954 resultados para Brisbane City Hall


Relevância:

100.00% 100.00%

Publicador:

Resumo:

General note: Title and date provided by Bettye Lane.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

General note: Title and date provided by Bettye Lane.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

General note: Title and date provided by Bettye Lane.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

General note: Title and date provided by Bettye Lane.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

General note: Title and date provided by Bettye Lane.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

General note: Title and date provided by Bettye Lane.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

General note: Title and date provided by Bettye Lane.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

General note: Title and date provided by Bettye Lane.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

General note: Title and date provided by Bettye Lane.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Inscriptions: Verso: [stamped] Photograph by Freda Leinwand. [463 West Street, Studio 229G, New York, NY 10014].

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Inscriptions: Verso: [stamped] Photograph by Freda Leinwand. [463 West Street, Studio 229G, New York, NY 10014].

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This project proposes two possible solutions for the phasing plan of the intersection near the City Hall of Leiria and presents the calculations of the cycle length and the intersection delay for both of them. The main goal of these solutions is to optimize the global functioning of the intersection. Since the number of cars that use an intersection is will fluctuate with time, when using pre-timed traffic lights, adjustments are needed to the settings of the traffic signals, to assure the accommodation of the present traffic flows in the intersection under acceptable conditions for drivers.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

As the society matures, there was an increasing pressure to preserve historic buildings. The economic cost in maintaining these important heritage legacies has become the prime consideration of every state. Dedicated intelligent monitoring systems supplementing the traditional building inspections will enable the stakeholder to carry out not only timely reactive response but also plan the maintenance in a more vigilant approach; thus, preventing further degradation which was very costly and difficult to address if neglected. The application of the intelligent structural health monitoring system in this case studies of ‘modern heritage’ buildings is on its infancy but it is an innovative approach in building maintenance. ‘Modern heritage’ buildings were the product of technological change and were made of synthetic materials such as reinforced concrete and steel. Architectural buildings that was very common in Oceania and The Pacific. Engineering problems that arose from this type of building calls for immediate engineering solution since the deterioration rate is exponential. The application of this newly emerging monitoring system will improve the traditional maintenance system on heritage conservation. Savings in time and resources can be achieved if only pathological results were on hand. This case study will validate that approach. This publication will serve as a position paper to the on-going research regarding application of (Structural Health Monitoring) SHM systems to heritage buildings in Brisbane, Australia. It will be investigated with the application of the SHM systems and devices to validate the integrity of the recent structural restoration of the newly re-strengthened heritage building, the Brisbane City Hall.