945 resultados para Infrastructure Projects


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Live projects adopt a wide range of approaches: design/ build, community engagement, participation, protest, analysis, etc. They are driven by tutors with passion, expertise and the ability to manage risk, in ways that exhibit fluency and high levels of skill. They also offer sites of student-led and community co-learning, can support research, demonstrate ‘impact’ and satisfy universities’ policies on outreach. Whilst the breadth and reach of Live Projects is now demonstrably wide, we still fail to fully locate Live Projects within a pedagogical context, tending instead to limit our descriptions and hence analysis to the architectural process and outcome. This failure to locate Live Projects within a pedagogical framework means we still struggle to encapsulate, critique, progress, and indeed, elevate the work.

This chapter draws on some of the case studies presented in recent papers and international conferences in order to provide educators with signposts and important overviews around which and in respect to they can develop their own pedagogical frameworks.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

While WiFi monitoring networks have been deployed in previous research, to date none have assessed live network data from an open access, public environment. In this paper we describe the construction of a replicable, independent WLAN monitoring system and address some of the challenges in analysing the resultant traffic. Analysis of traffic from the system demonstrates that basic traffic information from open-access networks varies over time (temporal inconsistency). The results also show that arbitrary selection of Request-Reply intervals can have a significant effect on Probe and Association frame exchange calculations, which can impact on the ability to detect flooding attacks.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A substantial amount of the 'critical mass' of digital data available to scholarship contains place-names, and it is now recognised that spatial and temporal data points, including place-names, are a vital part of the e-research infrastructure that supports the use, re-use and advanced analysis of data using ICT tools and methods. Place-names can also be linked semantically to contribute to the web of data, and to enrich content through linking existing data, and identifying new collections for digitization to strategically enhance existing digital collections. However, existing e-projects rely on modern gazetteers limiting them to the modern and the near-contemporary. This workshop explored how to further integrate the wealth of historical place-name scholarship, and the resulting digital resources generated within UK academia, so enabling integration of local knowledge over much longer periods.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Participant recruitment is understood to be one of the most difficult aspects of the research process. Researchers are now devoting increasing amounts of time and resources to understand how participants decide to take part in research and what researchers can do to make their work appeal to potential participants. The purpose of the study is to assess the problems experienced by researchers in Northern Ireland when recruiting human participants into trials and studies and to gain insight into how researchers handle and overcome these issues. The main research question being addressed by this research is to develop an understanding of the problems experienced by staff when recruiting human participants to research projects. Methods used to increase study recruitment were also examined. The participants in this research are investigators and other associated staff on research studies based in Northern Ireland. Potential participants were identified through contacts with research active organizations such as the academic researchers in Queen’s University Belfast and research physicians and clinical trialists employed by the Belfast Health and Social Care Trust. Each organization forwarded on the survey request via email or newsletters. Researchers willing to take part accessed the questionnaire through the Survey Monkey website. This study utilised a cross-sectional questionnaire design.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The cycle of the academic year impacts on efforts to refine and improve major group design-build-test (DBT) projects since the time to run and evaluate projects is generally a full calendar year. By definition these major projects have a high degree of complexity since they act as the vehicle for the application of a range of technical knowledge and skills. There is also often an extensive list of desired learning outcomes which extends to include professional skills and attributes such as communication and team working. It is contended that student project definition and operation, like any other designed product, requires a number of iterations to achieve optimisation. The problem however is that if this cycle takes four or more years then by the time a project’s operational structure is fine tuned it is quite possible that the project theme is no longer relevant. The majority of the students will also inevitably experience a sub-optimal project experience over the 5 year development period. It would be much better if the ratio were flipped so that in 1 year an optimised project definition could be achieved which had sufficient longevity that it could run in the same efficient manner for 4 further years. An increased number of parallel investigators would also enable more varied and adventurous project concepts to be examined than a single institution could undertake alone in the same time frame.
This work-in-progress paper describes a parallel processing methodology for the accelerated definition of new student DBT project concepts. This methodology has been devised and implemented by a number of CDIO partner institutions in the UK & Ireland region. An agreed project theme was operated in parallel in one academic year with the objective of replacing a multi-year iterative cycle. Additionally the close collaboration and peer learning derived from the interaction between the coordinating academics facilitated the development of faculty teaching skills in line with CDIO standard 10.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The proliferation of media services enabled by digital technologies poses a serious challenge to public service broadcasting rationales based on media scarcity. Looking to the past and future, we articulate an important role that the Australian Broadcasting Corporation (ABC) might play in the digital age. We argue that historically the ABC has acted beyond its institutional broadcasting remit to facilitate cultural development and, drawing on the example of Pool (an online community of creative practitioners established and maintained by the ABC), point to a key role it might play in fostering network innovation in what are now conceptualised as the creative industries.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this research is to identify and assess the opportunities and challenges of implementing a Site Waste Management Plan (SWMP) on projects irrespective of size. In the UK, construction and demolition waste accounts for a third of all UK waste. There are a number of factors that influence the implementation of SWMPs. In order to identify and analyse these factors, 4 unstructured interviews were carried out and a sample of 56 participants completed a questionnaire survey. The scope of the study was limited to UK
construction industry professionals. The analysis revealed that more needs to be done if the industry is to meet government targets of reduction in construction related waste going to landfill. In addition, although SWMP may not yet be legally required on all construction projects, clients and contractors need to realise
the benefits to cut costs and implement best practice by adopting a SWMP. The benefits of implementing a SWMP will not only help to achieve this but also gain significant cost savings on projects and is also extremely beneficial to the environment. This study presents evidence that contractors need to do more to reduce waste and draws a clear link between waste reduction and the implementation of SWMPs. The findings are useful in the ongoing efforts to encourage the industry to find smarter, more efficient and less
damaging ways to operate