899 resultados para Arbitrate Contract
Resumo:
The Child Care (Amendment) Bill was passed by the Seanad on 6th May 2010 and will shortly be enacted as legislation as the Child Care (Amendment) Act, 2010. The Bill, consisting of six Parts amends existing legislation relating to secure or ‘special care’ and makes some further amendments to the Child Care Act, 1991. The Act also provides for the dissolution of the Children Acts Advisory Board, a statutory body established in 2003, whose function was to advise the Minister on policy relating to specialist residential services (specifically Special Care Units) . This article examines the provisions of the Child Care Bill (2009) setting these in the context of current policy and previous legislation. It outlines that while the legislation outlines a detailed process for the application and administration of Special Care Orders, the provisions are weakened by the removal of external oversight mechanisms and the limitations placed on the role of the Guardian ad Litem.
Resumo:
English law has long struggled to understand the effect of a fundamental common mistake in contract formation. Bell v Lever Brothers Ltd [1932] AC 161 recognises that a common mistake which totally undermines a contract renders it void. Solle v Butcher [1950] 1 KB 671 recognises a doctrine of 'mistake in equity' under which a serious common mistake in contract formation falling short of totally undermining the contract could give an adversely affected party the right to rescind the contract. This article accepts that the enormous difficulty in differentiating these two kinds of mistake justifies the insistence by the Court of Appeal in The Great Peace [2003] QB 679 that there can be only one doctrine of common mistake. However, the article proceeds to argue that where the risk of the commonly mistaken matter is not allocated by the contract itself a better doctrine would be that the contract is voidable.
Resumo:
Molluscan FMRFamide and two recently discovered platyhelminth FMRFamide-related peptides (FaRPs), GNFFRFamide from the cestode Moniezia expansa and RYIRFamide from the terrestrial turbellarian Artioposthia triangulata, cause dose-dependent contractions of individual muscle fibres from Schistosoma mansoni in vitro. The most potent FaRP tested was the turbellarian peptide RYIRFamide, which produced a concentration-dependent effect between 10(-9) and 10(-7) M. FMRFamide and GNFFRFamide were less potent, inducing contractions between 10(-8)-10(-6) M and 10(-7)-10(-5) M respectively. The contractile effect of each of these peptides was blocked by the presence of 1 mu M FMR-D-Famide. FMRF free acid did not elicit contraction of the muscle fibres. The FaRP-induced contractions did not occur if the Ca2+ was omitted and 0.5 mu M EGTA. was added to the extracellular medium. The FaRP-induced contractions were not blocked by the Ca2+ channel blockers nicardipine, verapamil or diltiazem, although high Kf-induced contractions of these fibres were blocked by nicardipine. These data indicate the presence of FaRP receptors on schistosome muscle fibres and demonstrate their ability to mediate muscle contraction. The action of these endogenous flatworm peptides on schistosome muscle is the first demonstration of a direct excitatory effect of any putative neurotransmitter on the muscle of a flatworm, and establishes a role for FaRPs in neuromuscular transmission in trematodes. In addition, it provides the first evidence that the peptidergic nervous system is a rational target for chemotherapeutic attack in parasitic platyhelmiths.
Resumo:
Purpose: To assess the quality of referrals from community optometrists in the northeast of Scotland to the hospital glaucoma service before and after the implementation of the new General Ophthalmic Services (GOS) contract in Scotland. Methods: Retrospective study encompassing two 6-month periods, one before the implementation of the new GOS (Scotland) contract in April 2006 (from June to November 2005), and the other after (from June to November 2006). The community optometrist referral forms and hospital glaucoma service notes were reviewed. Comparisons were performed using the t-test and ?- test. Results: In all, 183 referrals were made during the first 6-month period from June to November 2005, and 120 referrals were made during the second 6-month period from June to November 2006. After the introduction of the new GOS contract, there was a statistically significant increase in true-positive referrals (from 18.0 to 31.7%; P=0.006), decrease in false-positive referrals (from 36.6 to 31.7%; P=0.006), and increase in the number of referrals with information on applanation tonometry (from 11.8 to 50.0%; P=0.000), dilated fundal examination (from 2.2 to 24.2%; P=0.000), and repeat visual fields (from 14.8 to 28.3%; P=0.004) when compared to the first 6-month period. However, only 41.7% of referrals fulfilled the new GOS contract requirements, with information on applanation tonometry the most commonly missing. Conclusions: After the implementation of the new GOS (Scotland) contract in April 2006, there has been an improvement in the quality of the glaucoma referrals from the community optometrists in the northeast of Scotland, with a corresponding reduction in false-positive referrals. Despite the relatively positive effect so far, there is still scope for further improvement. © 2009 Macmillan Publishers Limited All rights reserved.
Resumo:
In comparison to the rest of the United Kingdom (UK) the Northern Irish Construction Industry was disproportionately affected by the recent economic recession. During this period, use of the New Engineering Contract (NEC) has proliferated in the public sector, however no study has been undertaken to examine the impact of the recession on this contract in Northern Ireland. The aim of this paper is to explore NEC contract implementation in Northern Ireland and the impact of the recession on its operation. A qualitative methodology is adopted using a literature review and semi structured interviews with six construction professionals. A qualitative analysis identifies themes and issues arising exploring connections and links between them using thematic coding. The initial findings are that the introduction of the NEC contract in Northern Ireland makes demands of contractors and consultants in terms of additional resources and training. Some consultants show a clear lack of understanding of the contract and its provisions. Whilst there is general agreement that the contract does help to stimulate good project management, the interviewees find the contract time consuming and complicated to administer, describing it as “unforgiving for the architect and unforgiving to the contractor.” Due to the impact of the recession, both contractors and consultants are still reporting a drop in income from pre-recession levels. Project resourcing levels have dropped significantly since the onset of the recession. Adversarial and opportunistic behaviour has increased. Many consultants and contractors are struggling to adequately administer the NEC contract at current income levels. The introduction of the NEC contract and the economic recession have exerted opposing forces on the implementation of the contract, hindering its execution. As the pressures exerted by the economic recession abate and a greater understanding of the contract develops, these opposing forces will ease leading to a more consistent implementation of the contract.
Resumo:
Tenure-track contract is criticized for curbing the incentives to expend effort after obtaining tenured status. Yet the most productive faculties seem to work on a tenure contract, and schools which aim to employ the best faculty seem to prefer to offer tenure-track contracts to their new recruits. I argue that tenure-track contracts are by construction more attractive to more able freshly minted PhDs, and therefore the observed sorting is rationalizable.