949 resultados para Hydraulic transmissions.


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Abstract: Preferential flow and transport through macropores affect plant water use efficiency and enhance leaching of agrochemicals and the transport of colloids, thereby increasing the risk for contamination of groundwater resources. The effects of soil compaction, expressed in terms of bulk density (BD), and organic carbon (OC) content on preferential flow and transport were investigated using 150 undisturbed soil cores sampled from 15 × 15–m grids on two field sites. Both fields had loamy textures, but one site had significantly higher OC content. Leaching experiments were conducted in each core by applying a constant irrigation rate of 10 mm h−1 with a pulse application of tritium tracer. Five percent tritium mass arrival times and apparent dispersivities were derived from each of the tracer breakthrough curves and correlated with texture, OC content, and BD to assess the spatial distribution of preferential flow and transport across the investigated fields. Soils from both fields showed strong positive correlations between BD and preferential flow. Interestingly, the relationships between BD and tracer transport characteristics were markedly different for the two fields, although the relationship between BD and macroporosity was nearly identical. The difference was likely caused by the higher contents of fines and OC at one of the fields leading to stronger aggregation, smaller matrix permeability, and a more pronounced pipe-like pore system with well-aligned macropores.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The present work aims to achieve and further develop a hydrogeomechanical approach in Caldas da Cavaca hydromineral system rock mass (Aguiar da Beira, NW Portugal), and contribute to a better understanding of the hydrogeological conceptual site model. A collection of several data, namely geology, hydrogeology, rock and soil geotechnics, borehole hydraulics and hydrogeomechanics, was retrieved from three rock slopes (Lagoa, Amores and Cancela). To accomplish a comprehensive analysis and rock engineering conceptualisation of the site, a multi‐technical approach were used, such as, field and laboratory techniques, hydrogeotechnical mapping, hydrogeomechanical zoning and hydrogeomechanical scheme classifications and indexes. In addition, a hydrogeomechanical data analysis and assessment, such as Hydro‐Potential (HP)‐Value technique, JW Joint Water Reduction index, Hydraulic Classification (HC) System were applied on rock slopes. The hydrogeomechanical zone HGMZ 1 of Lagoa slope achieved higher hydraulic conductivities with poorer rock mass quality results, followed by the hydrogeomechanical zone HGMZ 2 of Lagoa slope, with poor to fair rock mass quality and lower hydraulic parameters. In addition, Amores slope had a fair to good rock mass quality and the lowest hydraulic conductivity. The hydrogeomechanical zone HGMZ 3 of Lagoa slope, and the hydrogeomechanical zones HGMZ 1 and HGMZ 2 of Cancela slope had a fair to poor rock mass quality but were completely dry. Geographical Information Systems (GIS) mapping technologies was used in overall hydrogeological and hydrogeomechanical data integration in order to improve the hydrogeological conceptual site model.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A concretização deste estágio na INCBIO teve como principal objetivo o projeto e dimensionamento de uma unidade de produção de biodiesel por transesterificação nãocatalítica num reator ultrassónico com condições supercríticas de pressão e temperatura. Com vista à concretização do trabalho, iniciou-se a realização do estudo do estado da arte relativo à produção de biodiesel, com particular enfoque na produção de biodiesel por via catalítica e por via supercrítica e na produção de biodiesel com uso de tecnologia ultrassónica. Conclui-se que nenhum estudo contempla a combinação simultânea da produção de biodiesel por via supercrítica através da tecnologia ultrassónica. Este estudo do estado da arte permitiu ainda definir as condições de temperatura, pressão e rácio mássico (250 °C, 95 bar e 1:1 respetivamente) a considerar no projeto da unidade de produção de biodiesel deste trabalho. Com base no estudo do estado da arte efetuado e com base nas características da matéria procedeu-se à definição do processo de produção de biodiesel. Para a definição do processo começou-se por elaborar o diagrama de blocos do processo (BFD) e o diagrama de fluxo do processo (PFD). Com base nos diagramas e na composição da matéria-prima, procedeu-se à quantificação dos reagentes (metanol) com base na estequiometria das reações envolvidas e ao cálculo do balanço de massa. O balanço de massa foi calculado com base na estequiometria das reações envolvidas e foi também calculado através do software de simulação ASPEN PLUS. Após o cálculo do balanço de massa elaborou-se o diagrama de tubulação e instrumentação (P&ID), que contém todos os equipamentos, válvulas, instrumentação e tubagens existentes na unidade. Após a definição do processo e cálculo do balanço de massa procedeu-se ao dimensionamento mecânico e cálculo hidráulico dos tanques, tubagem, bombas, permutador de calor, reator ultrassónico, válvulas de controlo e instrumentação de acordo com as normas ASME. Nesta fase do trabalho foram consultados diversos fornecedores possíveis para a compra de todo o material necessário. O dimensionamento mecânico e cálculo hidráulico efetuados permitiram, entre outras informações relevantes, obter as dimensões necessárias à construção do layout e à elaboração do desenho 3D. Com os resultados obtidos e desenhos elaborados, é possível avançar com a construção da unidade, pelo que pode-se inferir que o objetivo de projetar uma unidade de produção de biodiesel num reator ultrassónico com condições supercríticas foi alcançado. Por fim, efetuou-se uma análise económica detalhada que possibilita a comparação de uma unidade de produção de biodiesel por via catalítica (unidade de produção da INCBIO) com a unidade de produção de biodiesel num reator ultrassónico com condições supercríticas (unidade projetada neste trabalho). Por questões de confidencialidade, não foram revelados maior parte dos resultados da análise económica efetuada. No entanto, conclui-se que os custos de construção da unidade de produção de biodiesel num reator ultrassónico com condições supercríticas são mais baixos cerca de 35 a 40%, quando comparados com os custos de construção da unidade de produção de biodiesel por via catalítica, evidenciando assim que a combinação em simultâneo das condições supercríticas com a tecnologia ultrassónica possibilita a diminuição dos custos de produção.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

As afluências indevidas resultantes direta ou indiretamente da precipitação são um dos principais fatores que provocam graves problemas de carácter ambiental, estrutural e económico, no âmbito de um bom funcionamento dos sistemas separativos de saneamento e tratamento de águas residuais urbanas. Ao longo dos anos, com a expansão do serviço de saneamento à população, tem sido reconhecido que os caudais excedentes às redes de drenagem de águas residuais e estações de tratamento são um problema grave e para isso estão a ser criados critérios cada vez mais exigentes no domínio da gestão e operação destes sistemas de saneamento. Para uma melhor compreensão sobre a incidência das afluências indevidas nos sistemas de saneamento e nas estações de tratamento de águas residuais, é necessário realizar estudos de quantificação e caracterização no sistema de esgotos. Com a necessidade de compreender a plenitude e natureza deste problema, tornou-se necessário desenvolver metodologias com o objetivo de melhorar a eficiência e eficácia hidráulica dos sistemas de drenagem e de tratamento. Este trabalho tem como objetivo a análise quantitativa das afluências indevidas, recorrendo a um caso de estudo de uma bacia de drenagem de águas residuais. Para adquirir mais conhecimento sobre o tema foi necessário recolher várias metodologias existentes de maneira a selecionar, estudar e aplicar o método mais vantajoso. Nesta dissertação, foram utilizados dados disponibilizados pela SIMRIA, no que respeita aos caudais de bombagem da estação elevatória a que afluiu a rede em estudo, e pela INDAQUA Feira, no que respeita aos dados de precipitação.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

O presente relatório é o corolário do Estágio Curricular que a autora efetuou, durante o segundo semestre do ano letivo de 2014/2015 na SBS – Engenharia Civil, Hidráulica e Ambiente, Lda. Nesta empresa a autora foi integrada na equipa técnica que elaborou um Projeto de Execução para uma Estação de Tratamento de Águas Residuais que irá ser construída em Montemor-o-Novo, tendo-lhe sido atribuídas as seguintes tarefas principais: i) estudo de ferramentas de dimensionamento de ETAR; e ii) estudo dos processos de tratamento de águas residuais a instalar. O tratamento de águas residuais não é matéria que conste do atual Plano de Estudos do Mestrado em Engenharia Civil do ISEP. Este facto, associado à premente necessidade de dar resposta às expectativas da Entidade Acolhedora, obrigou a autora a um esforço de aprendizagem significativo. Nesta fase foi executada uma aprofundada pesquisa bibliográfica que permitiu à autora obter o nível de conhecimentos teóricos necessário para a plena integração na Equipa de Projeto. Já integrada na Equipa de Projeto o primeiro trabalho desenvolvido pela autora foi a análise detalhada do Caderno de Encargos e da respetiva Nota Técnica. Seguidamente a autora participou em todas as fases do Projeto tendo, por isso, colaborado na análise do Estudo Geotécnico, no dimensionamento dos órgãos da ETAR, no cálculo do perfil hidráulico, na definição de formas (plantas e cortes) dos órgãos, na elaboração da Lista de Equipamentos e do Mapa de Quantidades e, por último, na elaboração da Memória Descritiva e Justificativa do Processo de Tratamento e Equipamentos. O Caso Prático incluído no presente documento é, em larga medida, o corolário do processo de aprendizagem de que a autora beneficiou no decorrer do Estágio Curricular. Grande parte das tarefas que a autora executou ao longo da elaboração do projeto relacionaram-se com o dimensionamento dos órgãos da ETAR e com os respetivos cálculos hidráulicos. Os conhecimentos teórico-práticos desta forma adquiridos foram reunidos num conjunto de ferramentas, maioritariamente folhas de cálculo, que se verificou serem úteis nos processos de dimensionamento e de teste de soluções alternativas. É parte integrante deste relatório um capítulo no qual é feita uma detalhada apresentação dos conceitos teóricos subjacentes ao Projeto de ETAR. Este capítulo reflete o estudo que a autora teve necessidade de efetuar antes de se sentir capaz de integrar a Equipa de Projeto.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Restoration of Buildings and Monuments, vol. 13, nº 6 (2007), p.389-400

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Enhanced biological phosphorus removal (EBPR) is the most economic and sustainable option used in wastewater treatment plants (WWTPs) for phosphorus removal. In this process it is important to control the competition between polyphosphate accumulating organisms (PAOs) and glycogen accumulating organisms (GAOs), since EBPR deterioration or failure can be related with the proliferation of GAOs over PAOs. This thesis is focused on the effect of operational conditions (volatile fatty acid (VFA) composition, dissolved oxygen (DO) concentration and organic carbon loading) on PAO and GAO metabolism. The knowledge about the effect of these operational conditions on EBPR metabolism is very important, since they represent key factors that impact WWTPs performance and sustainability. Substrate competition between the anaerobic uptake of acetate and propionate (the main VFAs present in WWTPs) was shown in this work to be a relevant factor affecting PAO metabolism, and a metabolic model was developed that successfully describes this effect. Interestingly, the aerobic metabolism of PAOs was not affected by different VFA compositions, since the aerobic kinetic parameters for phosphorus uptake, polyhydroxyalkanoates (PHAs) degradation and glycogen production were relatively independent of acetate or propionate concentration. This is very relevant for WWTPs, since it will simplify the calibration procedure for metabolic models, facilitating their use for full-scale systems. The DO concentration and aerobic hydraulic retention time (HRT) affected the PAO-GAO competition, where low DO levels or lower aerobic HRT was more favourable for PAOs than GAOs. Indeed, the oxygen affinity coefficient was significantly higher for GAOs than PAOs, showing that PAOs were far superior at scavenging for the often limited oxygen levels in WWTPs. The operation of WWTPs with low aeration is of high importance for full-scale systems, since it decreases the energetic costs and can potentially improve WWTP sustainability. Extended periods of low organic carbon load, which are the most common conditions that exist in full-scale WWTPs, also had an impact on PAO and GAO activity. GAOs exhibited a substantially higher biomass decay rate as compared to PAOs under these conditions, which revealed a higher survival capacity for PAOs, representing an advantage for PAOs in EBPR processes. This superior survival capacity of PAOs under conditions more closely resembling a full-scale environment was linked with their ability to maintain a residual level of PHA reserves for longer than GAOs, providing them with an effective energy source for aerobic maintenance processes. Overall, this work shows that each of these key operational conditions play an important role in the PAO-GAO competition and should be considered in WWTP models in order to improve EBPR processes.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

As intervenções arqueológicas concretizadas entre 1999-2001 permitiram o reconhecimento de contextos referentes ao Hospital Real de Todos-os-Santos, nomeadamente o claustro NE, bem como uma estrutura hidráulica no seu perímetro interno. A identificação do espólio cerâmico e vítreo aqui descartado permite, numa primeira fase, a aferição cronológica e tipológica destes e, consequentemente, do perfil funcional (utilitário, de cozinha e medicinal), numa tentativa de padronização do conjunto arte factual no edifício hospitalar e na cidade de Lisboa. Num segundo estágio, pretendese obter uma leitura concreta no que concerne ao período de utilização desta estrutura, indo de encontro às distintas áreas a vigorar no espaço claustral.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Knowledge of the spatial distribution of hydraulic conductivity (K) within an aquifer is critical for reliable predictions of solute transport and the development of effective groundwater management and/or remediation strategies. While core analyses and hydraulic logging can provide highly detailed information, such information is inherently localized around boreholes that tend to be sparsely distributed throughout the aquifer volume. Conversely, larger-scale hydraulic experiments like pumping and tracer tests provide relatively low-resolution estimates of K in the investigated subsurface region. As a result, traditional hydrogeological measurement techniques contain a gap in terms of spatial resolution and coverage, and they are often alone inadequate for characterizing heterogeneous aquifers. Geophysical methods have the potential to bridge this gap. The recent increased interest in the application of geophysical methods to hydrogeological problems is clearly evidenced by the formation and rapid growth of the domain of hydrogeophysics over the past decade (e.g., Rubin and Hubbard, 2005).

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Introduction/objectives: Multipatient use of a single-patient CBSD occurred inan outpatient clinic during 4 to 16 months before itsnotification. We looked for transmission of blood-bornepathogens among exposed patients.Methods: Exposed patients underwent serology testing for HBV,HCV and HIV. Patients with isolated anti-HBc receivedone dose of hepatitis B vaccine to look for a memoryimmune response. Possible transmissions were investigatedby mapping visits and sequencing of the viral genomeif needed.Results: Of 280 exposed patients, 9 had died without suspicionof blood-borne infection, 3 could not be tested, and 5declined investigations. Among the 263 (93%) testedpatients, 218 (83%) had negative results. We confirmeda known history of HCV infection in 6 patients (1 coinfectedby HIV), and also identified resolved HBVinfection in 37 patients, of whom 18 were alreadyknown. 2 patients were found to have a previouslyunknown HCV infection. According to the time elapsedfrom the closest previous visit of a HCV-infected potentialsource patient, we could rule out nosocomial transmissionin one case (14 weeks) but not in the other (1day). In the latter, however, transmission was deemedvery unlikely by 2 reference centers based on thesequences of the E1 and HVR1 regions of the virus.Conclusion: We did not identify any transmission of blood-bornepathogens in 263 patients exposed to a single-patientCBSD, despite the presence of potential source cases.Change of needle and disinfection of the device betweenpatients may have contributed to this outcome.Although we cannot exclude transmission of HBV, previousacquisition in endemic countries is a more likelyexplanation in this multi-national population.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The purpose of this study is to improve the potential energy recovery to electric energy in an electrohydraulic forklift system. The initial achieved result for energy saving ratio after structural optimization is 40 %. Component optimization is applied to the tested drive which consists of a DTC controlled electric servo motor directly running a reversible hydraulic pump. According to the study the energy efficiency and the energy recovery from the electro-hydraulic forklift system can be increased by 11 % units. New ideas and directions of further research were obtained during the study.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A study has been conducted focusing on how the phosphorus renrx)val efficiency of a constructed wetland (CW) can be optimized through the selective enrichment of the substratum. Activated alumina and powdered iron were examined as possible enrichment compounds. Using packed glass column trials it was found that alumina was not suitable for the renx)val of ortho-phosphate from solution, while mixtures of powdered iron and quartz sand proved to be very efficient. The evaluation of iron/sand mixtures in CWs planted with cattails was performed in three stages; first using an indoor lab scale wetland, then an outdoor lab scale wetland, and finally in a small scale pilot project. For the lab scale tests, three basic configurations were evaluated: using the iron/sand as a pre-filter, in the root bed. and as a post filter. Primary lagoon effluent was applied to the test cells to simulate actual CW conditions, and the total phosphorus and iron concentrations of the influent and effluent were nfK)nitored. The pilot scale trials were limited to using only a post filter design, due to in-progress research at the pilot site. The lab scale tests achieved average renrK>val efficiencies greater than 91% for all indoor configurations, and greater than 97% for all outdoor configurations. The pilot scale tests had an average renK)val efficiency of 60%. This relatively low efficiency in the pilot scale can be attributed to the post filters being only one tenth the size of the lab scale test in terms of hydraulic loading (6 cm/day vs. 60 cm/day).

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Bank stabilization structures are used to prevent the loss of valuable land within the urban environment and the decision for the type of structure used depends on the properties of the stream. In the urban areas of Southern Ontario there is a preference for the use of armourstone blocks as bank stabilization. The armourstone revetment is a free standing stone structure with large blocks of stone layered vertically and offset from one another. During fieldwork at Forty Mile Creek in Grimsby, Ontario armourstone failure was identified by the removal of two stones within one column from the wall. Since the footer stones were still in place, toe scour was eliminated as a cause of failure. Through theoretical, field, and experimental work the process of suction has been identified as a mode of failure for the armourstone wall and the process of suction works similarly to quarrying large blocks of rock off bedrock streambeds. The theory of lateral suction has previously not been taken into consideration for the design of these walls. The physical and hydraulic evidence found in the field and studied during experimental work indicate that the armourstone wall is vulnerable to the process of suction. The forces exerted by the flow and the resistance of the block determine the stability of the armourstone block within the wall. The design of the armourstone wall, high surface velocities, and short pulses of faster flowing water within the profile could contribute to armourstone failure by providing the forces needed for suction to occur, therefore adjustments to the design of the wall should be made in order to limit the effect.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The lithograph, "General view of lands, tunnel and docks of Niagara River Hydraulic Tunnel, Power and Sewer Company," called for p. [4] in the Index, has been removed and encapsulated, and is shelved separately.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Power at the Falls: The first recorded harnessing of Niagara Falls power was in 1759 by Daniel Joncairs. On the American side of the Falls he dug a small ditch and drew water to turn a wheel which powered a sawmill. In 1805 brothers Augustus and Peter Porter expanded on Joncairs idea. They bought the American Falls from New York State at public auction. Using Joncairs old site they built a gristmill and tannery which stayed in business for twenty years. The next attempt at using the Falls came in 1860 when construction of the hydraulic canal began by the Niagara Falls Hydraulic Power and Manufacturing Co. The canal was complete in 1861 and brought water from the Niagara river, above the falls, to the mills below. By 1881 the Niagara Falls Hydraulic Power and Manufacturing Co. had a small generating station which provided some electricity to the village of Niagara Falls and the Mills. This lasted only four years and then the company sold its assets at public auction due to bankruptcy. Jacob Schoellkopf arrived at the Falls in 1877 with the purchase of the hydraulic canal land and water and power rights. In 1879 Schoellkopf teamed up with Charles Brush (of Euclid Ohio) and powered Brush’s generator and carbon arc lights with the power from his water turbines, to illuminate the Falls electrically for the first time. The year 1895 marked the opening of the Adam No. 1 generating station on the American side. The station was the beginnings of modern electrical utility operations. The design and operations of the generating station came from worldwide competitions held by panels of experts. Some who were involved in the project include; George Westinghouse, J. Pierpont Morgan, Lord Kelvin and Nikoli Tesla. The plants were operated by the Niagara Falls Power Company until 1961, when the Robert Moses Plant began operation in Lewiston, NY. The Adams plants were demolished that same year and the site used as a sewage treatment plant. The Canadian side of the Falls began generating their own power on January 1, 1905. This power came from the William Birch Rankine Power Station located 500 yards above the Horseshoe Falls. This power station provided the village of Fort Erie with its first electricity in 1907, using its two 10,000 electrical horsepower generators. Today 11 generators produce 100,000 horsepower (75 megawatts) and operate as part of the Niagara Mohawk and Fortis Incorporated Power Group.