892 resultados para Collective memory construction


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper describes the instigation and development of an expert system to aid in the strategic planning of construction projects. The paper consists of four parts - the origin of the project, the development of the concepts needed for the proposed system, the building of the system itself, and assessment of its performance. The origin of the project is outlined starting with the Japanese commitment to 5th generation computing together with the increasing local reaction to theory based prescriptive research in the field. The subsequent development of activities via the Alvey Commission and the RICS in conjunction with Salford University are traced culminating in the proposal and execution of the first major expert system to be built for the UK construction industry, subsequently recognised as one of the most successful of the expert system projects commissioned under the Alvey programme

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Teachers of construction economics and estimating have for a long time recognised that there is more to construction pricing than detailed calculation of costs (to the contractor). We always get to the point where we have to say "of course, experience or familiarity of the market is very important and this needs judgement, intuition, etc". Quite how important is the matter in construction pricing is not known and we tend to trivialise its effect. If judgement of the market has a minimal effect, little harm would be done, but if it is really important then some quite serious consequences arise which go well beyond the teaching environment. Major areas of concern for the quantity surveyor are in cost modelling and cost planning - neither of which pay any significant attention to the market effect. There are currently two schools of thought about the market effect issue. The first school is prepared to ignore possible effects until more is known. This may be called the pragmatic school. The second school exists solely to criticise the first school. We will call this the antagonistic school. Neither the pragmatic nor the antagonistic schools seem to be particularly keen to resolve the issue one way or the other. The founder and leader of the antagonistic school is Brian Fine whose paper in 1974 is still the basic text on the subject, and in which he coined the term 'socially acceptable' price to describe what we now recognise as the market effect. Mr Fine's argument was then, and is since, that the uncertainty surrounding the contractors' costing and cost estimating process is such that the uncertainty surrounding the contractors' cost that it logically leads to a market-orientated pricing approach. Very little factual evidence, however, seems to be available to support these arguments in any conclusive manner. A further, and more important point for the pragmatic school, is that, even if the market effect is as important as Mr Fine believes, there are no indications of how it can be measured, evaluated or predicted. Since 1974 evidence has been accumulating which tends to reinforce the antagonists' view. A review of the literature covering both contractors' and designers' estimates found many references to the use of value judgements in construction pricing (Ashworth & Skitmore, 1985), which supports the antagonistic view in implying the existence of uncertainty overload. The most convincing evidence emerged quite by accident in some research we recently completed with practicing quantity surveyors in estimating accuracy (Skitmore, 1985). In addition to demonstrating that individual quantity surveyors and certain types of buildings had significant effect on estimating accuracy, one surprise result was that only a very small amount of information was used by the most expert surveyors for relatively very accurate estimates. Only the type and size of building, it seemed, was really relevant in determining accuracy. More detailed information about the buildings' specification, and even a sight to the drawings, did not significantly improve their accuracy level. This seemed to offer clear evidence that the constructional aspects of the project were largely irrelevant and that the expert surveyors were somehow tuning in to the market price of the building. The obvious next step is to feed our expert surveyors with more relevant 'market' information in order to assess its effect. The problem with this is that our experts do not seem able to verbalise their requirements in this respect - a common occurrence in research of this nature. The lack of research into the nature of market effects on prices also means the literature provides little of benefit. Hence the need for this study. It was felt that a clearer picture of the nature of construction markets would be obtained in an environment where free enterprise was a truly ideological force. For this reason, the United States of America was chosen for the next stage of our investigations. Several people were interviewed in an informal and unstructured manner to elicit their views on the action of market forces on construction prices. Although a small number of people were involved, they were thought to be reasonably representative of knowledge in construction pricing. They were also very well able to articulate their views. Our initial reaction to the interviews was that our USA subjects held very close views to those held in the UK. However, detailed analysis revealed the existence of remarkably clear and consistent insights that would not have been obtained in the UK. Further evidence was also obtained from literature relating to the subject and some of the interviewees very kindly expanded on their views in later postal correspondence. We have now analysed all the evidence received and, although a great deal is of an anecdotal nature, we feel that our findings enable at least the basic nature of the subject to be understood and that the factors and their interrelationships can now be examined more formally in relation to construction price levels. I must express my gratitude to the Royal Institution of Chartered Surveyors' Educational Trust and the University of Salford's Department of Civil Engineering for collectively funding this study. My sincere thanks also go to our American participants who freely gave their time and valuable knowledge to us in our enquiries. Finally, I must record my thanks to Tim and Anne for their remarkable ability to produce an intelligible typescript from my unintelligible writing.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Reports of immoral marketing practices i n the construction industry attract political, media and public but not much academic interest. This paper adopts a behavioural perspective and proposes a model for applying marketing ethics concepts and methods in the study of collusion in the construction contract market. An extensive multidisciplinary review of existing literature identified a lack of adequate conceptualisation of the mechanisms and decision making factors of collusive tendering. The process of developing the model is detailed in this paper. The objectives and methodology of the research project that tested the model are also outlined. The paper concludes with a brief note on the contributions and application of the proposed model.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Many countries face enormous development challenges in adapting to demographic change, urbanisation and emerging issues such as housing affordability and climate change. These challenges are best resolved in consultation with communities rather than in conflict with them. A rich tradition of research and intellectual frameworks exist in the fields of urban geography and planning to understand and manage community concerns during the pre-development approval stages of new projects. However current theoretical frameworks are inadequate in construction management and a new research agenda is needed to develop conceptual frameworks to guide thinking about the role of communities in the construction process. By discussing the components of such a model, it is concluded that this would require a fundamental shift in thinking which challenges traditional structuralist paradigms. A new constructivist paradigm is presented that conceives community consultation as a negotiation process which does not stop at the pre-development planning stages but which continues over the entire life of a project.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dynamic capability theory asserts that the learning capabilities of construction organisations influence the degree to which value-for-money (VfM) is achieved on collaborative projects. However, there has been little study conducted to verify this relationship. The evidence is particularly limited within the empirical context of infrastructure delivery in Australia. Primarily drawing on the theoretical perspectives of the resource-based view of the firm (e.g. Barney 1991), dynamic capabilities (e.g. Helfat et al. 2007), absorptive capacity (e.g. Lane et al. 2006) and knowledge management (e.g. Nonaka 1994), this paper conceptualises learning capability as a knowledge-based dynamic capability. Learning capability builds on the micro-foundations of high-order learning routines, which are deliberately developed by construction organisations for managing collaborative projects. Based on this conceptualisation of learning capability, an exploratory case study was conducted. The study investigated the operational and higher-order learning routines adopted by a project alliance team to successfully achieve VfM. The case study demonstrated that the learning routines of the alliance project were developed and modified by the continual joint learning activities of participant organisations. Project-level learning routines were found to significantly influence the development of organisational-level learning routines. In turn, the learning outcomes generated from the alliance project appeared to significantly influence the development of project management routines and contractual arrangements applied by the participant organisations in subsequent collaborative projects. The case study findings imply that the higher-order learning routines that underpin the learning capability of construction organisations have the potential to influence the VfM achieved on both current and future collaborative projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Growing community concerns about the ecological, social, cultural and economic impact of housing and urban projects poses new challenges for those who have to deliver them. It is important that these concerns are addressed as part of the community engagement processes on projects. Community engagement is traditionally perceived as the purview of planners and disconnected from the building construction process. This is despite most project approval processes mandating on-going community engagement over the project’s entire lifetime. There is evidence that point to a culture of ambiguity and ambivalence among building professionals about their roles, responsibilities and expectations of community engagement during the construction phase of projects. This has contributed to a culture of distrust between communities and the construction industry. There is a clear need to build capacity among building professionals to empower them as active participants in community engagement processes which can promote better project outcomes and minimise delays and conflicts. This paper describes a process that utilises the Theory of Planned Behaviour as a framework to equip building professionals with the skills they need to engage effectively with local communities during the construction phase of projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The acquisition and management of knowledge is the dominant source of organisational com-petitive advantage. As innovation processes in the management and procurement of construc-tion activities are becoming increasingly interactive, knowledge management (KM) has been widely recognised by construction organisations as an essential tool to be employed when dealing with growing complexity and cost of projects as well as increasing client demands. KM requires deliberate efforts by an organisation to maximise its performance through the acquisition, dissemination and leveraging of the organisation’s intellectual assets. The Hong Kong (HK) construction market has been described as one of the most open and globally competitive. This paper reports on KM practices within the HK construction industry, and through the analysis of a self-administered questionnaire survey, reveals managers’ opinions of the formal and informal KM practices that could be used to manage the flow of knowledge, and identifies the level of implementation within their organisations. The differences between managers’ perception and the actual state of implementation – as reported by the same man-agers – are statistically examined. The analysis leads to better understanding of how HK con-struction professionals currently manage organisational knowledge, and what areas for poten-tial improvement exist.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The generation of a correlation matrix from a large set of long gene sequences is a common requirement in many bioinformatics problems such as phylogenetic analysis. The generation is not only computationally intensive but also requires significant memory resources as, typically, few gene sequences can be simultaneously stored in primary memory. The standard practice in such computation is to use frequent input/output (I/O) operations. Therefore, minimizing the number of these operations will yield much faster run-times. This paper develops an approach for the faster and scalable computing of large-size correlation matrices through the full use of available memory and a reduced number of I/O operations. The approach is scalable in the sense that the same algorithms can be executed on different computing platforms with different amounts of memory and can be applied to different problems with different correlation matrix sizes. The significant performance improvement of the approach over the existing approaches is demonstrated through benchmark examples.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Knowledge is a commodity. It is a by-product of learning that involves the creation, sharing, processing and possible use of information in the mind of an individual. Knowledge management (KM) is, therefore, concerned with the effective implementation of such activities within the organisation. It is simply the process of leveraging organisational knowledge to deliver a long-term competitive advantage. This paper presents the results of an empirical research investigation into the interaction between different KM activities within the context of construction contracting organisations. The different KM activities include: responsiveness to the knowledge of business environment, knowledge acquisition, knowledge dissemination, and knowledge application. A questionnaire survey was administered to investigate the opinions of construction professionals regarding the intensity of activities currently implemented by their organisations to facilitate knowledge capturing, sharing and application. A total of 149 responses were then used to statistically examine the inter-relationships between the different KM activities as practised by contracting organisations in Hong Kong. The paper presents and discusses the survey findings and proposes recommendations for improving the effectiveness of current KM practices.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

China’s national construction industry is now preparing to face the challenges, and to seize the opportunities, resulting from China’s entry to the World Trade Organisation (WTO). With the foreign direct investment (FDI) hitting a record high of around US$52.7 billion in 2002, China is believed to have now surpassed the USA as the world’s favorite destination for foreign investment. This fact, coupled with the huge potential for infrastructure development, indicates that the relatively large proportion of FDI flowing into the national construction industry will continue to increase in the foreseeable future. Positive aspects of FDI flowing will definitely help forging new industrial capabilities for China’s construction industry, thus helping it to achieve the ambitious strategic targets set by the Government for exporting construction goods and services. To shed some light on the position of the national industry in the global economy, this paper briefly presents the current international standing of China’s construction industry and qualitatively appraises potential positive influences of, and challenges associated with, FDI on the national industry.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background: Anecdotal evidence from the infrastructure and building sectors highlights issues of alcohol and other drugs (AODs) and its association with safety risk on construction sites. Currently, there is no clear evidence on the prevalence and risk of AOD use among Australian construction workers and there is limited evidential guidance regarding how to effectively address such an issue. Aims: The current research aims to scientifically evaluate the use of AODs within the Australian construction industry in order to reduce the potential resulting safety and performance impacts and engender a cultural change in the workforce. A nationally consistent and collaborative approach across the workforce will be adopted. Methods: A national assessment of the use of AODs was conducted in participating organisations across three states. The World Health Organisation’s Alcohol Use Disorders Identification Test (AUDIT) was used to measure alcohol use. Illicit drug use, ‘readiness to change’, impediments to reducing impairment, feasibility of proposed interventions, and employee attitudes and knowledge regarding AOD was also measured through a combination of survey items and interviews. Through an educative approach and consultation with employers, employees, union groups and leaders in applied AOD research, this assessment was used to inform and support cultural change management of AOD use in the industry. Results: Results (n=494) indicate that as in the general population, a proportion of those sampled in the construction sector may be at risk of hazardous alcohol consumption. A total of 286 respondents (58%) scored above the cut-off cumulative score for risky or hazardous alcohol use. Other drug use was also identified as a major issue. Interview responses and input from all project partners is presented within a guiding principle framework for cultural change. Conclusions: Results support the need for evidence-based, comprehensive and tailored responses in the workplace. This paper will discuss the final results in the context of facilitating cultural change in the construction industry.

Relevância:

20.00% 20.00%

Publicador: