1000 resultados para Proyecto Fin de Carrera


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper includes the experimental study, analysis, redesign and subsequent test of the parts of a closed circuit, low speed wind tunnel which are relevant in terms of total pressure loss. The objective is to lower the energy consumption of this system for given conditions in test chamber, so as to reduce the operational costs. In order to achieve this objective, several tasks were performed as the text shows in its different parts. For these tasks, the ETSIAE wind tunnel was used, although the results of this work can be extrapolated to any wind tunnel with the same characteristics. Part II presents a theoretical previous study of the general running of a closed circuit, low speed wind tunnel, as well as the followed procedure to conduct experimental tests for obtaining the total pressure loss in its parts. Results from these tests and their analysis are included in this part. In part III, the analysis of the influence of corner 1 on the pressure loss takes place. As it is said in this part, corner 1 has great importance in the total pressure loss of the wind tunnel. Therefore, it is the first part that should be modified in order to improve the performances of the wind tunnel. During part IV, an optimised guide vane is designed in order to reduce the pressure loss in corner 1 of the wind tunnel. Software MISES is used to achieve this goal by means of selecting the optimum guide vane. In order to introduce the new guide vane in wind tunnels with affordable costs, the easily constructable criterion is kept during design. For this reason, the guide vane will consist of simple aerodynamic contours. Part V includes some possible improvements for the proposed guide vane, in order to evaluate if there is room for improvement in its design. Finally, part VI includes the tests that were conducted in the wind tunnel with the new guide vane cascade and the analysis of their results, in order to asses whether the proposed design fulfills the requirement of lowering the total pressure loss in the wind tunnel. Part VII gathers the main ideas resulting from the whole work.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

En el presente proyecto final de carrera se lleva a cabo un estudio de los sistemas de comunicaciones ópticas de 100 Gb/s. En la primera parte del proyecto se repasan las principales técnicas de modulación y de recepción de la portadora óptica, se presentan los diferentes formatos avanzados de modulación digital empleados para transmisiones de banda ancha y se discute por qué las modulaciones QPSK y DQPSK ofrecen mejores prestaciones que el resto a 100 Gb/s. La segunda parte compone el grueso del proyecto. Se centra en el estudio y la optimización de los sistemas ópticos de 100 Gb/s que hacen uso de los formatos de fase en cuadratura anteriores. De dicho análisis se pretende conocer cómo se degradan este tipo de señales a medida que se propagan por la fibra a estas velocidades. Intentaremos descubrir además cómo controlar ciertos parámetros de diseño como el ciclo de trabajo de la portadora óptica, el mapa de dispersión del enlace, la potencia inyectada a la fibra, la longitud de los vanos de amplificación …, para conseguir reducir la penalización sufrida por las limitaciones anteriores. La detección óptica coherente, la multiplexación en polarización, fibras de gran área efectiva y elevado coeficiente de dispersión cromática, unidas al uso de los formatos de fase en cuadratura, componen la mejor solución tecnológica para conseguir hacer realidad las transmisiones ópticas a 100 Gb/s de larga y ultra-larga distancia. Con el objetivo de completar el estudio teórico anterior, se diseñará una red óptica de banda ancha sobre la que se aplicarán las técnicas de diseño desarrolladas a lo largo del proyecto.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

El objetivo principal de este proyecto es la obtención del modelo tridimensional de la escultura del patrón San Isidoro de la E.T.S.I. Topografía, Geodesia y Cartografía fabricada en yeso con unas dimensiones de 225 mm de largo, 182 mm de ancho y 318 mm de alto. Se realizará mediante dos métodos diferentes: por medios fotogramétricos utilizando correlación,y por métodos de topografía industrial. En la toma de imágenes para la restitución fotogramétrica se utilizó una cámara no métrica, cuya calibración tuvo que ser realizada comparando dos sistemas de coordenadas, el sistema imagen determinado por técnicas fotogramétricas, y el sistema objeto o terreno determinado por técnicas de topografía clásica. De esta forma se obtienen los datos internos de la cámara. La tolerancia establecida a priori para fotogrametría terrestre es de 1 mm, verificando y contrastando los resultados obtenidos con equipos de trazabilidad superior con los que se procede a la extracción del modelo digital por métodos de topografía industrial, mediante escaneado de precisión. El modelo tridimensional obtenido podría ser útil para múltiples tareas, como disponer de documentación geométrica digital de la figura, su estudio para una posible restauración,etc.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Proyecto de Fin de Carrera de Ingenieria Industrial, versando sobre el completo diseño de una impresora 3D

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Con el presente proyecto se ha pretendido realizar una clasificación de los distintos usos del suelo en la provincia de Toledo y de forma más precisa en el municipio de Talavera de la Reina. Se ha profundizado en los conocimientos sobre teledetección adquiridos durante los años de estudio de la titulación de Ingeniero Técnico en Topografía, cubriendo las aplicaciones más importantes. Para ello, en primer lugar se debe recopilar la información, en este caso se han utilizado dos imágenes Landsat 8 - OLI (19/4/2013 - 9/8/2013) y con el software adecuado se realiza la clasificación dividiendo el suelo en los usos más frecuentes de dicha zona. El resultado obtenido nos muestra los distintos usos del suelo en el año de estudio, 2013, y exponer el potencial de las técnicas de teledetección, para así poder interpretar y llegar a conocer temas de gran relevancia como el aprovechamiento del terreno o el desarrollo del sector agrícola en la zona. El procedimiento consta de la elaboración de los correspondientes documentos cartográficos de usos del suelo y vegetación para el año 2013 a partir de las imágenes de satélite.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

El presente proyecto tiene como objeto la evaluación del parámetro distancia entre focos de emisión de CO2 y estructuras geológicas apropiadas para su almacenamiento, según los datos publicados por el Registro Estatal de Emisiones y Fuentes Contaminantes (PRTR España) y por el proyecto ALGECO2. El parámetro distancia analizado es referido a proyectos de Captura, Transporte y Almacenamiento de CO2 (proyectos CAC) a gran escala. Para ello se ha realizado un estudio en la zona de la Cuenca del Duero aplicando criterios de selección tanto técnicos como socio-económicos, según las recomendaciones de organizaciones como la Agencia Internacional de la Energía o el CCS Institute entre otros. A lo largo de este estudio se ha propuesto y evaluado un sistema de transporte por tubería “punto a punto” o un sistema en “red” determinando cuáles son los más recomendables para un futuro trazado de las líneas de transporte desde un punto de vista sostenible. This present project’s objective is to evaluate the distance parameter among several CO2 sources and adequate geological structures for storage, following the released data by the Registro Estatal de Emisiones y Fuentes Contaminantes (PRTR España) and the ALGECO2 project. The analysed distance parameter is applied to large-scale Carbon Captures and Storage (CCS) projects. For this study, a research has been carried out in the Cuenca del Duero area, utilizing selective criteria as technical as socio-economic, according to recommendations made by organizations such as International Energy Agency and CCS Institute among others. During this research it has been proposed and evaluated a “point to point” pipeline transport system or a “network” transport system, aiming to find the most effective future route selection of the transportation lines from a sustainable point of view.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

El objetivo de este proyecto es investigar la situación del shale gas en Europa, concretamente en Reino Unido, actualmente el país europeo más avanzado en el desarrollo del shale gas. Este proyecto está destinado a analizar la cantidad de gas de lutita presente en la formación Bowland-Hodder, así como el régimen regulatorio y fiscal que pueda afectar a la extracción de dicho gas. Por último, se analizará la situación del shale gas en España y el régimen que rige la extracción de este gas no convencional en nuestro país, concluyendo finalmente con las posibles recomendaciones a implementar del caso de Reino Unido en nuestro país.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

El proyecto tiene como obetivos principales la elaboración de un diagnóstico ambiental según la caracterización del estado actual del área de estudio en el Arroyo de la Vega, identificando presiones e impactos que limitan el estado natural del arroyo y la formulación de una propuesta de actuaciones para conservar, mejorar, recuperar o mitigar las afecciones que limitan el estado natural del arroyo de la Vega y su entorno, manteniendo ciertas ocupaciones de las riberas o usos del cauce.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Proemio-Minas Asdrubal-Almadén-Minas de Aller-Minas de cinabrio en Mieres-Fábrica de Mieres-Minas de Naranco(Oviedo)-Fábrica Nacional de Truiba-Minerales de hierro de Quirós-Fábrica de Armas-Fábrica de Vega y La Felguera-Minas de la Mosquitera-Minas de las Edelvinas-Minas de Arnao-Mina de la Soterraña (Pola de Lena)-Fábrica de la Soterraña-Fábrica de hierro de Quirós-Fundición de Moreda y Gigón-Fábrica de alambres y puntas de Paris-Fábrica metalúrgica de Puertollano de los señores Viuda Villanueva e Hijos-Sociedad "Fábrica de Mieres : Minas de Mariana y Nicolasa- Fábrica de Mieres

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Diseño y desarrollo de una aplicación de monitorización multiprotocolo modular y escalable.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

El presente proyecto, titulado “Integral development of an Agricultural Training Center to ensure food security in Glory Special Needs Primary School. Kitgum, Uganda” fue llevado a cabo de Julio de 2011 a Febrero de 2012 en la escuela primaria Glory Special Needs, dedicada a la atención y educación de jóvenes discapacitados, en Kitgum, Uganda. El proyecto se realizó con la colaboración del grupo de cooperación de la ETSI Agrónomos, AgSystems, la Fundación AmigoSolidarios y la ONG local NUCBACD. Su objetivo principal fue el desarrollo y puesta en marcha de un centro de capacitación Agrícola para dotar de igualdad de oportunidades a los jóvenes con discapacidad de Kitgum, potenciando y favoreciendo su integración en la comunidad, y garantizar así la seguridad alimentaria de los 137 alumnos internos en la escuela Glory Special Needs. El trabajo realizado supuso una acción relevante en Kitgum, superando la visión de una economía familiar basada en las actividades agrícolas, para centrarse en la profesionalización de la Agricultura como motor económico de la región. Este documento presenta una descripción de las principales actividades que se desarrollaron con el fin de alcanzar el objetivo planteado, desde un punto de vista educativo, sostenible e inclusivo. Para conseguirlo, se plantearon tres lineas de trabajo: - Programa productivo. - Programa educativo. - Programa organizativo.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Partiendo del estudio de la zona que discurre por la carretera E6 en su recorrido desde el municipio de Uddevala, al suroeste de Suecia hasta la frontera con Noruega se analizan las afecciones producidas en los asentamientos y el paisaje. El proyecto se estructura en tres escalas diferentes: regional, intermedia y local para entender la fuerte conexión entre las mismas. A nivel regional se analizan los tipos de paisaje por medio de un inventario utilizando el método PEBOSCA, dentro del programa Hábitat de las Naciones Unidas estudiando todos los recursos (físicos, biológicos, sociales, económicos, organizacionales... ) de una zona determianda ; y el método DAFO (en inglés SWOT)que se ocupa de las fuerzas y debilidades de la región. Se identifican los problemas más importantes, a saber, ampliar los servicios durante todo el año, mejorar la conectividad extendiendo el transporte público y carriles para bicicletas y mejorar la calidad del agua mitigando su efecto barrera. En un nivel intermedio, el proyecto se centra en la localidad de Hogdalsnäset por estar afectado por una falta de estructura urbana y por su proximidad a la frontera con Noruega. En el plano local se analiza la zona de Nordby presentando un plan alternativo de desarrollo a corto, medio y largo plazo. Por último, la autora concluye con la propuesta de construcción del "Parque del Humedal".

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Datos referentes a las Minas y Fábricas de Hellín y parte de la Sierra de Cartagena

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Distritos mineros de Cartagena y Mazarrón, y minas de azufre de Hellín.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Foliage Penetration (FOPEN) radar systems were introduced in 1960, and have been constantly improved by several organizations since that time. The use of Synthetic Aperture Radar (SAR) approaches for this application has important advantages, due to the need for high resolution in two dimensions. The design of this type of systems, however, includes some complications that are not present in standard SAR systems. FOPEN SAR systems need to operate with a low central frequency (VHF or UHF bands) in order to be able to penetrate the foliage. High bandwidth is also required to obtain high resolution. Due to the low central frequency, large integration angles are required during SAR image formation, and therefore the Range Migration Algorithm (RMA) is used. This project thesis identifies the three main complications that arise due to these requirements. First, a high fractional bandwidth makes narrowband propagation models no longer valid. Second, the VHF and UHF bands are used by many communications systems. The transmitted signal spectrum needs to be notched to avoid interfering them. Third, those communications systems cause Radio Frequency Interference (RFI) on the received signal. The thesis carries out a thorough analysis of the three problems, their degrading effects and possible solutions to compensate them. The UWB model is applied to the SAR signal, and the degradation induced by it is derived. The result is tested through simulation of both a single pulse stretch processor and the complete RMA image formation. Both methods show that the degradation is negligible, and therefore the UWB propagation effect does not need compensation. A technique is derived to design a notched transmitted signal. Then, its effect on the SAR image formation is evaluated analytically. It is shown that the stretch processor introduces a processing gain that reduces the degrading effects of the notches. The remaining degrading effect after processing gain is assessed through simulation, and an experimental graph of degradation as a function of percentage of nulled frequencies is obtained. The RFI is characterized and its effect on the SAR processor is derived. Once again, a processing gain is found to be introduced by the receiver. As the RFI power can be much higher than that of the desired signal, an algorithm is proposed to remove the RFI from the received signal before RMA processing. This algorithm is a modification of the Chirp Least Squares Algorithm (CLSA) explained in [4], which adapts it to deramped signals. The algorithm is derived analytically and then its performance is evaluated through simulation, showing that it is effective in removing the RFI and reducing the degradation caused by both RFI and notching. Finally, conclusions are drawn as to the importance of each one of the problems in SAR system design.