829 resultados para 120201 Building Construction Management and Project Planning
Resumo:
The term commercial management has been used for some time, similarly the job title commercial manager. However, as of yet, little emphasis has been placed on defining. This paper presents the findings from a two-year research initiative that has compared and contrasted the role of commercial managers from a range of organisations and across industry sectors, as a first step in developing a body of knowledge for commercial. It is argued that there are compelling arguments for considering commercial management, not solely as atask undertaken by commercial managers, but as a discipline in itself: a discipline that, arguably, bridges traditional project management and organisational theories. While the study has established differences in approach and application both between and within industry sectors, it has established sufficient similarity and synergy in practice to identify a specific role of commercial management in project-based organisations. These similarities encompass contract management and dispute resolution; the divergences include a greater involvement in financial and value management in construction and in bid management in defence/aerospace.
Resumo:
Uncertainty contributes a major part in the accuracy of a decision-making process while its inconsistency is always difficult to be solved by existing decision-making tools. Entropy has been proved to be useful to evaluate the inconsistency of uncertainty among different respondents. The study demonstrates an entropy-based financial decision support system called e-FDSS. This integrated system provides decision support to evaluate attributes (funding options and multiple risks) available in projects. Fuzzy logic theory is included in the system to deal with the qualitative aspect of these options and risks. An adaptive genetic algorithm (AGA) is also employed to solve the decision algorithm in the system in order to provide optimal and consistent rates to these attributes. Seven simplified and parallel projects from a Hong Kong construction small and medium enterprise (SME) were assessed to evaluate the system. The result shows that the system calculates risk adjusted discount rates (RADR) of projects in an objective way. These rates discount project cash flow impartially. Inconsistency of uncertainty is also successfully evaluated by the use of the entropy method. Finally, the system identifies the favourable funding options that are managed by a scheme called SME Loan Guarantee Scheme (SGS). Based on these results, resource allocation could then be optimized and the best time to start a new project could also be identified throughout the overall project life cycle.
Resumo:
Services are very important to the UK balance of trade; a surplus has been recorded for trade in services every year since 1966. Construction professional services exports (CPS), which cover architecture, engineering and surveying (AES), have also increased, contributing over £3bn to the UK trade balance in 2007. The changing environment of construction professional services exports complicates the validity of the characteristics and definitions of services as described in the research literature and official export statistics. Through semi-structured interviews undertaken with large consulting engineers and a round-table discussion with industry and government representatives, the research found that the impact of globalisation and the changes in the construction business environment, such as increasing foreign ownership and changing forms of procurement, are not fully reflected in the official statistics. There have also been rapid changes in technology, procurement and methods of delivery which have impacted exporting AES firms and a more appropriate set of characteristics is needed to better reflect the project-specific and knowledge-intensive nature of AES firms.
Resumo:
The traditional economic approach for appraising the costs and benefits of construction project Net Present Values involves the calculation of net returns for each investment option under different discount rates. An alternative approach consists of multiple-project discount rates based on risk modelling. The example of a portfolio of microgeneration renewable energy technology (MRET) is presented to demonstrate that risks and future available budget for re-investment can be taken into account when setting discount rates for construction project specifications in presence of uncertainty. A formal demonstration is carried out through a reversed intertemporal approach of applied general equilibrium. It is demonstrated that risk and the estimated available budget for future re-investment can be included in the simultaneous assessment of the costs and benefits of multiple projects.
Resumo:
Local, tacit and normally unspoken OHS (occupational health and safety) knowledge and practices can too easily be excluded from or remain below the industry horizon of notice, meaning that they remain unaccounted for in formal OHS policy and practice. In this article we stress the need to more systematically and routinely tap into these otherwise ‘hidden’ communication channels, which are central to how everyday safe working practices are achieved. To demonstrate this approach this paper will draw on our ethnographic research with a gang of migrant curtain wall installers on a large office development project in the north of England. In doing so we reflect on the practice-based nature of learning and sharing OHS knowledge through examples of how workers’ own patterns of successful communication help avoid health and safety problems. These understandings, we argue, can be advanced as a basis for the development of improved OHS measures, and of organizational knowing and learning.
Resumo:
This paper discusses the development of the Virtual Construction Simulator (VCS) 3 - a simulation game-based educational tool for teaching construction schedule planning and management. The VCS3 simulation game engages students in learning the concepts of planning and managing construction schedules through goal driven exploration, employed strategies, and immediate feedback. Through the planning and simulation mode, students learn the difference between the as-planned and as-built schedules resulting from varying factors such as resource availability, weather and labor productivity. This paper focuses on the development of the VCS3 and its construction physics model. Challenges inherent in the process of identifying variables and their relationships to reliably represent and simulate the dynamic nature of planning and managing of construction projects are also addressed.
Resumo:
Urban metabolism considers a city as a system with flows of energy and material between it and the environment. Recent advances in bio-physical sciences provide methods and models to estimate local scale energy, water, carbon and pollutant fluxes. However, good communication is required to provide this new knowledge and its implications to endusers (such as urban planners, architects and engineers). The FP7 project BRIDGE (sustainaBle uRban plannIng Decision support accountinG for urban mEtabolism) aimed to address this gap by illustrating the advantages of considering these issues in urban planning. The BRIDGE Decision Support System (DSS) aids the evaluation of the sustainability of urban planning interventions. The Multi Criteria Analysis approach adopted provides a method to cope with the complexity of urban metabolism. In consultation with targeted end-users, objectives were defined in relation to the interactions between the environmental elements (fluxes of energy, water, carbon and pollutants) and socioeconomic components (investment costs, housing, employment, etc.) of urban sustainability. The tool was tested in five case study cities: Helsinki, Athens, London, Florence and Gliwice; and sub-models were evaluated using flux data selected. This overview of the BRIDGE project covers the methods and tools used to measure and model the physical flows, the selected set of sustainability indicators, the methodological framework for evaluating urban planning alternatives and the resulting DSS prototype.
Resumo:
The UK government is mandating the use of building information modelling (BIM) in large public projects by 2016. As a result, engineering firms are faced with challenges related to embedding new technologies and associated working practices for the digital delivery of major infrastructure projects. Diffusion of innovations theory is used to investigate how digital innovations diffuse across complex firms. A contextualist approach is employed through an in-depth case study of a large, international engineering project-based firm. The analysis of the empirical data, which was collected over a four-year period of close interaction with the firm, reveals parallel paths of diffusion occurring across the firm, where both the innovation and the firm context were continually changing. The diffusion process is traced over three phases: centralization of technology management, standardization of digital working practices, and globalization of digital resources. The findings describe the diffusion of a digital innovation as multiple and partial within a complex social system during times of change and organizational uncertainty, thereby contributing to diffusion of innovations studies in construction by showing a range of activities and dynamics of a non-linear diffusion process.
Resumo:
With the increase in e-commerce and the digitisation of design data and information,the construction sector has become reliant upon IT infrastructure and systems. The design and production process is more complex, more interconnected, and reliant upon greater information mobility, with seamless exchange of data and information in real time. Construction small and medium-sized enterprises (CSMEs), in particular,the speciality contractors, can effectively utilise cost-effective collaboration-enabling technologies, such as cloud computing, to help in the effective transfer of information and data to improve productivity. The system dynamics (SD) approach offers a perspective and tools to enable a better understanding of the dynamics of complex systems. This research focuses upon system dynamics methodology as a modelling and analysis tool in order to understand and identify the key drivers in the absorption of cloud computing for CSMEs. The aim of this paper is to determine how the use of system dynamics (SD) can improve the management of information flow through collaborative technologies leading to improved productivity. The data supporting the use of system dynamics was obtained through a pilot study consisting of questionnaires and interviews from five CSMEs in the UK house-building sector.
Resumo:
Esta pesquisa teve por objetivo verificar até que ponto as orientações repassadas pelo Instituto Nacional de Criminalística aos Setores Técnico-científicos da Polícia Federal, em termos de ambiente físico, têm se voltado para a interação interdisciplinar entre os peritos e para a preservação da cadeia de custódia. Para tanto, foi necessário recorrer a fundamentos sobre interdisciplinaridade, cadeia de custódia, arranjo físico na gestão de processos e ao planejamento de espaços no sentido de fortalecer o embasamento teórico para a discussão dos dados obtidos na pesquisa de campo. A pesquisa, desenvolvida com a ajuda de entrevistas destinadas aos ocupantes de setores estratégicos responsáveis pelas orientações e consultas à documentação técnica produzida na Polícia Federal, foi complementada com a realização de visitas aos setores do Paraná, Santa Catarina, Espírito Santo, Goiás, Alagoas, Rio Grande do Norte e Amazonas, de caráter exploratório e observacional, contemplando desde aspectos gerais associados aos objetos de análise até as peculiaridades regionais registradas in loco. Foram identificados dois tipos de orientações repassadas pelo Instituto Nacional de Criminalística, sendo um na fase preliminar de projeto e outro em momento posterior de avaliação, realizados por grupos distintos de servidores. De norte a sul do país, foram registradas diversas impressões atuais associadas aos ambientes físicos e instalações dessas unidades e, com base na riquíssima experiência obtida em cada localidade, foi possível propor uma modesta sugestão de melhoria ao arranjo físico na unidade do pesquisador e registrar sua implantação a posteriori. Mediante a comparação entre as orientações repassadas com as impressões obtidas nas visitas chegou-se à identificação, por exemplo, de lacunas de comunicação no âmbito do próprio Instituto Nacional de Criminalística, que perde excelentes oportunidades de prover os projetistas com informações atualizadas relacionadas aos ambientes físicos das descentralizadas. Conclui-se que apesar do avanço recente em relação ao tema, no tocante à criação de propostas preliminares de layout das unidades e à instituição das Comissões de Avaliação da Gestão da Criminalística, a unidade central precisa manter um sistema integrado de gestão dessas informações, alinhado às novas tendências construtivas e de projetos da Administração, de forma a transformar continuamente as observações coletadas nas unidades em novas orientações e diretrizes capazes de realimentar o sistema.
Resumo:
O trabalho tem como objetivo avaliar e descrever analiticamente a implementação de práticas de manufatura enxuta pela Pirelli Pneus no seu complexo industrial da América Latina. Além de uma descrição estruturada e ampla dos princípios de produção de Toyota e fundamentos teóricos do Lean thinking, uma ênfase especial será dedicada ao projeto EGR (Especialistas em Gestão da Rotina), como uma ferramenta estratégica para ser usada pela empresa multinacional italiana no futuro próximo, de modo a alcançar um resultado mais eficaz e eficiente na gestão da rotina diária. Este projeto, que representa um componente significativo do Pirelli Manufacturing System (PMS) e, principalmente, voltado para supervisores e gestores de plantas, consiste principalmente em ajudar a empresa a desenvolver a capacidade empresarial para avaliar corretamente o gap potencial existente entre os resultados atuais e os esperados, para tanto entender os desvios, bem como as causas subjacentes, e melhorar continuamente o desempenho da empresa por meio da padronização de processos e redução de desperdicios. Esses objetivos podem ser perseguidos, atuando em dois meios essenciais: habilidades técnicas e comportamentais de liderança para apoiar cada equipe de projeto; uma maior eficácia na gestão de indicadores de desempenho nas diferentes unidades de fábrica, de acordo com KPIs estabelecidos no nível central pelo Head Quarter. Além disso, a investigação será focada na experiência peculiar da planta de Santo André, onde o EGR começou como piloto, com o objetivo de captar as alterações relevantes (no lado organizacional e econômico) que este projeto trouxe para a empresa, através da realização de pesquisa de campo e entrevistas, que são orientados a recolher provas, considerações e opiniões de todos os principais atores envolvidos.