997 resultados para Emergence period
Resumo:
Report on a review of the Iowa Department of Transportation, Office of Aviation for the period January 1, 2014 through February 28, 2015
Resumo:
Report on a Review of the Iowa Homeland Security and Emergency Management Department, E911 Cost Data for the period July 1, 2012 through June 30, 2014
Resumo:
The objective of this work was to simulate maize leaf development in climate change scenarios at Santa Maria, RS, Brazil, considering symmetric and asymmetric increases in air temperature. The model of Wang & Engel for leaf appearance rate (LAR), with genotype-specific coefficients for the maize variety BRS Missões, was used to simulate tip and expanded leaf accumulated number from emergence to flag leaf appearance and expansion, for nine emergence dates from August 15 to April 15. LAR model was run for each emergence date in 100-year climate scenarios: current climate, and +1, +2, +3, +4 and +5°C increase in mean air temperature, with symmetric and asymmetric increase in daily minimum and maximum air temperature. Maize crop failure due to frost decreased in elevated temperature scenarios, in the very early and very late emergence dates, indicating a lengthening in the maize growing season in warmer climates. The leaf development period in maize was shorter in elevated temperature scenarios, with greater shortening in asymmetric temperature increases, indicating that warmer nights accelerate vegetative development in maize.
Resumo:
Report on a special investigation of the Clinton High School Band Boosters for the period August 1, 2014 through May 31, 2015
Resumo:
Report on a special investigation of the City of Harris for the period July 1, 2011 through September 30, 2014
Resumo:
Agreed-upon procedures report on the City of Whitten, Iowa for the period January 1, 2015 through December 31, 2015
Resumo:
Agreed-upon procedures report on the City of Granger, Iowa for the period July 1, 2014 through June 30, 2015
Resumo:
Agreed-upon procedures report on the City of Breda, Iowa for the period July 1, 2014 through June 30, 2015
Resumo:
Agreed-upon procedures report on the City of Ainsworth, Iowa for the period July 1, 2014 through June 30, 2015
Resumo:
Agreed-upon procedures report on the City of Victor, Iowa for the period July 1, 2014 through June 30, 2015
Resumo:
Agreed-upon procedures report on the City of Ely, Iowa for the period July 1, 2014 through June 30, 2015
Resumo:
Agreed-upon procedures report on the City of Remsen, Iowa and the Remsen Municipal Utilities for the period July 1, 2014 through June 30, 2015
Resumo:
Report on a review of selected general and application controls over the University of Northern Iowa’s eBusiness Payroll and Human Resources System for the period April 1, 2015 through May 27, 2015
Resumo:
Abstract
Resumo:
Examination report on the City of Central City, Iowa for the period July 1, 2014 through June 30, 2015