878 resultados para Building information modeling (BIM)
Resumo:
From a construction innovation systems perspective, firms acquire knowledge from suppliers, clients, universities and institutional environment. Building information modelling (BIM) involves these firms using new process standards. To understand the implications on interactive learning using BIM process standards, a case study is conducted with the UK operations of a multinational construction firm. Data is drawn from: a) two workshops involving the firm and a wider industry group, b) observations of practice in the BIM core team and in three ongoing projects, c) 12 semi-structured interviews; and d) secondary publications. The firm uses a set of BIM process standards (IFC, PAS 1192, Uniclass, COBie) in its construction activities. It is also involved in a pilot to implement the COBie standard, supported by technical and management standards for BIM, such as Uniclass and PAS1192. Analyses suggest that such BIM process standards unconsciously shapes the firm's internal and external interactive learning processes. Internally standards allow engineers to learn from each through visualising 3D information and talking around designs with operatives to address problems during construction. Externally, the firm participates in trial and pilot projects involving other construction firms, government agencies, universities and suppliers to learn about the standard and access knowledge to solve its specific design problems. Through its BIM manager, the firm provides feedback to standards developers and information technology suppliers. The research contributes by articulating how BIM process standards unconsciously change interactive learning processes in construction practice. Further research could investigate these findings in the wider UK construction innovation system.
Resumo:
The building budgeting quickly and accurately is a challenge faced by the companies in the sector. The cost estimation process is performed from the quantity takeoff and this process of quantification, historically, through the analysis of the project, scope of work and project information contained in 2D design, text files and spreadsheets. This method, in many cases, present itself flawed, influencing the making management decisions, once it is closely coupled to time and cost management. In this scenario, this work intends to make a critical analysis of conventional process of quantity takeoff, from the quantification through 2D designs, and with the use of the software Autodesk Revit 2016, which uses the concepts of building information modeling for automated quantity takeoff of 3D model construction. It is noted that the 3D modeling process should be aligned with the goals of budgeting. The use of BIM technology programs provides several benefits compared to traditional quantity takeoff process, representing gains in productivity, transparency and assertiveness
Resumo:
The building budgeting quickly and accurately is a challenge faced by the companies in the sector. The cost estimation process is performed from the quantity takeoff and this process of quantification, historically, through the analysis of the project, scope of work and project information contained in 2D design, text files and spreadsheets. This method, in many cases, present itself flawed, influencing the making management decisions, once it is closely coupled to time and cost management. In this scenario, this work intends to make a critical analysis of conventional process of quantity takeoff, from the quantification through 2D designs, and with the use of the software Autodesk Revit 2016, which uses the concepts of building information modeling for automated quantity takeoff of 3D model construction. It is noted that the 3D modeling process should be aligned with the goals of budgeting. The use of BIM technology programs provides several benefits compared to traditional quantity takeoff process, representing gains in productivity, transparency and assertiveness
Resumo:
Le tecniche dell'informazione e i metodi della comunicazione hanno modificato il modo di redigere documenti destinati a trasmettere la conoscenza, in un processo che è a tutt'oggi in corso di evoluzione. Anche l'attività progettuale in ingegneria ed architettura, pure in un settore caratterizzato da una notevole inerzia metodologica e restio all'innovazione quale è quello dell'industria edilizia, ha conosciuto profonde trasformazioni in ragione delle nuove espressioni tecnologiche. Da tempo l'informazione necessaria per realizzare un edificio, dai disegni che lo rappresentano sino ai documenti che ne indicano le modalità costruttive, può essere gestita in maniera centralizzata mediante un unico archivio di progetto denominato IPDB (Integrated Project DataBase) pur essendone stata recentemente introdotta sul mercato una variante più operativa chiamata BIM (Building Information Modelling). Tuttavia l'industrializzazione del progetto che questi strumenti esplicano non rende conto appieno di tutti gli aspetti che vedono la realizzazione dell'opera architettonica come collettore di conoscenze proprie di una cultura progettuale che, particolarmente in Italia, è radicata nel tempo. La semantica della rappresentazione digitale è volta alla perequazione degli elementi costitutivi del progetto con l'obiettivo di catalogarne le sole caratteristiche fabbricative. L'analisi della letteratura scientifica pertinente alla materia mostra come non sia possibile attribuire ai metodi ed ai software presenti sul mercato la valenza di raccoglitori omnicomprensivi di informazione: questo approccio olistico costituisce invece il fondamento della modellazione integrata intesa come originale processo di rappresentazione della conoscenza, ordinata secondo il paradigma delle "scatole cinesi", modello evolvente che unifica linguaggi appartenenti ai differenti attori compartecipanti nei settori impiantistici, strutturali e della visualizzazione avanzata. Evidenziando criticamente i pregi e i limiti operativi derivanti dalla modellazione integrata, la componente sperimentale della ricerca è stata articolata con l'approfondimento di esperienze condotte in contesti accademici e professionali. Il risultato conseguito ha coniugato le tecniche di rilevamento alle potenzialità di "modelli tridimensionali intelligenti", dotati cioè di criteri discriminanti per la valutazione del relazionamento topologico dei componenti con l'insieme globale.
Resumo:
Building Information Modelling (BIM) provides a shared source of information about a built asset, which creates a collaborative virtual environment for project teams. Literature suggests that to collaborate efficiently, the relationship between the project team is based on sympathy, obligation, trust and rapport. Communication increases in importance when working collaboratively but effective communication can only be achieved when the stakeholders are willing to act, react, listen and share information. Case study research and interviews with Architecture, Engineering and Construction (AEC) industry experts suggest that synchronous face-to-face communication is project teams’ preferred method, allowing teams to socialise and build rapport, accelerating the creation of trust between the stakeholders. However, virtual unified communication platforms are a close second-preferred option for communication between the teams. Effective methods for virtual communication in professional practice, such as virtual collaboration environments (CVE), that build trust and achieve similar spontaneous responses as face-to-face communication, are necessary to face the global challenges and can be achieved with the right people, processes and technology. This research paper investigates current industry methods for virtual communication within BIM projects and explores the suitability of avatar interaction in a collaborative virtual environment as an alternative to face-to-face communication to enhance collaboration between design teams’ professional practice on a project. Hence, this paper presents comparisons between the effectiveness of these communication methods within construction design teams with results of further experiments conducted to test recommendations for more efficient methods for virtual communication to add value in the workplace between design teams.
Resumo:
It has been widely documented that when Building Information Modelling (BIM) is used, there is a shift in effort to the design phase. Little investigation into the impact of this shift in effort has been done and how it impacts on costs. It can be difficult to justify the increased expenditure on BIM in a market that is heavily driven by costs. There are currently studies attempting to quantify the return on investment (ROI) for BIM for which these returns can be seen to balance out the shift in efforts and costs to the design phase. The studies however quantify the ROI based on the individual stakeholder’s investment without consideration for the impact that the use of BIM from their project partners may have on their own profitability. In this study, a questionnaire investigated opinions and experience of construction professionals, representing clients, consultants, designers and contractors, to determine fluctuations in costs by their magnitude and when they occur. These factors were examined more closely by interviewing senior members representing each of the stakeholder categories and comparing their experience in using BIM within environments where their project partners were also using BIM and when they were not. This determined the differences in how the use and the investment in BIM impacts on others and how costs are redistributed. This redistribution is not just through time but also between stakeholders and categories of costs. Some of these cost fluctuations and how the cost of BIM is currently financed are also highlighted in several case studies. The results show that the current distribution of costs set for traditional 2D delivery is hindering the potential success of BIM. There is also evidence that stakeholders who don’t use BIM may benefit financially from the BIM use of others and that collaborative BIM is significantly different to the use of ‘lonely’ BIM in terms of benefits and profitability.
Resumo:
PAS1192-2 (2013) outlines the “fundamental principles of Level 2 information modeling”, one of these principles is the use of what is commonly referred to as a Common Data Environment (CDE). A CDE could be described as an internet-enabled cloudhosting platform, accessible to all construction team members to access shared project information. For the construction sector to achieve increased productivity goals, the next generation of industry professionals will need to be educated in a way that provides them with an appreciation of Building Information Modelling (BIM) working methods, at all levels, including an understanding of how data in a CDE should be structured, managed, shared and published. This presents a challenge for educational institutions in terms of providing a CDE that addresses the requirements set out in PAS1192-2, and mirrors organisational and professional working practices without causing confusion due to over complexity. This paper presents the findings of a two-year study undertaken at Ulster University comparing the use of a leading industry CDE platform with one derived from the in-house Virtual Learning Environment (VLE), for the delivery of a student BIM project. The research methodology employed was a qualitative case study analysis, focusing on observations from the academics involved and feedback from students. The results of the study show advantages for both CDE platforms depending on the learning outcomes required.
Resumo:
Integrated project delivery (IPD) method has recently emerged as an alternative to traditional delivery methods. It has the potential to overcome inefficiencies of traditional delivery methods by enhancing collaboration among project participants. Information and communication technology (ICT) facilitates IPD by effective management, processing and communication of information within and among organizations. While the benefits of IPD, and the role of ICT in realizing them, have been generally acknowledged, the US public construction sector is very slow in adopting IPD. The reasons are - lack of experience and inadequate understanding of IPD in public owner as confirmed by the results of the questionnaire survey conducted under this research study. The public construction sector should be aware of the value of IPD and should know the essentials for effective implementation of IPD principles - especially, they should be cognizant of the opportunities offered by advancements in ICT to realize this.^ In order to address the need an IPD Readiness Assessment Model (IPD-RAM) was developed in this research study. The model was designed with a goal to determine IPD readiness of a public owner organization considering selected IPD principles, and ICT levels, at which project functions were carried out. Subsequent analysis led to identification of possible improvements in ICTs that have the potential to increase IPD readiness scores. Termed as the gap identification, this process was used to formulate improvement strategies. The model had been applied to six Florida International University (FIU) construction projects (case studies). The results showed that the IPD readiness of the organization was considerably low and several project functions can be improved by using higher and/or advanced level ICT tools and methods. Feedbacks from a focus group comprised of FIU officials and an independent group of experts had been received at various stages of this research and had been utilized during development and implementation of the model. Focus group input was also helpful for validation of the model and its results. It was hoped that the model developed would be useful to construction owner organizations in order to assess their IPD readiness and to identify appropriate ICT improvement strategies.^
Resumo:
Integrated project delivery (IPD) method has recently emerged as an alternative to traditional delivery methods. It has the potential to overcome inefficiencies of traditional delivery methods by enhancing collaboration among project participants. Information and communication technology (ICT) facilitates IPD by effective management, processing and communication of information within and among organizations. While the benefits of IPD, and the role of ICT in realizing them, have been generally acknowledged, the US public construction sector is very slow in adopting IPD. The reasons are - lack of experience and inadequate understanding of IPD in public owner as confirmed by the results of the questionnaire survey conducted under this research study. The public construction sector should be aware of the value of IPD and should know the essentials for effective implementation of IPD principles - especially, they should be cognizant of the opportunities offered by advancements in ICT to realize this. In order to address the need an IPD Readiness Assessment Model (IPD-RAM) was developed in this research study. The model was designed with a goal to determine IPD readiness of a public owner organization considering selected IPD principles, and ICT levels, at which project functions were carried out. Subsequent analysis led to identification of possible improvements in ICTs that have the potential to increase IPD readiness scores. Termed as the gap identification, this process was used to formulate improvement strategies. The model had been applied to six Florida International University (FIU) construction projects (case studies). The results showed that the IPD readiness of the organization was considerably low and several project functions can be improved by using higher and/or advanced level ICT tools and methods. Feedbacks from a focus group comprised of FIU officials and an independent group of experts had been received at various stages of this research and had been utilized during development and implementation of the model. Focus group input was also helpful for validation of the model and its results. It was hoped that the model developed would be useful to construction owner organizations in order to assess their IPD readiness and to identify appropriate ICT improvement strategies.
Resumo:
Il Building Information Modelling nasce da un processo di integrazione sostenibile, basato sull'interoperabilità dei processi. La caratteristica vincente è la circolarietà delle informazioni: ogni informazione è gestita come parametro di un ricco e complesso modello parametrico dell'edificio; la geometria, i materiali, i costi ed i tempi sono gestiti come parametri internamente collegati e quindi variabili di uno stesso sistema. Nel caso di beni storici, la maggior parte degli edifici possiede vincoli intrinseci che influenzano tali parametri. I materiali non possono essere scelti liberamente, in quanto parte di un organismo esistente, la geometria dell'edificio è definita e difficilmente sarà variata negli interventi di recupero. Nella presente tesi si applica il metodo CLOUD2FEM al mondo dell'Historic Building Information Modelling (HBIM) concentrandosi sullo studio della Rocca Estense di San Felice sul Panaro, colpita dal sisma dell'Emilia e attualmente inagibile. La procedura CLOUD2FEM permette di trasformare le informazioni ricavate dal laser scanner in mesh chiuse e regolari, generando in modo semi-automatico un modello FEM 3D. Nel caso di costruzioni complesse, la cui geometria non può essere ricondotta a modelli semplificati, è necessario valutare l'attendibilità del modello strutturale. Nel caso in esame, la validazione è stata condotta mediante il confronto del danno rilevato con il danno simulato. La flessibilità del modello permette di aggiungere dettagli inizialmente non rilevati: ogni informazione è inserita nel modello attraverso un parametro differente, al fine di eseguire analisi sullo stato di fatto e su futuri stati di progetto con semplice aggiornamento dei parametri.
Resumo:
In knowledge technology work, as expressed by the scope of this conference, there are a number of communities, each uncovering new methods, theories, and practices. The Library and Information Science (LIS) community is one such community. This community, through tradition and innovation, theories and practice, organizes knowledge and develops knowledge technologies formed by iterative research hewn to the values of equal access and discovery for all. The Information Modeling community is another contributor to knowledge technologies. It concerns itself with the construction of symbolic models that capture the meaning of information and organize it in ways that are computer-based, but human understandable. A recent paper that examines certain assumptions in information modeling builds a bridge between these two communities, offering a forum for a discussion on common aims from a common perspective. In a June 2000 article, Parsons and Wand separate classes from instances in information modeling in order to free instances from what they call the “tyranny” of classes. They attribute a number of problems in information modeling to inherent classification – or the disregard for the fact that instances can be conceptualized independent of any class assignment. By faceting instances from classes, Parsons and Wand strike a sonorous chord with classification theory as understood in LIS. In the practice community and in the publications of LIS, faceted classification has shifted the paradigm of knowledge organization theory in the twentieth century. Here, with the proposal of inherent classification and the resulting layered information modeling, a clear line joins both the LIS classification theory community and the information modeling community. Both communities have their eyes turned toward networked resource discovery, and with this conceptual conjunction a new paradigmatic conversation can take place. Parsons and Wand propose that the layered information model can facilitate schema integration, schema evolution, and interoperability. These three spheres in information modeling have their own connotation, but are not distant from the aims of classification research in LIS. In this new conceptual conjunction, established by Parsons and Ward, information modeling through the layered information model, can expand the horizons of classification theory beyond LIS, promoting a cross-fertilization of ideas on the interoperability of subject access tools like classification schemes, thesauri, taxonomies, and ontologies. This paper examines the common ground between the layered information model and faceted classification, establishing a vocabulary and outlining some common principles. It then turns to the issue of schema and the horizons of conventional classification and the differences between Information Modeling and Library and Information Science. Finally, a framework is proposed that deploys an interpretation of the layered information modeling approach in a knowledge technologies context. In order to design subject access systems that will integrate, evolve and interoperate in a networked environment, knowledge organization specialists must consider a semantic class independence like Parsons and Wand propose for information modeling.
Resumo:
Questa tesi di laurea si pone l’obiettivo di investigare alcune delle nuove frontiere offerte dalla crescita sincretica e multidisciplinare dei linguaggi digitali applicati all’architettura e ai beni culturali. Si approfondiranno i concetti teorici fondamentali dell’informazione digitale: il web semantico come ambiente di scambio, i metadata come informazioni sui dati, i LOD (Link Open Data) come standard e fine. Per l’ambito dei beni culturali verranno presentati i temi di ricerca e sviluppo nel campo della catalogazione e fruizione digitali: ontologie, dizionari normalizzati aperti, database (Catalogo Digitale), etc. Per l’ambito edilizio-architettonico verrà introdotto l’Heritage Building Information Modeling (HBIM) semantico come metodologia multidisciplinare focalizzata su rilievo geometrico, modellazione, archiviazione e scambio di tutte le informazioni utili alla conoscenza e conservazione dei beni storici. Il punto d’incontro tra i due mondi è individuato nella possibilità di arricchire le geometrie attraverso la definizione di una semantica (parametri-metadati) relazionata alle informazioni (valori-dati) presenti nei cataloghi digitali, creando di fatto un modello 3D per architetture storiche con funzione di database multidisciplinare. Sarà presentata la piattaforma web-based Inception, sviluppata dall’omonima startup incubata come spinoff dall’Università di Ferrara, che, tra le diverse applicazioni e potenzialità, verrà utilizzata come strumento per la condivisione e fruizione, garantendo la possibilità di interrogare geometrie e metadati in continuità con i principi LOD. Verrà definito un workflow generale (procedure Scan2BIM, modellazione geometrica, definizione script per l’estrazione automatica dei dati dal Catalogo Digitale, associazione dati-geometrie e caricamento in piattaforma) successivamente applicato e adattato alle precise necessità del caso studio: la Chiesa di S. Maria delle Vergini (MC), su commissione dell’ICCD referente al MiBACT.
Resumo:
The aim of this thesis is to use the developments, advantages and applications of "Building Information Modelling" (BIM) with emphasis on the discipline of structural design for steel building located in Perugia. BIM was mainly considered as a new way of planning, constructing and operating buildings or infrastructures. It has been found to offer greater opportunities for increased efficiency, optimization of resources and generally better management throughout the life cycle of a facility. BIM increases the digitalization of processes and offers integrated and collaborative technologies for design, construction and operation. To understand BIM and its benefits, one must consider all phases of a project. Higher initial design costs often lead to lower construction and operation costs. Creating data-rich digital models helps to better predict and coordinate the construction phases and operation of a building. One of the main limitations identified in the implementation of BIM is the lack of knowledge and qualified professionals. Certain disciplines such as structural and mechanical design depend on whether the main contractor, owner, general contractor or architect need to use or apply BIM to their projects. The existence of a supporting or mandatory BIM guideline may then eventually lead to its adoption. To test the potential of the BIM adoption in the steel design process, some models were developed taking advantage of a largely diffuse authoring software (Autodesk Revit), to produce construction drawings and also material schedule that were needed in order to estimate quantities and features of a real steel building. Once the model has been built the whole process has been analyzed and then compared with the traditional design process of steel structure. Many relevant aspect in term of clearness and also in time spent were shown and lead to final conclusions about the benefits from BIM methodology.