947 resultados para BEAVER DAM
Resumo:
Survey map of the land for the Mill Scibes Grand River Dam. Created by The Welland Canal Company. Included is a drawing of the land. Noteable features include; Sulphur Creek, post, bridge, Grand River, lot divisions, inside face of embankment. Surveyor notes are seen in pencil on the map.
Resumo:
A speech by Sean O'Sullivan, given in the House of Commons, "For the Recognition of the Beaver as a Symbol of the Sovereignty of the Dominion of Canada".
Resumo:
A photograph with the caption, "LaChasse dam looking from river to Lake LaChasse".
Resumo:
A photograph of the construction of the dam at Lake LaChasse.
Resumo:
Cross sections of Lyons Creek from Cooks Mills Dam to culvert (9 pages of charts, graphs and text, handwritten). This is signed by Fred Holmes, May 1857.
Resumo:
Copy (photocopied) of newspaper clipping entitled “Canada’s First Social Club” about the Beaver Club at the North-West Fur Company, Montreal. This item has been taped together. Text is not affected, n.d.
Resumo:
This presentation was the product of an invitation to speak at a symposium for students and faculty from a variety of different non-law departments at the University of Tennessee, where in 1973 I had started what became a six-year legal campaign to divert the Tennessee Valley Authority from impounding the last flowing 33 miles of the Little Tennessee River behind TVA’s Tellico Dam.
Resumo:
This thesis Entitled Post-Environmental Evaluation of The Rajjaprabha Dam In Thailand. This post evaluation of environmental consequences of Rajjaprabha dam IS conducted ten years after its commencement. The Rajjaprabha dam project was planned and implemented as a multipurpose project, mainly for hydropower production, flood protection, fisheries, recreation and irrigation. The project includes the dam and reservoir with a 240 MW hydropower plant located about 90 km upstream from Surat Thani province, and irrigation systems covering the coastal plain in Surat Thani. The upstream storage reservoir (with about 5,639 mcm storage) and the hydropower plant had already been implemented. The first phase of irrigation system covers an area of 23,100 hectares. The second phase is envisaged to cover about 50,000 hectares. This study was conducted with the following objectives: (I) to assess all existing environmental resources and their values with the help of input-output analysis (2) to findout the beneficial impacts of the project (3) to evaluate the actual positive effects vis-a-vis the estimated effects before the project was implemented and (4) to identify all significant changes in relatives to the impacts previously assessed. The study area includes the Phum Duang river basin of about 4,668 km2 (placed on the areas that are upstream and downstream to the damsite), The duration of study is limited to 10 years after the dam has become operational i.e. from 1987-1997. The results of the study reveal that there is no significant changes in climatic and ground water resources, with respect to the study area inspte of the fact that the physical and chemical properties of the soil have slightly changed. Sedimentation in the reservoir does not have much effect on the function of the dam.
Resumo:
In dam inspection tasks, an underwater robot has to grab images while surveying the wall meanwhile maintaining a certain distance and relative orientation. This paper proposes the use of an MSIS (mechanically scanned imaging sonar) for relative positioning of a robot with respect to the wall. An imaging sonar gathers polar image scans from which depth images (range & bearing) are generated. Depth scans are first processed to extract a line corresponding to the wall (with the Hough transform), which is then tracked by means of an EKF (Extended Kalman Filter) using a static motion model and an implicit measurement equation associating the sensed points to the candidate line. The line estimate is referenced to the robot fixed frame and represented in polar coordinates (rho&thetas) which directly corresponds to the actual distance and relative orientation of the robot with respect to the wall. The proposed system has been tested in simulation as well as in water tank conditions
Resumo:
This paper presents a complete control architecture that has been designed to fulfill predefined missions with an autonomous underwater vehicle (AUV). The control architecture has three levels of control: mission level, task level and vehicle level. The novelty of the work resides in the mission level, which is built with a Petri network that defines the sequence of tasks that are executed depending on the unpredictable situations that may occur. The task control system is composed of a set of active behaviours and a coordinator that selects the most appropriate vehicle action at each moment. The paper focuses on the design of the mission controller and its interaction with the task controller. Simulations, inspired on an industrial underwater inspection of a dam grate, show the effectiveness of the control architecture
Resumo:
Descripció i anàlisi del sistema de funcionament de justícia juvenil en medi obert, i concretament la metodologia de treball dels DAM, per tal d’evidenciar les competències requerides a l’hora de desenvolupar l’exercici professional d’educador social com a DAM, tot exposant una anàlisi de la formació acadèmica impartida al llarg de la diplomatura d’Educació Social en relació a aquests requeriments
Resumo:
Sediments play a fundamental role in the behaviour of contaminants in aquatic systems. Various processes in sediments, eg adsorption-desorption, oxidation-reduction, ion exchange or biological activities, can cause accumulation or release of metals and anions from the bottom of reservoirs, and have been recently studied in Polish waters [1-3]. Sediment samples from layer A: (1 divided by 6 cm depth in direct contact with bottom water); layer B: (7 divided by 12 cm depth moderate contact); and layer C: (12+ cm depth, in theory an inactive layer) were collected in September 2007 from six sites representing different types of hydrological conditions along the Dobczyce Reservoir (Fig. l). Water depths at the sampling points varied from 3.5 to 21 m. We have focused on studying the distribution and accumulation of several heavy metals (Cr, Pb, Cd, Cu and Zn) in the sediments. The surface, bottom and pore water (extracted from sediments by centrifugation) samples were also collected. Possible relationships between the heavy-metal distribution in sediments and the sediment characteristics (mineralogy, organic matter) as well as the Fe, Mn and Ca content of sediments, have been studied. The 02 concentrations in water samples were also measured. The heavy metals in sediments ranged from 19.0 to 226.3 mg/kg of dry mass (ppm). The results show considerable variations in heavy-metal concentrations between the 6 stations, but not in the individual layers (A, B, C). These variations are related to the mineralogy and chemical composition of the sediments and their pore waters.
Resumo:
A previously undescribed, Gram-positive, catalase-negative, Streptococcus-like organism originating from a European beaver (Castor fiber) was subjected to a taxonomic study. The organism displayed beta-haemolytic activity and gave a positive reaction with Lancefield group A antisera. Based on the results of biochemical testing, the organism was tentatively identified as a member of the genus Streptococcus, but it did not correspond phenotypically to any recognized species of this genus. Comparative 16S rRNA gene sequencing studies confirmed this assignment, with the bacterium forming a hitherto unknown subline within the genus. Sequence divergence values of greater than 3% from other reference streptococcal species, however, demonstrated that the unidentified coccus-shaped organism represents a hitherto unknown species. Based on phenotypic and molecular phylogenetic evidence, it is therefore proposed that the unknown organism from a beaver be classified as a novel species, Streptococcus castoreus sp. nov. The type strain is M605815/03/2(T) (=CCUG 48115(T) = CIP 108205(T)).
Resumo:
Solutions of a two-dimensional dam break problem are presented for two tailwater/reservoir height ratios. The numerical scheme used is an extension of one previously given by the author [J. Hyd. Res. 26(3), 293–306 (1988)], and is based on numerical characteristic decomposition. Thus approximate solutions are obtained via linearised problems, and the method of upwind differencing is used for the resulting scalar problems, together with a flux limiter for obtaining a second order scheme which avoids non-physical, spurious oscillations.