890 resultados para Code of Civil Procedure (CPC)


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Understanding the impacts of traffic and climate change on water quality helps decision makers to develop better policy and plans for dealing with unsustainable urban and transport development. This chapter presents detailed methodologies developed for sample collection and testing for heavy metals and total petroleum hydrocarbons, as part of a research study to investigate the impacts of climate change and changes to urban traffic characteristics on pollutant build-up and wash-off from urban road surfaces. Cadmium, chromium, nickel, copper, lead, iron, aluminium, manganese and zinc were the target heavy metals, and selected gasoline and diesel range organics were the target total petroleum hydrocarbons for this study. The study sites were selected to encompass the urban traffic characteristics of the Gold Coast region, Australia. An improved sample collection method referred to as ‘the wet and dry vacuum system’ for the pollutant build-up, and an effective wash-off plan to incorporate predicted changes to rainfall characteristics due to climate change, were implemented. The novel approach to sample collection for pollutant build-up helped to maintain the integrity of collection efficiency. The wash-off plan helped to incorporate the predicted impacts of climate change in the Gold Coast region. The robust experimental methods developed will help in field sample collection and chemical testing of different stormwater pollutants in build-up and wash-off.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This is the sixth part of a Letter from the Editor series where the results are presented of an ongoing research undertaken in order to investigate the dynamic of the evolution of the field of project management and the key trends. Dynamics of networks is a key feature in strategic diagrams analysis. The radical change in the configuration of a network between two periods, or the change at subnetwork level reflects the dynamic of science. I present here an example of subnetwork comparison over the four periods of time considered in this study. I will develop and discuss an example of subnetwork transformation in future Letter from the Editor article..

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This is the fifth part of a Letter From the Editor series where the results are presented of an ongoing research undertaken in order to investigate the dynamic of the evolution of the field of project management and the key trends. I present some general findings and the strategic diagrams generated for each of the time periods introduced herein and discuss what we can learn from them on a general standpoint. I will develop and discuss some detailed findings in future Letter From the Editor articles...

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to provide a summary description of the doctoral thesis investigating the field of project management (PM) deployment. Researchers will be informed of the current contributions within this topic and of the possible further investigations and researches. The decision makers and practitioners will be aware of a set of tools addressing the PM deployment with new perspectives. Design/methodology/approach – Research undertaken with the thesis is based on quantitative methods using time series statistics (time distance analysis) and comparative and correlation analysis aimed to better define and understand the PM deployment within and between countries or groups. Findings – The results suggest a project management deployment index (PMDI) to objectively measure the PM deployment based on the concept of certification. A proposed framework to empirically benchmark the PM deployment between countries by integrating the PMDI time series with the two dimensional comparative analysis of Sicherl. The correlation analysis within Hoftsede cultural framework shows the impact of the national culture dimensions on the PM deployment. The forecasting model shows a general continual growth trend of the PM deployment, with continual increase in the time distance between the countries. Research limitations/implications – The PM researchers are offered an empirical quantification on which they can construct further investigations and understanding of this phenomenon. The number of possible units that can be studied offers wide possibilities to replicate the thesis work. New researches can be undertaken to investigate further the contribution of other social or economical indicators, or to refine and enrich the definition of the PMDI indicator. Practical implications – These results have important implications on the PM deployment approaches. The PMDI measurements and time series comparisons facilitate considerably the measurement and benchmarking between the units (e.g. countries) and against targets, while the readiness setting of the studied unit (in terms of development and cultural levels) impacts the PM deployment within this country. Originality/value – This paper provides a summary of cutting-edge research work in the studied field of PM deployment and a link to the published works that researchers can use to help them understand the thesis research as well as how it can be extended.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Traffic safety studies demand more than what current micro-simulation models can provide as they presume that all drivers of motor vehicles exhibit safe behaviours. Several car-following models are used in various micro-simulation models. This research compares the mainstream car following models’ capabilities of emulating precise driver behaviour parameters such as headways and Time to Collisions. The comparison firstly illustrates which model is more robust in the metric reproduction. Secondly, the study conducted a series of sensitivity tests to further explore the behaviour of each model. Based on the outcome of these two steps exploration of the models, a modified structure and parameters adjustment for each car-following model is proposed to simulate more realistic vehicle movements, particularly headways and Time to Collision, below a certain critical threshold. NGSIM vehicle trajectory data is used to evaluate the modified models performance to assess critical safety events within traffic flow. The simulation tests outcomes indicate that the proposed modified models produce better frequency of critical Time to Collision than the generic models, while the improvement on the headway is not significant. The outcome of this paper facilitates traffic safety assessment using microscopic simulation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

As evidenced with the 2011 floods the state of Queensland in Australia is quite vulnerable to this kind of disaster. Climate change will increase the frequency and magnitude of such events and will have a variety of other impacts. To deal with these governments at all levels need to be prepared and work together. Since most of the population of the state is located in the coastal areas and these areas are more vulnerable to the impacts of climate change this paper examines climate change adaptation efforts in coastal Queensland. The paper is part of a more comprehensive project which looks at the critical linkages between land use and transport planning in coastal Queensland, especially in light of increased frequencies of cyclonic activity and other impacts associated with climate change. The aim is improving coordination between local and state government in addressing land use and transport planning in coastal high hazard areas. By increasing the ability of local governments and state agencies to coordinate planning activities, we can help adapt to impacts of climate change. Towards that end, we will look at the ways that these groups currently interact, especially with regard to issues involving uncertainty related to climate change impacts. Through surveys and interviews of Queensland coastal local governments and state level planning agencies on how they coordinate their planning activities at different levels as well as how much they take into account the linkage of transportation and land use we aim to identify the weaknesses of the current planning system in responding to the challenges of climate change adaptation. The project will identify opportunities for improving the ways we plan and coordinate planning, and make recommendations to improve resilience in advance of disasters so as to help speed up recovery when they occur.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction and demolition (C&D) waste occupies the largest share of overall waste generation in many countries. However, waste management practices and outcomes may differ between countries. For instance, in Australia, C&D waste recovery is continuously improving during the last years but the amount of C&D waste increases every year, as there has been little improvement in waste avoidance and minimization. In contrast, in Germany, waste generation remains constant over many years despite the continuous economic growth. The waste recycling rate in Germany is one of the highest in the world. However, most waste recycled is from demolition work rather than from waste generated during new construction. In addition, specific laws need to be developed to further reduce landfill of non-recycled waste. Despite of the differences, C&D waste generation and recovery in both countries depend on the effectiveness of the statutory framework, which regulates their waste management practices. This is an issue in other parts of the world as well. Therefore countries can learn from each other to improve their current statutory framework for C&D waste management. By taking Germany and Australia as an example, possible measures to improve current practices of C&D waste management through better statutory tools are identified in this paper. After providing an overview of the statutory framework of both countries and their status in waste generation and recovery, a SWOT analysis is conducted to identify strengths, weaknesses, opportunities and threats of the statutory tools. Recommendations to improve the current statutory frameworks, in order to achieve less waste generation and more waste recovery in the construction industry are provided for the German and Australian government and they can also be transferred to other countries.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Airports are currently being pressured to operate in a more environmentally-sensitive manner; as a response, airports have integrated environmental policies into their operations. However, environmental concerns regarding automobile traffic and related emissions have yet to be addressed. While the automobile is the dominant air passenger ground transportation mode at US airports, services facilitating automobile usage including public parking and car rentals are a major airport revenue source. Less than 20 US hub airports have direct access to rail-based transportation modes. New rail transportation projects serving additional airports are either being consideration or under construction. Regardless of whether an airport has direct access to rail-based transportation modes, the air passenger ground transportation modal split at US airports remain low in comparison to those in Asia and Europe. The high cost of providing additional US airports with direct rail connections in an era of severe governmental budgetary cutbacks is making the “build it and they will come” mindset untenable. Governmental policies are but one factor determining whether programs increasing transit usage results in automobile traffic reductions and related emissions. This study reveals that a significant percentage of the busiest US airports do not have policies fostering increases in the air passenger ground transportation modal split. A case study of one US airport is presented that has successfully adopted a transit first policy to achieve a high air passenger ground transportation modal split and facilitate the availability of rail-based transportation services.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Deterministic transit capacity analysis applies to planning, design and operational management of urban transit systems. The Transit Capacity and Quality of Service Manual (1) and Vuchic (2, 3) enable transit performance to be quantified and assessed using transit capacity and productive capacity. This paper further defines important productive performance measures of an individual transit service and transit line. Transit work (p-km) captures the transit task performed over distance. Passenger transmission (p-km/h) captures the passenger task delivered by service at speed. Transit productiveness (p-km/h) captures transit work performed over time. These measures are useful to operators in understanding their services’ or systems’ capabilities and passenger quality of service. This paper accounts for variability in utilized demand by passengers along a line and high passenger load conditions where passenger pass-up delay occurs. A hypothetical case study of an individual bus service’s operation demonstrates the usefulness of passenger transmission in comparing existing and growth scenarios. A hypothetical case study of a bus line’s operation during a peak hour window demonstrates the theory’s usefulness in examining the contribution of individual services to line productive performance. Scenarios may be assessed using this theory to benchmark or compare lines and segments, conditions, or consider improvements.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Client owners usually need an estimate or forecast of their likely building costs in advance of detailed design in order to confirm the financial feasibility of their projects. Because of their timing in the project life cycle, these early stage forecasts are characterized by the minimal amount of information available concerning the new (target) project to the point that often only its size and type are known. One approach is to use the mean contract sum of a sample, or base group, of previous projects of a similar type and size to the project for which the estimate is needed. Bernoulli’s law of large numbers implies that this base group should be as large as possible. However, increasing the size of the base group inevitably involves including projects that are less and less similar to the target project. Deciding on the optimal number of base group projects is known as the homogeneity or pooling problem. A method of solving the homogeneity problem is described involving the use of closed form equations to compare three different sampling arrangements of previous projects for their simulated forecasting ability by a cross-validation method, where a series of targets are extracted, with replacement, from the groups and compared with the mean value of the projects in the base groups. The procedure is then demonstrated with 450 Hong Kong projects (with different project types: Residential, Commercial centre, Car parking, Social community centre, School, Office, Hotel, Industrial, University and Hospital) clustered into base groups according to their type and size.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to examine the quality of service of a South East Asian country's military facilities management organisation. Design/methodology/approach – An interview survey and questionnaire survey were used to obtain a description and summary of stakeholders’ expectations and the extent to which they were being satisfied by the services provided. Findings – The method provides a useful means of identifying and prioritising varying expectations between stakeholder groups and of indicating any mismatch in expectations in the management of military facilities. Social implications – The development and use of a method to test and improve the effectiveness and efficiency of the management of military facilities helps in providing better value for money. Originality/value – In addition to re-affirming Parasuraman's overall dimensions of service expectation, the empirical summary of the stakeholders’ expectations obtained in this way is of practical value for the service provider in developing a strategy for expectation management. For the case studied, it is also apparent that although the current processes in service delivery are well understood by all involved stakeholders, there is a need for further improvement with regards to their expectation levels. It is also one of the very few reported studies on the management of military facilities.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Saudi Arabia experiences housing shortage for mid and low-income families, which is caused by rapid population growth. This condition is worsened by the fact that the current housing supply has problems in meeting both sustainable requirements and cultural needs of those families. This paper aims to investigate the link between the unique conservative Saudi culture and the design of sustainable housing, while keeping the housing cost affordable for mid and low-income families. The paper is based on a review of literatures on the issues of the Islamic culture and how can they be integrated into the design process of a Saudi house. Findings from literature reveiw suggest several design requirements for accommodating the conservative Saudi Culture in low cost sustainable houses. Such requirements include the implementation of proper usage of windows, and house orientation with a courtyard inside rather than facing the main street will provide natural ventilation while maintaining privacy. The main contribution to the body of knowledge is that this is a new approach to sustainable housing in Saudi Arabia considering not only energy use and architectural design issues but also socio-cultural issues as an essential part of sustainability.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper is concerned with applying a particle-based approach to simulate the micro-level cellular structural changes of plant cells during drying. The objective of the investigation was to relate the micro-level structural properties such as cell area, diameter and perimeter to the change of moisture content of the cell. Model assumes a simplified cell which consists of two basic components, cell wall and cell fluid. The cell fluid is assumed to be a Newtonian fluid with higher viscosity compared to water and cell wall is assumed to be a visco-elastic solid boundary located around the cell fluid. Cell fluid is modelled with Smoothed Particle Hydrodynamics (SPH) technique and for the cell wall; a Discrete Element Method (DEM) is used. The developed model is two-dimensional, but accounts for three-dimensional physical properties of real plant cells. Drying phenomena is simulated as fluid mass reductions and the model is used to predict the above mentioned structural properties as a function of cell fluid mass. Model predictions are found to be in fairly good agreement with experimental data in literature and the particle-based approach is demonstrated to be suitable for numerical studies of drying related structural deformations. Also a sensitivity analysis is included to demonstrate the influence of key model parameters to model predictions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The growing awareness of sustainability issues around the world has put extensive pressure on the construction industry to improve its sustainable practice. Sustainability principles need to be applied to not just during design and construction phase but the entire life cycle of a construction project. Compared to sustainability endeavours on earlier development phases, the pace to implement sustainability agenda during the operation and maintenance phase has not been as fast during past practices of facilities management (FM). Literature study suggests that sustainable practices in FM activities can bring substantial benefits such as reducing energy consumptions and waste, while increasing productivity, financial return and standing in the community. It also suggests several barriers which inhibit the implementation of sustainability in FM practices, including the lack of knowledge, discrepancy between capability and skills, and unwillingness of the FM personnel and organizations to adapt to new routines in order to implement sustainability in their business. The capabilities of FM personnel and organizations were regarded as the key enablers in managing sustainability knowledge. In a sustainable development context, capabilities are vital to the fostering of competency in an organization to innovate in a more sustainable way and support the agenda in an organization. Additionally, research which focused on people’s capabilities and skills is still lagging behind the efforts to develop guidelines, technical manuals and knowledge portals. Therefore, it is beneficial to explore the issues of capabilities in dealing with the implementation of sustainable practices in FM. This paper introduces a research project which is aimed at establishing a knowledge capabilities framework for promoting sustainability measures in FM practices. It will explore and highlight challenges to integrate sustainability as well as the personnel and organizational capabilities that are vital in dealing with knowledge issues in implementing sustainability agenda in FM practices. The expected outcome of this research has the potential to further sustainability endeavours in FM practices, while providing a useful source of knowledge to the FM personnel and organizations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the era of global knowledge economy, urban regions—seeking to increase their competitive edge, become destinations for talent and investment, and provide prosperity and quality of life to their inhabitants—have little chance achieving their development goals without forming effective knowledge-based urban development strategies. This paper aims to shed light on the planning and development processes of the knowledge-based urban development phenomenon with respect to the construction of knowledge community precincts aimed at making space for knowledge generation and place for knowledge communities. Following to a thorough review of the literature on knowledge-based urban development and strategic asset-based planning, the paper undertakes policy and best practice analyses to learn from the planning and development processes of internationally renowned knowledge community precincts—from Copenhagen, Eindhoven and Singapore. In the light of the analyses findings, this paper scrutinises major Australian knowledge community precinct initiatives—from Sydney, Melbourne and Brisbane—to better understand the dynamics of national practices, and benchmark them against the international best practice cases. The paper concludes with a discussion on the study findings and recommendations for successfully establishing space and place for both knowledge economy and society in Australian cities.