999 resultados para Machine costs


Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The costs of dispersal are an important factor promoting natal philopatry, thereby encouraging the formation of social groups. The red fox, Vulpes vulpes, exhibits a highly flexible social system and one that is thought to represent a possible stage in the evolution of more complex patterns of group-living. Although the potential benefits accruing to philopatric offspring have previously been studied in this species, the potential costs of dispersal have received less attention. We contrasted survival rates, nutritional status, injuries and reproductive output of dispersing and non-dispersing male and female foxes in an urban population to assess the relative costs of dispersal versus natal philopatry. Mortality rates were not significantly higher for dispersing foxes, either in the short- or long-term. There was no evidence of increased nutritional stress in dispersing individuals. Dispersing individuals did, however, exhibit greater levels of wounding, although this did not appear to affect survival. Dispersing females were more likely to miss a breeding opportunity early in their reproductive lifespan. In contrast, both dispersing and non-dispersing males were unlikely to breed in their first year. We conclude that the major fitness component in females affected by dispersing is age at first reproduction.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The presumption that the synthesis of 'defence' compounds in plants must incur some 'trade-off' or penalty in terms of annual crop yields has been used to explain observed inverse correlations between resistance to herbivores and rates of growth or photosynthesis. An analysis of the cost of making secondary compounds suggests that this accounts for only a small part of the overall carbon budget of annual crop plants. Even the highest reported amounts of secondary metabolites found in different crop species (flavonoids, allylisothiocyanates, hydroxamic acids, 2-tridecanone) represent a carbon demand that can be satisfied by less than an hour's photosynthesis. Similar considerations apply to secondary compounds containing nitrogen or sulphur, which are unlikely to represent a major investment compared to the cost of making proteins, the major demand for these elements. Decreases in growth and photosynthesis in response to stress are more likely the result of programmed down-regulation. Observed correlations between yield and low contents of unpalatable or toxic compounds may be the result of parallel selection during the refinement of crop species by humans.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Question: What are the life-history costs for a predatory insect of surviving parasitoid attack, and can parasitoid attack alter predator-prey interactions? Hypotheses: Survivorship is influenced by host age. Hosts that suffer parasitoid attack grow more slowly and consume fewer prey. Those that survive attack are smaller as adults and show reduced survivorship. Organisms: The aphidophagous hoverfly Episyrphus balteatus, its endoparasitoid wasp Diplazon laetatorius and its prey, the pea aphid, Acyrthosiphon pisum. Site of experiments: All experiments were conducted in controlled temperature rooms and chambers in the laboratory. Methods: Episyrphus balteatus larvae of each instar were exposed to attack by Diplazon laetatorius, then dissected to measure the encapsulation response (a measure of immunity). Second instar larvae were either attacked or not attacked by D. laetatorius. Their development rates and numbers of prey consumed were noted. The size and survivorship of surviving (immune) and control hoverflies were compared following eclosion. Conclusions: Successful immune response increased with larval age (first instar 0%, second instar 40%, third instar 100% survival). Second instar larvae that successfully resisted parasitoid attack were larger as pupae (but not as adults) and showed reduced adult survivorship. Female adult survivors were more likely than male survivors to have died within 16 days of eclosion, but there was no difference between unattacked male and female control hoverflies. Attacked larvae, irrespective of immune status, consumed fewer aphids than unattacked individuals. Episyrphus balteatus suffers significant costs of resisting parasitoid attack, and parasitoid attack can reduce the top-down effects of an insect predator, irrespective of whether the host mounts an immune response or not.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Modern organisms are adapted to a wide variety of habitats and lifestyles. The processes of evolution have led to complex, interdependent, well-designed mechanisms of todays world and this research challenge is to transpose these innovative solutions to resolve problems in the context of architectural design practice, e.g., to relate design by nature with design by human. In a design by human environment, design synthesis can be performed with the use of rapid prototyping techniques that will enable to transform almost instantaneously any 2D design representation into a physical three-dimensional model, through a rapid prototyping printer machine. Rapid prototyping processes add layers of material one on top of another until a complete model is built and an analogy can be established with design by nature where the natural lay down of earth layers shapes the earth surface, a natural process occurring repeatedly over long periods of time. Concurrence in design will particularly benefit from rapid prototyping techniques, as the prime purpose of physical prototyping is to promptly assist iterative design, enabling design participants to work with a three-dimensional hardcopy and use it for the validation of their design-ideas. Concurrent design is a systematic approach aiming to facilitate the simultaneous involvment and commitment of all participants in the building design process, enabling both an effective reduction of time and costs at the design phase and a quality improvement of the design product. This paper presents the results of an exploratory survey investigating both how computer-aided design systems help designers to fully define the shape of their design-ideas and the extent of the application of rapid prototyping technologies coupled with Internet facilities by design practice. The findings suggest that design practitioners recognize that these technologies can greatly enhance concurrence in design, though acknowledging a lack of knowledge in relation to the issue of rapid prototyping.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Identification of cost-determinant variables and evaluation of their degree of influence play an essential role in building reliable cost models and enhance the competitive edge of quantity surveyors as well as contracting organisations. Sixty-seven variables affecting pre-tender construction cost estimates are identified through literature and interviews. These factors are grouped into six categories and a comparison analysis of their impact is conducted. Priority ranking of cost-influencing factors is carried out using a questionnaire survey commissioned amongst quantity surveyors based in the UK. Findings of this survey indicate that there is a strong agreement between quantity surveyors in ranking cost-influencing factors of construction projects. Comparisons between the outcomes of this research and other related studies are presented.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A wide-ranging multiprofessional research project explored issues relating to the introduction of assistive technology into the existing homes of older people in order to provide them with the opportunity to remain at home. The financial relationship between assistive technology and packages of formal care was also explored. The costs of residential care and those of a number of packages containing differing quantities of assistive technology, formal care and informal care were compared. The analyses provide a strong financial case for substituting and/or supplementing formal care with assistive technology, even for individuals with quite disabling conditions. Although needs and hence the cost of provision rise with an increasing level of disability, the savings in care costs accrue quickly. The consideration of a variety of users with different needs and informal care provision, and occupying a very wide range of housing, leads to the conclusion that in comparison with traditional care packages, at worst, incorporating significant amounts of assistive technology into care packages is cost neutral, but that with careful specification of assistive technology major savings are feasible.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An overtly critical perspective on 're-engineering construction' is presented. It is contended that re-engineering is impossible to define in terms of its substantive content and is best understood as a rhetorical label. In recent years, the language of re-engineering has heavily shaped the construction research agenda. The declared goals are to lower costs and improve value for the customer. The discourse is persuasive because it reflects the ideology of the 'enterprise culture' and the associated rhetoric of customer responsiveness. Re-engineering is especially attractive to the construction industry because it reflects and reinforces the existing dominant way of thinking. The overriding tendency is to reduce organizational complexities to a mechanistic quest for efficiency. Labour is treated as a commodity. Within this context, the objectives of re-engineering become 'common sense'. Knowledge becomes subordinate to the dominant ideology of neo-liberalism. The accepted research agenda for re-engineering construction exacerbates the industry's problems and directly contributes to the casualization of the workforce. The continued adherence to machine metaphors by the construction industry's top management has directly contributed to the 'bad attitudes' and 'adversarial culture' that they repeatedly decry. Supposedly neutral topics such as pre-assembly, partnering, supply chain management and lean thinking serve only to justify the shift towards bogus labour-only subcontracting and the associated reduction of employment rights. The continued casualization of the workforce raises real questions about the industry's future capacity to deliver high-quality construction. In order to appear 'relevant' to the needs of industry, it seems that the research community is doomed to perpetuate this regressive cycle.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Collaborative working methods offer the hope of reduced waste, lower tendering costs and improved outputs. The costs of tendering may be influenced by the introduction of different working methods. Transaction cost economics appears to offer an analytical framework for studying the costs of tendering, but it is more to do with providing explanations at the institutional/industry level, not at the level of individual projects. Surveys and interviews were carried out with small samples in UK. The data show that that while tendering costs are not necessarily higher in collaborative working arrangements, there is no correlation between costs of tendering and the way the work is organized. Practitioners perceive that the benefits of working in collaborative procurement routes far outweigh the costs. Tendering practices can be improved to avoid waste, and the suggested improvements include restricting selective tendering lists to 23 bidders, letting bidders know who they are competing with, reimbursing tendering costs for aborted projects and ensuring that timely and comprehensive information is provided to bidders.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In developing techniques for monitoring the costs associated with different procurement routes, the central task is disentangling the various project costs incurred by organizations taking part in construction projects. While all firms are familiar with the need to analyse their own costs, it is unusual to apply the same kind of analysis to projects. The purpose of this research is to examine the claims that new, ways of working such as strategic alliancing and partnering bring positive business benefits. This requires that costs associated with marketing, estimating, pricing, negotiation of terms, monitoring of performance and enforcement of contract are collected for a cross-section of projects under differing arrangements, and from those in the supply, chain from clients to consultants, contractors, subcontractors and suppliers. Collaboration with industrial partners forms the basis for developing a research instrument, bused on time sheets, which will be relevant for all those taking part in the work. The signs are that costs associated with,with tendering are highly variable, 1-15%, depending upon what precisely, is taken into account. The research to date reveals that there are mechanisms for measuring the costs of transactions and these will generate useful data for subsequent analysis.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The commercial process in construction projects is an expensive and highly variable overhead. Collaborative working practices carry many benefits, which are widely disseminated, but little information is available about their costs. Transaction Cost Economics is a theoretical framework that seeks explanations for why there are firms and how the boundaries of firms are defined through the “make-or-buy” decision. However, it is not a framework that offers explanations for the relative costs of procuring construction projects in different ways. The idea that different methods of procurement will have characteristically different costs is tested by way of a survey. The relevance of transaction cost economics to the study of commercial costs in procurement is doubtful. The survey shows that collaborative working methods cost neither more nor less than traditional methods. But the benefits of collaboration mean that there is a great deal of enthusiasm for collaboration rather than competition.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In an attempt to focus clients' minds on the importance of considering the construction and maintenance costs of a commercial office building (both as a factor in staff productivity and as a fraction of lifetime staff costs) there is an often-quoted ratio of costs of 1:5:200, where for every one pound spent on construction cost, five are spent on maintenance and building operating costs and 200 on staffing and business operating costs. This seems to stem from a paper published by the Royal Academy of Engineering, in which no data is given and no derivation or defence of the ratio appears. The accompanying belief that higher quality design and construction increases staff productivity, and simultaneously reduces maintenance costs, how ever laudable, appears unsupported by research, and carries all the hallmarks of an "urban myth". In tracking down data about real buildings, a more realistic ratio appears to depend on a huge variety of variables, as well as the definition of the number of "lifetime" years. The ill-defined origins of the original ratio (1:5:200) describing these variables have made replication impossible. However, by using published sources of data, we have found that for three office buildings, a more realistic ratio is 1:0.4:12. As there is nothing in the public domain about what comprised the original research that gave rise to 1:5:200, it is not possible to make a true comparison between these new calculations and the originals. Clients and construction professionals stand to be misled because the popularity and widespread use of the wrong ratio appears to be mis-informing important investment and policy decisions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Meeting the demand for independent living from the increasing number of older people presents a major challenge for society, government and the building industry. Older people's experience of disabling conditions can be affected by the design and layout of their accommodation. Adaptations and assistive technology (AT) are a major way of addressing this gap between functional capacity and the built environment. The degree of adaptability and the differences in the average cost of adaptation of different types of property are large and there is major variation within property type. Based on a series of user profiles, it was found that a comprehensive package of adaptations and AT is likely to result in significant economies arising from a reduction in the need for formal care services. This finding is sensitive to assumptions about how long an individual would use the adaptations and AT, as well as to the input of informal care and the nature of their accommodation. The present study, which focused on social housing, has implications for how practitioners specify ways of meeting individual needs as well as providing a case to support the substantial increase in demand for specialist adaptation work.