This report is the culmination of a two-stage research project to inform the Australian property and construction industry generally, in addition to providing the Australian Building Codes Board (ABCB) with information to allow it to determine whether or not sustainability requirements are necessary in the Future Building Code of Australia (BCA21). The Australian Building Codes Board is a joint initiative of all levels of government in Australia. The Board’s mission is to provide for efficiency and cost effectiveness in meeting community expectations for health, safety and amenity in the design, construction and use of buildings through the creation of nationally consistent building codes, standards, regulatory requirements and regulatory systems. The Stage 1 (literature review) and Stage 2 (workshops) reports are intended to be read in conjunction with one another. These reports and the Database are provided as appendices. The Conclusions of this, the final report, are the result of the overall program of work.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Policy instruments of education, regulation, fines and inspection have all been utilised by Australian jurisdictions as they attempt to improve the poor performance of occupational health and safety (OH&S) in the construction industry. However, such policy frameworks have been largely uncoordinated across Australia, resulting in differing policy systems, with differing requirements and compliance systems. Such complexity, particularly for construction firms operating across jurisdictional borders, led to various attempts to improve the consistency of OH&S regulation across Australia, four of which will be reviewed in this report. 1. The first is the Occupational Health and Safety Act 1991 (Commonwealth) which enabled certain organisations to opt out of state based regulatory regimes. 2. The second is the development of national standards, codes of practice and guidance documents by the National Occupational Health and Safety Council (NOHSC). The intent was that the OHS requirements, principles and practices contained in these documents would be adopted by state and territory governments into their legislation and policy, thereby promoting regulatory consistency across Australia. 3. The third is the attachment of conditions to special purpose payments from the Commonwealth to the States, in the form of OH&S accreditation with the Office of the Federal Safety Commissioner. 4. The fourth is the development of national voluntary codes of OHS practice for the construction industry. It is interesting to note that the tempo of change has increased significantly since 2003, with the release of the findings of the Cole Royal Commission. This paper examines and evaluates each of these attempts to promote consistency across Australia. It concludes that while there is a high level of information sharing between jurisdictions, particularly from the NOSHC standards, a fragmented OH&S policy framework still remains in place across Australia. The utility of emergent industry initiatives such as voluntary codes and guidelines for safer construction practices to enhance consistency are discussed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In Australia, between 1994 and 2000, 50 construction workers were killed each year as a result of their work, the industry fatality rate, at 10.4 per 100,000 persons, is similar to the national road toll fatality rate and the rate of serious injury is 50% higher than the all industries average. This poor performance represents a significant threat to the industry’s social sustainability. Despite the best efforts of regulators and policy makers at both State and Federal levels, the incidence of death, injury and illness in the Australian construction industry has remained intransigently high, prompting an industry-led initiative to improve the occupational health and safety (OHS) performance of the Australian construction industry. The ‘Safer Construction’ project involves the development of an evidence-based Voluntary Code of Practice for OHS in the industry.

Relevância:

30.00% 30.00%

Publicador:

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Aiming at the shortage of prevailing prediction methods about highway truck conveyance configuration in over-limit freight research that transferring the goods attributed to over-limit portion to another fully loaded truck of the same configuration and developing the truck traffic volume synchronously, a new way to get accumulated probability function of truck power tonnage in basal year by highway truck classified by wheel and axle type load mass spectrum investigation was presented. Logit models were used to forecast overall highway freight diversion and single cargo tonnage diversion when the weight rules and strict of enforcement intensity of overload were changed in scheme year. Assumption that the probability distribution of single truck loadage should be consistent with the probability distribution of single goods freighted, the model describes the truck conveyance configuration in the future under strict over-limit prohibition. The model was used and tested in Highway Over-limit Research Project in Anhui by World Bank.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The management of main material prices of provincial highway project quota has problems of lag and blindness. Framework of provincial highway project quota data MIS and main material price data warehouse were established based on WEB firstly. Then concrete processes of provincial highway project main material prices were brought forward based on BP neural network algorithmic. After that standard BP algorithmic, additional momentum modify BP network algorithmic, self-adaptive study speed improved BP network algorithmic were compared in predicting highway project main prices. The result indicated that it is feasible to predict highway main material prices using BP NN, and using self-adaptive study speed improved BP network algorithmic is the relatively best one.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The highway express freight transportation (HEFT) is a new transportation organization form separated from the common freight transportation with economic development and incessant adjustment of highway transportation structure in China. At present, the phenomenon of inadaptability still exists in the HEFT system of China, from foundation structure like highways, parking lots and stations to transportation equipments and transportation organizing. In order to develop the HEFT system more rationally and effectively, we should start with the structure of the system, conform the resources existing, and consummate the freight transport system. In due course, relevant policies and measures to supervise, lead and support are necessary and important. This paper analyzes the existing problems of HEFT system in our country, based on its characteristics, development situation and adaptability, and presents the policy and measures of promoting and leading the development of the HEFT system.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Some new types of mathematical model among four key techno - economic indexes of highway rapid passenger through transportation were established based on the principles of transportation economics. According to the research on the feasible solutions to the associated parameters which were then compared to the actual value, found some limitation in the existing transport organization method. In order to conquer that, two new types of transport organization method, namely CD (Collecting and Distributing) Method and Relay Method were brought forward. What’s more, a further research was down to estimate their characteristics, such as feasibilities, operation flows, applicability fields, etc. This analysis proves the two methods can offset the shortage of rapid passenger through transportation. To ensure highway rapid passenger transport develop harmoniously, a three-stage development targets was suggested to fuse different organization methods.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In 2004, with the increasing overloading restriction requirements of society in Anhui, a provincial comprehensive overloading transportation survey has been developed to take evaluations on overloading actuality and enforcement efficiency with the support of the World Bank. A total of six site surveys were conducted at Hefei, Fuyang, Luan, Wuhu, Huainan and Huangshan Areas with four main contents respectively: traffic volume, axle load, freight information and registration information. Via statistical analysis on the survey data, conclusions were gained that: vehicle overloading are very universal and serious problems at arterial highways in Anhui now. The traffic loads have far exceeded the designed endure capacity of highways and have caused prevalent premature pavement damage, especially for rigid pavement. The overloading trucks are unimpeded engaged in highway freight transportation actually due to the disordered overloading enforcement strategies and the deficient inspecting technologies.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Since 1995 the buildingSMART International Alliance for Interoperability (buildingSMART)has developed a robust standard called the Industry Foundation Classes (IFC). IFC is an object oriented data model with related file format that has facilitated the efficient exchange of data in the development of building information models (BIM). The Cooperative Research Centre for Construction Innovation has contributed to the international effort in the development of the IFC standard and specifically the reinforced concrete part of the latest IFC 2x3 release. Industry Foundation Classes have been endorsed by the International Standards Organisation as a Publicly Available Specification (PAS) under the ISO label ISO/PAS 16739. For more details, go to http://www.tc184- sc4.org/About_TC184-SC4/About_SC4_Standards/ The current IFC model covers the building itself to a useful level of detail. The next stage of development for the IFC standard is where the building meets the ground (terrain) and with civil and external works like pavements, retaining walls, bridges, tunnels etc. With the current focus in Australia on infrastructure projects over the next 20 years a logical extension to this standard was in the area of site and civil works. This proposal recognises that there is an existing body of work on the specification of road representation data. In particular, LandXML is recognised as also is TransXML in the broader context of transportation and CityGML in the common interfacing of city maps, buildings and roads. Examination of interfaces between IFC and these specifications is therefore within the scope of this project. That such interfaces can be developed has already been demonstrated in principle within the IFC for Geographic Information Systems (GIS) project. National road standards that are already in use should be carefully analysed and contacts established in order to gain from this knowledge. The Object Catalogue for the Road Transport Sector (OKSTRA) should be noted as an example. It is also noted that buildingSMART Norway has submitted a proposal

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A number of intervention approaches have been developed to improve work-related driving safety. However, past interventions have been limited in that they have been data-driven, and have not been developed within a theoretical framework. The aim of this study is to present a theory-driven intervention. Based on the methodology developed by Ludwig and Geller (1991), this study evaluates the effectiveness of a participative education intervention on a group of work-related drivers (n = 28; experimental group n = 19, control n = 9). The results support the effectiveness of the intervention in reducing speeding over a six month period, while a non significant increase was found in the control group. The results of this study have important implications for organisations developing theory-driven interventions designed to improve work-related driving behaviour.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Safety Effectiveness Indicators (SEI) Project has used extensive research to determine what safety effectiveness measures can be developed by industry, for industry use to improve its safety performance. These indicators can measure how effectively the 13 safety management tasks1 (SMTs) selected for this workbook are undertaken. Currently, positive performance indicators (PPIs) are only able to measure the number of activities undertaken. They do not provide information on whether each activity is being undertaken effectively, and therefore do not provide data which can be used by industry to target areas of focus and improvement. The initial workbook contained six SMTs, and was piloted on various construction sites during August 2008. The workbook was refined through feedback from the pilot, and 13 SMTs were used in a field trial during the months of October, November and December 2008. The project team also carried out 12 focus groups in Brisbane, Canberra, Sydney and Melbourne during April, May and June 2008, and developed an initial format of this workbook through these groups and team workshops. Simplification of the language was a recurring theme, and we have attempted to do this throughout the project. The challenge has been to ensure we keep the descriptions short, to the point and relevant to all companies, without making them too specific. The majority of the construction industry participants also requested an alteration to the scale used, so a ‘Yes’/‘No’/’Not applicable’ format is used in this workbook. This workbook, based on industry feedback, is for use on site by various construction companies and contains 13 SMTs. However, you are invited to personalise the SEI tools to better suit your individual company and workplaces.