992 resultados para Airport construction contracts


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The construction industry should be a priority to all governments because it impacts economically and socially on all citizens. Sector turnover in industrialised economies typically averages 8-12% of GDP. Further, construction is critical to economic growth. Recent Australian studies estimate that a 10% gain in efficiency in construction translates to a 2.5% increase in GDP ----- ----- Inefficiencies in the Australian construction industry have been identified by a number of recent studies modelling the building process. They have identified potential savings in time of between 25% and 40% by reducing non-value added steps in the process. A culture of reform is now emerging in the industry – one in which alternate forms of project delivery are being trial. ----- ----- Government and industry have identified Alliance Contracting as a means to increase efficiency in the construction industry as part of a new innovative procurement environment. Alliance contracting requires parties to form relationships and work cooperatively to provide a more complete service. This is a significant cultural change for the construction industry, with its well-known adversarial record in traditional contracting. Alliance contracts offer enormous potential benefits, but the Australian construction industry needs to develop new skills to effectively participate in the new relationship environment. ----- ----- This paper describes a collaborative project identifying skill needs for clients and construction professionals to more effectively participate in an increasingly sophisticated international procurement environment. The aim of identifying these skill needs is to assist industry, government, and skill developers to prepare the Australian construction workforce for the future. The collaborating Australian team has been fortunate to secure the Australian National Museum in Canberra as its live case study. The Acton Peninsula Development is the first major building development in the world awarded on the basis of a joint alliance contract.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Request For Proposal (RFP) with the design‐build (DB) procurement arrangement is a document in which an owner develops his requirements and conveys the project scope to DB contractors. Owners should provide an appropriate level of design in DB RFPs to adequately describe their requirements without compromising the prospects for innovation. This paper examines and compares the different levels of owner‐provided design in DB RFPs by the content analysis of 84 requests for RFPs for public DB projects advertised between 2000 and 2010 with an aggregate contract value of over $5.4 billion. A statistical analysis was also conducted in order to explore the relationship between the proportion of owner‐provided design and other project information, including project type, advertisement time, project size, contractor selection method, procurement process and contract type. The results show that the majority (64.8%) of the RFPs provide less than 10% of the owner‐provided design. The owner‐provided design proportion has a significant association with project type, project size, contractor selection method and contract type. In addition, owners are generally providing less design in recent years than hitherto. The research findings also provide owners with perspectives to determine the appropriate level of owner‐provided design in DB RFPs.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Client-side project manager face challenges in motivating project organisations to pursue exceptional design and construction performance. One approach to improving the motivation of project organisations is by offering a financial incentive reward for the achievement of voluntary performance standards above the minimum required standard. However, little investigation has been undertaken into the features of a successful incentive system as a part of an overall procurement strategy. In response to a lack of information available to client-side project managers tasked with the initial design of an incentive system, the paper explores motivation undera successful incentive and identifies key learnings for client-side project managers to consider when designing incentives. Our findings are based on the results of a large Australian case study which is interpreted against a conceptual framework based on both economic and psychological perspectives of motivation. The results suggest the motivation towards incentive goals is influenced by the value the project organisations place on the incentive reward as a commercial opportunity to increase their profit margins. However, perhaps more important are the relationship management processes that promote commitment to the project; and pride in the achievement of project goals. In the case study, these processes intensified the direct motivational effect of the incentive reward on offer. The findings also highlight the importance of ensuring that incentive goals and performance measurement processes remain relevant to the organisation throughout a project to continuously encourage motivation under changing project conditions.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The complex design process of airport terminal needs to support a wide range of changes in operational facilities for both usual and unusual/emergency events. Process model describes how activities within a process are connected and also states logical information flow of the various activities. The traditional design process overlooks the necessity of information flow from the process model to the actual building design, which needs to be considered as a integral part of building design. The current research introduced a generic method to obtain design related information from process model to incorporate with the design process. Appropriate integration of the process model prior to the design process uncovers the relationship exist between spaces and their relevant functions, which could be missed in the traditional design approach. The current paper examines the available Business Process Model (BPM) and generates modified Business Process Model(mBPM) of check-in facilities of Brisbane International airport. The information adopted from mBPM then transform into possible physical layout utilizing graph theory.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Airports are currently being pressured to operate in a more environmentally-sensitive manner; as a response, airports have integrated environmental policies into their operations. However, environmental concerns regarding automobile traffic and related emissions have yet to be addressed. While the automobile is the dominant air passenger ground transportation mode at US airports, services facilitating automobile usage including public parking and car rentals are a major airport revenue source. Less than 20 US hub airports have direct access to rail-based transportation modes. New rail transportation projects serving additional airports are either being consideration or under construction. Regardless of whether an airport has direct access to rail-based transportation modes, the air passenger ground transportation modal split at US airports remain low in comparison to those in Asia and Europe. The high cost of providing additional US airports with direct rail connections in an era of severe governmental budgetary cutbacks is making the “build it and they will come” mindset untenable. Governmental policies are but one factor determining whether programs increasing transit usage results in automobile traffic reductions and related emissions. This study reveals that a significant percentage of the busiest US airports do not have policies fostering increases in the air passenger ground transportation modal split. A case study of one US airport is presented that has successfully adopted a transit first policy to achieve a high air passenger ground transportation modal split and facilitate the availability of rail-based transportation services.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This article analyses the inconsistent approaches taken by courts when interpreting provisions of the Corporations Act which address debts or expenses “incurred” by receivers, administrators and liquidators. The article contends for a consistent construction of these provisions which will enable the legislation to operate (as was intended) for the benefit of persons who supply goods, services or labour to companies in external administration. The article explains how and why debts can be “incurred” by insolvency practitioners continuing on pre-existing contracts. Specifically, the article contends for a construction of ss 419 and 443A of the Corporations Act which renders receivers and administrators personally liable for certain entitlements of employees (eg, wages and superannuation contributions) which become due and payable by reason of the decision of a receiver or administrator to continue a pre-existing contract rather than terminate it.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper describes an empirical study to test the proposition that all construction contract bidders are homogeneous ie. they can be treated as behaving collectively in an identical (statistical) manner. Examination of previous analyses of bidding data reveals a flaw in the method of standardising bids across different size contracts and a new procedure is proposed which involves the estimation of a contract datum. Three independent sets of bidding data were then subjected to this procedure and estimates of the necessary distributional parameters obtained. These were then tested against the bidder homogeneity assumption resulting in the conclusion that the assumption may be appropriate for a three parameter log-normal shape, but not for scale and location.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In Australia, collaborative contracts, and in particular, project alliances, have been increasingly used to govern infrastructure projects. These contracts use formal and informal governance mechanisms to manage the delivery of infrastructure projects. Formal mechanisms such as financial risk sharing are specified in the contract, while informal mechanisms such as integrated teams are not. Given that the literature contains a multiplicity of often untestable definitions, this paper reports on a review of the literature to operationalize the concepts of formal and informal governance. This work is the first phase of a study that will examine the optimal balance of formal and informal governance structures. Desk-top review of leading journals in the areas of construction management and business management, as well as recent government documents and industry guidelines, was undertaken to to conceptualise and operationalize formal and informal governance mechanisms. The study primarily draws on transaction-cost economics (e.g. Williamson 1979; Williamson 1991), relational contract theory (Feinman 2000; Macneil 2000) and social psychology theory (e.g. Gulati 1995). Content analysis of the literature was undertaken to identify key governance mechanisms. Content analysis is a commonly used methodology in the social sciences area. It provides rich data through the systematic and objective review of literature (Krippendorff 2004). NVivo 9, a qualitative data analysis software package, was used to assist in this process. A previous study by the authors identified that formal governance mechanisms can be classified into seven measurable categories: (1) negotiated cost, (2) competitive cost, (3) commercial framework, (4) risk and reward sharing, (5) qualitative performance, (6) collaborative multi-party agreement, and (7) early contractor involvement. Similarly, informal governance mechanisms can be classified into four measureable categories: (1) leadership structure, (2) integrated team, (3) team workshops, and (4) joint management system. This paper explores and further defines the key operational characteristics of each mechanism category, highlighting its impact on value for money in alliance project delivery. The paper’s contribution is that it provides the basis for future research to compare the impact of a range of individual mechanisms within each category, as a means of improving the performance of construction projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Collaborative contracting has emerged over the past 15 years as an innovative project delivery framework that is particularly suited to infrastructure projects. Australia leads the world in the development of project and program alliance approaches to collaborative delivery. These approaches are considered to promise superior project results. However, very little is known about the learning routines that are most widely used in support of collaborative projects in general and alliance projects in particular. The literature on absorptive capacity and dynamic capabilities indicates that such learning enhances project performance. The learning routines employed at corporate level during the operation of collaborative infrastructure projects in Australia were examined through a large survey conducted in 2013. This paper presents a descriptive summary of the preliminary findings. The survey captured the experiences of 320 practitioners of collaborative construction projects, including public and private sector clients, contractors, consultants and suppliers (three per cent of projects were located in New Zealand, but for brevity’s sake the sample is referred to as Australian). The majority of projects identified used alliances (78.6%); whilst 9% used Early Contractor Involvement (ECI) contracts and 2.7% used Early Tender Involvement contracts, which are ‘slimmer’ types of collaborative contract. The remaining 9.7% of respondents used traditional contracts that employed some collaborative elements. The majority of projects were delivered for public sector clients (86.3%), and/or clients experienced with asset procurement (89.6%). All of the projects delivered infrastructure assets; one third in the road sector, one third in the water sector, one fifth in the rail sector, and the rest spread across energy, building and mining. Learning routines were explored within three interconnected phases: knowledge exploration, transformation and exploitation. The results show that explorative and exploitative learning routines were applied to a similar extent. Transformative routines were applied to a relatively low extent. It was also found that the most highly applied routine is ‘regularly applying new knowledge to collaborative projects’; and the least popular routine was ‘staff incentives to encourage information sharing about collaborative projects’. Future research planned by the authors will examine the impact of these routines on project performance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Funded by an Australian Research Council (ARC) Linkage grant over four years (2009–13), the Major Infrastructure Procurement project sought to find more effective and efficient ways of procuring and delivering the nation’s social and economic infrastructure by investigating constraints relating to construction capacity, competition, and finance in new public sector major infrastructure.1 The research team comprised researchers in construction economics and finance from Queensland University of Technology (QUT), Griffith University (GU), The University of Hong Kong (UHK), and The University of Newcastle (UoN). Project partners included state government departments and agencies responsible for infrastructure procurement and delivery from all Australian mainland states, and private sector companies and peak bodies in the infrastructure sector (see “Introduction” for complete list). There are a number of major outcomes from this research project. The first of these is a scientifically developed decisionmaking model for procurement of infrastructure that deploys a novel and state-of-the-art integration of dominant microeconomic theory (including theories developed by two Nobel Prize winners). The model has been established through empirical testing and substantial experiential evidence as a valid and reliable guide to configuring procurement of new major and mega infrastructure projects in pursuance of superior Valuefor- Money (VfM). The model specifically addresses issues of project size, bundling of contracts, and exchange relationships. In so doing, the model determines the suitability of adopting a Public-Private Partnership (PPP) mode.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background Value for money (VfM) on collaborative construction projects is dependent on the learning capabilities of the organisations and people involved. Within the context of infrastructure delivery, there is little research about the impact of organisational learning capability on project value. The literature contains a multiplicity of often un-testable definitions about organisational learning abilities. This paper defines learning capability as a dynamic capability that participant organisations purposely develop to add value to collaborative projects. The paper reports on a literature review that proposes a framework that conceptualises learning capability to explore the topic. This work is the first phase of a large-scale national survey funded by the Alliancing Association of Australasia and the Australian Research Council. Methodology Desk-top review of leading journals in the areas of strategic management, strategic alliances and construction management, as well as recent government documents and industry guidelines, was undertaken to synthesise, conceptualise and operationalise the concept of learning capability. The study primarily draws on the theoretical perspectives of the resource-based view of the firm (e.g. Barney 1991; Wernerfelt 1984), absorptive capacity (e.g. Cohen and Levinthal 1990; Zahra and George 2002); and dynamic capabilities (e.g. Helfat et al. 2007; Teece et al. 1997; Winter 2003). Content analysis of the literature was undertaken to identify key learning routines. Content analysis is a commonly used methodology in the social sciences area. It provides rich data through the systematic and objective review of literature (Krippendorff 2004). NVivo 9, a qualitative data analysis software package, was used to assist in this process. Findings and Future Research The review process resulted in a framework for the conceptualisation of learning capability that shows three phases of learning: (1) exploratory learning, (2) transformative learning and (3) exploitative learning. These phases combine both internal and external learning routines to influence project performance outcomes and thus VfM delivered under collaborative contracts. Sitting within these phases are eight categories of learning capability comprising knowledge articulation, identification, acquisition, dissemination, codification, internationalisation, transformation and application. The learning routines sitting within each category will be disaggregated in future research as the basis for measureable items in a large-scale survey study. The survey will examine the extent to which various learning routines influence project outcomes, as well as the relationships between them. This will involve identifying the routines that exist within organisations in the construction industry, their resourcing and rate of renewal, together with the extent of use and perceived value within the organisation. The target population is currently estimated to be around 1,000 professionals with experience in relational contracting in Australia. This future research will build on the learning capability framework to provide data that will assist construction organisations seeking to maximise VfM on construction projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose of this paper This research aims to examine the effects of inadequate documentation to the cost management & tendering processes in Managing Contractor Contracts using Fixed Lump Sum as a benchmark. Design/methodology/approach A questionnaire survey was conducted with industry practitioners to solicit their views on documentation quality issues associated with the construction industry. This is followed by a series of semi-structured interviews with a purpose of validating survey findings. Findings and value The results showed that documentation quality remains a significant issue, contributing to the industries inefficiency and poor reputation. The level of satisfaction for individual attributes of documentation quality varies. Attributes that do appear to be affected by the choice of procurement method include coordination, build ability, efficiency, completeness and delivery time. Similarly the use and effectiveness of risk mitigation techniques appears to vary between the methods, based on a number of factors such as documentation completeness, early involvement, fast tracking etc. Originality/value of paper This research fills the gap of existing body of knowledge in terms of limited studies on the choice of a project procurement system has an influence on the documentation quality and the level of impact. Conclusions Ultimately research concludes that the entire project team including the client and designers should carefully consider the individual projects requirements and compare those to the trade-offs associated with documentation quality and the procurement method. While documentation quality is definitely an issue to be improved upon, by identifying the projects performance requirements a procurement method can be chosen to maximise the likelihood that those requirements will be met. This allows the aspects of documentation quality considered most important to the individual project to be managed appropriately.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The construction industry is renowned for spending vast sums in the resolution of disputes, but never in the prevention. The purpose of this paper is to analyse the New Engineering Contract (NEC) to determine whether or not adjudication has become misaligned with the contract’s objective of promoting effective management. In doing so, the paper examines dispute review boards in order to ascertain if they could be a viable alternative to adjudication. A sequential mixed methodology is adopted including a detailed literature review, eight semi-structured interviews, culminating in the circulation and analysis of a questionnaire, to record the significance of the factors identified. The research concludes that the majority of individuals agree that dispute review boards would be more aligned with the NEC. The familiarity of members, the potential to curb rogue behaviour of parties and the proactive nature of the board are flagged as positive features, however the cost aspect requires further investigation. The reservations made in the study about adjudication, such as the priority given to speed over accuracy and also the adversarial nature of the process, suggest that a preventative step prior to proceeding to adjudication would coincide more with the three core themes of the NEC Contract and therefore, be a positive addition.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

La collusion est une pratique anticoncurrentielle qui a pour but la coopération de personnes morales afin d’atteindre un but commun tel que le profit. Cette méthode se retrouve dans le milieu de la construction notamment par la rotation de contrat, par la fixation de prix ou le débalancement de bordereaux. Bien que la collusion dans la construction soit souvent associée au crime organisé, cette étude propose l’hypothèse d’un contrôle du marché par le crime organisant et non le crime organisé. Ainsi, l’industrie de la construction serait influencée par une organisation en mouvance et en développement constant pouvant s’organiser tout en organisant d’autres noyaux. En analysant le marché de l’industrie de la construction, cette étude a pu relever qu’il était possible à l’aide d’outils quantitatifs tels que l’analyse de classification d’identifier des irrégularités au sein du marché, au fil des années. Des entrevues passées auprès d’acteurs du domaine de la construction sont venues confirmer l’hypothèse d’un contrôle du marché par le crime organisant et non le crime organisé. L’analyse qualitative se penchait ainsi sur les motivations des acteurs à entreprendre des pratiques anticoncurrentielles et sur la compréhension de l’émergence de la collusion dans la construction. La discussion identifie les opportunités criminelles, de même que les problématiques survenant dans le milieu de la construction et pouvant influencer l’émergence de la collusion. Ces problématiques concernent les contributions aux partis politiques, le truquage des devis et bordereaux par les firmes de consultants, l’impunité des autorités, l’historicité des entrepreneurs, l’idéologie de marché et les problématiques liées au cautionnement. Enfin, des solutions adaptées à la réalité de l’industrie de la construction en tenant compte des facteurs de risque ont été identifiées.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Chapter 1 presents a brief note on the state at which the construction industry stands at present, bringing into focus the significance of the critical study. Relevance of the study, area of investigation and objectives of the study are outlined in this chapter. The 2nd chapter presents a review of the literature on the relevant areas. In the third chapter an analysis on time and cost overrun in construction highlighting the major factors responsible for it has been done. A couple of case studies to estimate loss to the nation on account of delay in construction have been presented in the chapter. The need for an appropriate estimate and a competent contractor has been emphasised for improving effectiveness in the project implementation. Certain useful equations and thoughts have been formulated on this area in this chapter that can be followed in State PWD and other Govt. organisations. Case studies on project implementation of major projects undertaken by Government sponsored/supported organizations in Kerala have been dealt with in Chapter 4. A detailed description of the project of Kerala Legislature Complex with a critical analysis has been given in this chapter. A detailed account of the investigations carried out on the construction of International Stadium, a sports project of Greater Cochin Development Authority is included here. The project details of Cochin International Airport at Nedumbassery, its promoters and contractors are also discussed in Chapter 4. Various aspects of implementation which led the above projects successful have been discussed in chapter 5. The data collected were analysed through discussion and perceptions to arrive at certain conclusions. The emergence of front-loaded contract and its impact on economics of the project execution are dealt with in this chapter. Analysis of delays in respect of the various project narrated in chapter 3 has been done here. The root causes of the project time and overrun and its remedial measures are also enlisted in this chapter. Study of cost and time overrun of any construction project IS a part of construction management. Under the present environment of heavy investment on construction activities in India, the consequences of mismanagement many a time lead to excessive expenditure which are not be avoidable. Cost consciousness, therefore has to be keener than ever before. Optimization in investment can be achieved by improved dynamism in construction management. The successful completion of coristruction projects within the specified programme, optimizing three major attributes of the process - quality, schedule and costs - has become the most valuable and challenging task for the engineer - managers to perform. So, the various aspects of construction management such as cost control, schedule control, quality assurance, management techniques etc. have also been discussed in this fifth chapter. Chapter 6 summarises the conclusions drawn from the above criticalr1 of rhajor construction projects in Kerala.