992 resultados para 37.016
Resumo:
The Duck Creek Watershed, the recipient of a 2009 DNR Watershed Management Planning Grant and a focus of an upcoming City of Davenport master plan, is characterized by relatively flat grades and highly impervious areas. Plagued by issues such as high bacteria loads, stream bank erosion and flooding, solving these problems may take generations. The City of Davenport has taken a microwatershed approach to identify the significant contributors to water quality and flooding issues that affect Duck Creek, its tributaries and the surrounding landscape to make inroads into the larger issues. This project is the next phase of a multi-phased project that addresses the microwatershed that includes St Ambrose University. Work here will improve water quality within Duck Creek and address major flooding issues on campus while also reducing downstream flooding. This project will convert an existing parking lot into a green parking area by removing the hard surface and installing below ground facilities for storm water infiltration, detention, and reuse. Permeable pavement, bio swales and infiltration areas will be constructed on top of the infiltration facilities. We estimate that this project will capture and treat 1,110,000 gallons (3.5 acre feet) of storm water runoff which accounts to the runoff volume from a 10-year storm event while reducing pollutants by 30-100%.
Resumo:
Comprend : Oeuvres choisies de Vico
Resumo:
CIRAS is to enhance the performance of Iowa industry, and associated entities, through education and technology-based services. This newsletter holds information regarding these services.
Resumo:
CIRAS is to enhance the performance of Iowa industry, and associated entities, through education and technology-based services. This newsletter holds information regarding these services.
Resumo:
A road safety audit was conducted for a 7.75 mile section of County Road X-37 in Louisa County, Iowa. In 2006, the average annual daily traffic on this roadway was found to be 680 vehicles per day. Using crash data from 2001 to 2007, the Iowa Department of Transportation (Iowa DOT) has identified this roadway as being in the highest 5% of local rural roads in Iowa for single-vehicle runoff- road crashes. Considering these safety data, the Louisa County Engineer requested that a road safety audit be conducted to identify areas of safety concerns and recommend low-cost mitigation to address those concerns. Staff and officials from the Iowa DOT, Governor’s Traffic Safety Bureau, Federal Highway Administration, Institute for Transportation, and local law enforcement and transportation agencies met to review crash data and discuss potential safety improvements to this segment of X-37. This report outlines the findings and recommendations of the road safety audit team to address the safety concerns on this X-37 corridor and explain several selected mitigation strategies.
Resumo:
The urban portion of the Kettle Creek Watershed is experiencing severe bank and bed erosion due to unchecked stormwater runoff and a steep stream slope. The Kettle Creek Urban Watershed Improvement Project will reduce sediment input to the stream by stabilizing the steam bed with rock-riffle stream stabilization structures and stream bank improvements at select locations. Other components of the watershed are being addressed for excess sediment loads including the agricultural portion by constructing sediment detention basins, and the urban stormwater component by separating the existing combined sanitary and stormwater systems. The urban stream erosion factor represents the weak link in the current watershed impairment. The benefits of the all the watershed improvements components will be realized by all the residents of Kettle Creek Watershed as well as the citizens of Ottumwa.
Resumo:
Competine Creek is an 8,653 acre subwatershed of Whitebreast Creek which drains directly to Lake Red Rock. The Marion Soil and Water Conservation District has prioritized water quality protection efforts within Competine Creek subwatershed because 1) this watershed has been identified as a significant contributor of sediment, nutrients, and bacteria to Competine Creek and Lake Red Rock, 2) the watershed provides unique outreach opportunities due to its unique rural and urban interface, and 3) by using a targeted approach to address water quality, the likelihood of successfully demonstrating water quality improvements is high due to its manageable size. The specific goals of this proposal to WIRB (Phase I) are to: 1) reduce sediment and nutrient delivery by 1787 tons and 2144 lbs by installing conservation practices on high priority agricultural land; and 2) install urban conservation practices that reduce the volume of peak flow, improve streambank stability, and promote infiltration of stormwater runoff before it enters Competine Creek. The Marion SWCD has assembled a unique group of partners and secured funding from multiple sources to implement this project.
Resumo:
A water quality resource concern has come to the forefront in the Upper Miller Creek watershed in Black Hawk County after five to seven inches of rain fell on the area on May 22nd and 23rd of 2004 and unprecedented amounts of soil and organic debris were washed from cultivated areas, clogging most culverts and roadside ditches. The quantity of soil deposited in ditches gave a good indication of the amounts that were transported into the stream. The estimated total cost to Black Hawk County for cleanup and repair within the road right-of-way was $345,000. There were undetermined environmental costs incurred when the incredibly high volumes of soil washed from the fields into Miller Creek which flows directly into the Cedar River that is identified by the Department of Natural Resources as an impaired water body. The Upper Miller Creek Watershed Project is an innovative, collaborative project intended to meet a specific need identified by a local steering committee made up of concerned community agencies and local landowners. Led by the Soil and Water Conservation District and the Black Hawk County Board of Supervisors, the Miller Creek Watershed Project seeks to reduce soil erosion, improve water quality, and reduce county road infrastructure cost by implementing conservation practices, reducing nutrient and pesticide use and improving wildlife habitat.
Resumo:
In-lake management can be a critical need for water quality improvement for impaired recreation lakes. Biomanipulation practices to achieve the proper balance of predatory fish, zooplankton grazing of algae, and native aquatic vegetation can sometimes restore water clarity of turbid, nutrient enriched lakes. Lakewood leaders have a renovation plan for Lake Colchester, involving several common and three innovative practices. Lakewood is prepared to pay for proven practices, but seeks WIRB grant support to test innovations in collaboration with Iowa DNR biologists, and ISU limnologists, serving as advisors and monitors for the entire project.
Resumo:
Käsittelee Korkeimman hallinto-oikeuden ratkaisua KHO:2006:37
Resumo:
OBJECTIVE: To determine the incidence and risk factors of electrical seizures and other electrical epileptic activity using continuous EEG (cEEG) in patients with acute stroke. METHODS: One hundred consecutive patients with acute stroke admitted to our stroke unit underwent cEEG using 10 electrodes. In addition to electrical seizures, repetitive focal sharp waves (RSHWs), repetitive focal spikes (RSPs), and periodic lateralized epileptic discharges (PLEDs) were recorded. RESULTS: In the 100 patients, cEEG was recorded for a mean duration of 17 hours 34 minutes (range 1 hour 12 minutes to 37 hours 10 minutes). Epileptic activity occurred in 17 patients and consisted of RSHWs in seven, RSPs in seven, and PLEDs in three. Electrical seizures occurred in two patients. On univariate Cox regression analysis, predictors for electrical epileptic activity were stroke severity (high score on the National Institutes of Health Stroke Scale) (hazard ratio [HR] 1.12; p = 0.002), cortical involvement (HR 5.71; p = 0.021), and thrombolysis (HR 3.27; p = 0.040). Age, sex, stroke type, use of EEG-modifying medication, and cardiovascular risk factors were not predictors of electrical epileptic activity. On multivariate analysis, stroke severity was the only independent predictor (HR 1.09; p = 0.016). CONCLUSION: In patients with acute stroke, electrical epileptic activity occurs more frequently than previously suspected.
Resumo:
Donateur : Lapie, Pierre-Olivier (1901-1994)