe how landowners should use their property. There is no sufficient provision for handling cases where the use is not in accordance with zoning plans. In particular, landowners may not be expropriated for a non-conforming use of the land. This situation often leads to the opening of new building areas in greenfields and urban sprawl, which is in contradiction with the goals set into the Federal Law on Spatial Planning. In order to identify legal strategies of intervention to solve the problem, our paper is structured into three main parts. Firstly, we make a short description of the Swiss land management regime. Then, we focus on an innovative land management approach designed to implement zoning plans in accordance with property rights. Finally, we present a case study that shows the usefulness of the presented land management approach in practice. We develop three main results. Firstly, the land management approach brings a mechanism to involve landowners in planning projects. Coordination principle between spatial planning goals and landowners' interests is the cornerstone of all the process. Secondly, the land use is improved both in terms of space and time. Finally, the institution of property rights is not challenged, since there is no expropriation and the market stays free.
Resumo:
The Iowa Conservation and Preservation Consortium, Iowa Museum Association, the State Historical Society of Iowa and the State Library requested the IMLS CTC grant funds so we could develop a statewide plan to help the stewards of cultural property plan for protection and disaster recovery of collections. We are very pleased with the results of our grant activities. Thanks to the IMLS CTC grant over 200 Iowa collection care takers have received basic training in disaster preparedness and response, 24 care takers have signed up to become cultural collection first responders, a dozen disaster planning/response trainers are available upon request, and over 40 institutions have ReAct Paks. We have created a variety of training tools ranging from basic awareness to in-depth training, established a website of disaster resources, and geo-referenced hundreds of cultural collection sites around Iowa. In addition, the IMLS grant was just the motivator we needed to participate in other national/international efforts which in turn strengthened our IMLS grant project.
Resumo:
Iowa Code Section 216A.135 requires the Criminal and Juvenile Justice Planning Advisory Council (CJJPAC) to submit a long-range plan for Iowa's justice system to the Governor and General Assembly every five years. The Criminal and Juvenile Justice Advisory Council directed that the 2005 plan be developed with input from the public. A public hearing was held in September 2004, utilizing the Iowa Communications Network at five sites across Iowa. Using the information gained, the Council developed new goals and strategies and modified others from the 2000 plan. The 2005 Long Range Goals for Iowa’s Criminal and Juvenile Justice Systems, organized as follows, are meant to facilitate analyses and directions for justice system issues and concerns in Iowa.
Resumo:
En este trabajo se propone la construcción de un índice de calidad ocupacional (ICO) a partir de los datos de la Encuesta de Inserción Laboral de los Graduados de las Universidades Catalanas realizada por la Agencia para la Calidad del Sistema Universitario de Catalunya (AQU), que ha de permitir un mejor análisis de la información que proporciona la encuesta y facilitar su comparación con estudios similares. La encuesta se realiza tres años después de la graduación. En este artículo, se utiliza la segunda encuesta realizada el año 2005 entre 11.456 graduados (52,63%) de la promoción 2001 (AQU, 2005, Serra-Ramoneda, 2007). El índice se ha elaborado a partir de los indicadores objetivos ‘tipo y duración del contrato laboral’, ‘retribución económica’, ‘adecuación entre la formación universitaria y el empleo’ a los que se otorga una puntuación ponderada según las respuestas dadas por los graduados. La suma de las puntuaciones se matiza con un coeficiente derivado del indicador subjetivo ‘satisfacción con el trabajo en general’. A partir de la información proporcionada por el índice, se realiza un análisis comparativo del nivel de calidad ocupacional que han logrado los graduados de áreas de conocimiento, ámbitos de trabajo, ramas de actividad y ubicaciones territoriales del empleo diferentes. Los resultados obtenidos permiten observar que entre los graduados catalanes los siguientes hechos son buenos predictores de la calidad de la ocupación: haber estudiado una carrera que no sea de Humanidades, ser un hombre, haber desempeñado durante la carrera un trabajo relacionado con los estudios, estar ocupado en la construcción, en instituciones financieras o en servicios a empresas, haber tenido algún tipo de movilidad por motivos de trabajo, trabajar fuera de Cataluña y hacerlo en empresas grandes, especialmente con más de 500 trabajadores. Finalmente, se presentan algunas reflexiones y propuestas que pueden resultar de interés para la orientación de los estudiantes y la planificación universitaria
Resumo:
Transportation planners typically use census data or small sample surveys to help estimate work trips in metropolitan areas. Census data are cheap to use but are only collected every 10 years and may not provide the answers that a planner is seeking. On the other hand, small sample survey data are fresh but can be very expensive to collect. This project involved using database and geographic information systems (GIS) technology to relate several administrative data sources that are not usually employed by transportation planners. These data sources included data collected by state agencies for unemployment insurance purposes and for drivers licensing. Together, these data sources could allow better estimates of the following information for a metropolitan area or planning region: · Locations of employers (work sites); · Locations of employees; · Travel flows between employees’ homes and their work locations. The required new employment database was created for a large, multi-county region in central Iowa. When evaluated against the estimates of a metropolitan planning organization, the new database did allow for a one to four percent improvement in estimates over the traditional approach. While this does not sound highly significant, the approach using improved employment data to synthesize home-based work (HBW) trip tables was particularly beneficial in improving estimated traffic on high-capacity routes. These are precisely the routes that transportation planners are most interested in modeling accurately. Therefore, the concept of using improved employment data for transportation planning was considered valuable and worthy of follow-up research.
Resumo:
Ohjelmistotuotteen hallinta (SCM)on tärkeä osa ohjelmistoprojekteja. Se koostuu ohjelmistotuotteen hallinnan suunnittelusta, muutoksen hallinnasta, version hallinnasta, kääntämisestä, paketoinnista, kokoonpanon tilanteen seurannasta ja sen tarkistuksesta. Ohjelmistotuotteen hallintatietokanta (SCM DB) on tarkoitettu SCM:n liittyvändatan tallettamiseen yhteen paikkaan, jossa data on kaikkien löydettävissä. SCMDB on relaatiotietokanta ja WWW-käyttöliittymä sille. Tietokantaan talletetaan SCM - infrastruktuuri, SCM -resurssit, SCM -työskentelypaikat, integrointisuunnitteludata, paketoinnin raportit ja ohjeistukset, muutoksenhallintadata ja työkalujen hallintadata. Tietokannalla on monta käyttäjää. SCM managerit tallettavat tietokantaa yleiset tiedot, Integrointimanagerit tallettavat kantaan integrointisuunnitelmaa varten julkaisua koskevat tiedot. Paketointivastuulliset tallettavat kantaan paketointiraportit. Ohj elmistosuunnittelijat tekevät muutosvaatimuksia tietokantaan, jotka muutoksenhallintaelin käsittelee. He näkevät kannan kautta myös virheraportit. Työkalujen koordinointi tapahtuu myös kantaan talletettujen tietojen avulla. Lukemiseen tietokantaa voivat käyttää kaikki testauksesta suunnittelijoihin aikataulujen osalta. Tietokannasta voidaan lukea myös paketointityökalujen tallettamia tietoja ohjelmalohkoista eri pakettiversioissa. Paketointityökalut tai paketointivastuulliset saavat kannasta myös suoraan lähdetiedon paketointityökaluille.
Resumo:
In modem hitec industry Advanced Planning and Scheduling (APS) systems provide the basis for e-business solutions towards the suppliers and the customers. One objective of this thesis was to clarify the modem supply chain management with the APS systems and especially concentrate on the area of Collaborative Planning. In order Advanced Planning and Scheduling systems to be complete and usable, user interfaces are needed. Current Visual Basic user interfaces have faced many complaints and arguments from the users as well as from the development team. This thesis is trying to analyze the reasons and causes for the encountered problems and also provide ways to overcome them. The decision has been made to build the new user interfaces to be Web-enabled. Therefore another objective of this thesis was to research and find suitable technologies for building the Web-based user interfaces for Advanced Planning and Scheduling Systems in Nokia Demand/Supply Planning business area. Comparison between the most suitable technologies is made. Usability issues of Web-enabled user interfaces are also covered. The empirical part of the thesis includes design and implementation of a Web-based user interface with the chosen technology for a particular APS module that enables Collaborative Planning with suppliers.
Resumo:
Tutkielman tavoitteena on tarkastella uuden yritysidentiteetin suunnittelua ja käyttöönottoa maailmanlaajuisessa palveluyrityksessä. Tutkielma jakaantuu teoreettiseen ja empiiriseen osaan. Teoreettisessa osassa käsitellään yritysidentiteetin käsitettä sekä tarkastellaan uuden yritysidenteetin suunnittelua ja käyttöönottoa. Teoriaa tarkastellaan keskeisten kirjallisten lähteiden perusteella, jotka käsittelevät markkinoinnin johtamista, palveluyritystä, yritysidentiteettiä, imagoa ja brändiä. Empiirinen tarkastelu pohjautuu yritysesimerkkiin. Yritysesimerkkinä on maailmanlaajuinen palveluyritys, ja sen uuden yritysidentiteetin suunnittelu- ja lanseeraustoimenpiteet. Empiirinen aineisto perustuu markkinointipäälliköiden haastatteluihin Australiassa ja Suomessa sekä yrityksen sisäiseen suunnittelu- ja lanseerausmateriaaliin. Tutkielmassa tulee esille yritysidentiteettikäsitteen monimuotoisuus. Yritysidentiteetin rakentaminen lähtee visiosta, missiosta ja yrityksen tavoitteista, jotka pitää olla selkeät ja johdonmukaiset. Yritysidentiteetti käsittää visuaalisen ilmeen lisäksi kaikki ne prosessit, joissa ollaan tekemisissä sidosryhmien kanssa. Yritysidentiteetin rakentaminen ja ylläpitäminen vaatii, että jokainen liiketoimintafunktio ymmärtää yritysidenteetin sisällön ja toimii sen mukaisesti kaikissa tilanteissa. Yrityksen on viestittävä henkilöstölle ja ulkoisille sidosryhmilleen, miksi se on olemassa. Henkilöstön tulee ymmärtää yrityksen tapa toimia, jotta he pystyvät vastaamaan yrityksen asettamiin haasteisiin kohdatessaan asiakkaan. Uuden yritysidentiteetin suunnitteluun on panostettava. Onnistumisen edellytykseksi osoittautui, että suunnitellaan tarkasti toimenpiteet ennen käyttöönottoa, käyttöönoton aikana sekä käyttöönoton jälkeen.
Resumo:
This final project was made for the Broadband department of TeliaSonera. This project gives an overview on how internet service provider might build an access network so that they can offer triple-play services. It also gives information on what equipment is needed and what is required from the access, aggregation and edge networks. The project starts by describing the triple-play service. Then it moves on to optical fiber cables, the network technology and network architecture. At the end of the project there is an example of the process and construction of the access network. It will give an overview of the total process and problems that a network planner might face during the planning phase of the project. It will give some indication on how one area is built from the start to finish. The conclusion of the project presents some points that must be taken into consideration when building an access network. The building of an access network has to be divided to a time span of eight to ten years, where one year is one phase in the project. One phase is divided into three parts; Selecting the areas and targets, Planning the areas and targets, and Documentation. The example area gives indication on the planning of an area. It is almost impossible to connect all targets at the same time. This means that the service provider has to complete the construction in two or three parts. The area is considered to be complete when more than 80% of the real estates have fiber.
Resumo:
Today’s commercial web sites are under heavy user load and they are expected to be operational and available at all times. Distributed system architectures have been developed to provide a scalable and failure tolerant high availability platform for these web based services. The focus on this thesis was to specify and implement resilient and scalable locally distributed high availability system architecture for a web based service. Theory part concentrates on the fundamental characteristics of distributed systems and presents common scalable high availability server architectures that are used in web based services. In the practical part of the thesis the implemented new system architecture is explained. Practical part also includes two different test cases that were done to test the system's performance capacity.
Resumo:
A novel unsymmetric dinucleating ligand (LN3N4) combining a tridentate and a tetradentate binding sites linked through a m-xylyl spacer was synthesized as ligand scaffold for preparing homo- and dimetallic complexes, where the two metal ions are bound in two different coordination environments. Site-selective binding of different metal ions is demonstrated. LN3N4 is able to discriminate between CuI and a complementary metal (M′ = CuI, ZnII, FeII, CuII, or GaIII) so that pure heterodimetallic complexes with a general formula [CuIM′(LN3N4)]n+ are synthesized. Reaction of the dicopper(I) complex [CuI 2(LN3N4)]2+ with O2 leads to the formation of two different copper-dioxygen (Cu2O2) intermolecular species (O and TP) between two copper atoms located in the same site from different complex molecules. Taking advantage of this feature, reaction of the heterodimetallic complexes [CuM′(LN3N4)]n+ with O2 at low temperature is used as a tool to determine the final position of the CuI center in the system because only one of the two Cu2O2 species is formed
Resumo:
During recent years, mobile phone markets have changed significantly. Asian markets have become vital for the manufacturers with their millions of end users and multiple major mobile network operators. This has resulted in software development as global companies have research and development sites running in multiple locations, including Asia. The reasons behind this are not only in reducing labor costs but also in capitalizing on the local knowledge and knowhow. A ramp-up site has multiple effects in the software development and software release activities. This thesis focuses on representing the importance of software testing as part of software development process and highlighting issues that need to be considered during ramp-up activities. In addition this work tries to emphasize the importance of communication between parties and information gathering prior to setting up the ramp-up site. The output of this thesis was successful software testing site ramp-up within the set time limits. The quality of software testing work was assured and the ramp-up -project requirements were achieved.