986 resultados para house projects
Resumo:
Silchester is the site of a major late Iron Age and Roman town (Calleva Atrebatum), situated in northern Hampshire (England (UK)) and occupied between the late first century BC and the fifth or sixth century AD. Extensive evidence of the nature of the buildings and the plan of the town was obtained from excavations undertaken between 1890 and 1909. The purpose of this study was to use soil geochemical analyses to reinforce the archaeological evidence particularly with reference to potential metal working at the site. Soil analysis has been used previously to distinguish different functions or land use activity over a site and to aid identification and interpretation of settlement features (Entwistle et al., 2000). Samples were taken from two areas of the excavation on a 1-metre grid. Firstly from an area of some 500 square metres from contexts of late first/early second century AD date throughout the entirety of a large 'town house' (House 1) from which there was prima facie evidence of metalworking.
Resumo:
Research pertaining to children's geographies has mainly focused on children's physical experiences of space, with their 'imagined geographies' receiving far less attention. The few studies of children's imagined geographies that exist tend to focus on children's national identities and their understanding of distant places. However, children's lives are not necessarily static and they often move between places. Research has not so far considered children's images of these transitional spaces or how such images are constructed. Through an examination of over 800 thematic drawings and stories, regarding 'moving house, produced by children aged 10-17 years in urban and rural communities of Lesotho and Malawi, this paper explores southern African children's representations of migration. The research considers how ideas of migration are culturally-constructed based on notions of family, home and kinship, particularly in relation to the fluid family structure characteristic of most southern African societies. The results suggest that most children imagine migration as a household rather than an individual process.. rarely including micro -migrations between extended family households in their drawings. Further, children's images of migration are place-rooted in everyday life experiences. Their representations concentrate on the reasons for migration, both negative and positive, which are specifically related to their local social and environmental situations and whether house moves take place locally or over longer distances. The paper concludes by exploring the implications of these conceptualisations of moving house for children's contemporary migration experiences, particularly in light of changing family structures due to the effects of the HIV/AIDS pandernic. (c) 2005 Elsevier Ltd. All rights reserved
Resumo:
A systematic technique for identifying the environments of construction projects is described. It provides a method for isolating the major variables surrounding construction projects, and is briefly applied to the industries of Britain and Jamaica to illustrate its application. From this, it is inferred that the environment of a Jamaican construction project in systems terms is broadly similar to the environment of a construction project in Britain.
Resumo:
The principles of organization theory are applied to the organization of construction projects. This is done by proposing a framework for modelling the whole process of building procurement. This consists of a framework for describing the environments within which construction projects take place. This is followed by the development of a series of hypotheses about the organizational structure of construction projects. Four case studies are undertaken, and the extent to which their organizational structure matches the model is compared to the level of success achieved by each project. To this end there is a systematic method for evaluating the success of building project organizations, because any conclusions about the adequacy of a particular organization must be related to the degree of success achieved by that organization. In order to test these hypotheses, a mapping technique is developed. The technique offered is a development of a technique known as Linear Responsibility Analysis, and is called "3R analysis" as it deals with roles, responsibilities and relationships. The analysis of the case studies shows that they tended to suffer due to inappropriate organizational structure. One of the prevailing problems of public sector organization is that organizational structures are inadequately defined, and too cumbersome to respond to environmental demands on the project. The projects tended to be organized as rigid hierarchies, particularly at decision points, when what was required was a more flexible, dynamic and responsive organization. The study concludes with a series of recommendations; including suggestions for increasing the responsiveness of construction project organizations, and reducing the lead-in times for the inception periods.
Resumo:
An overview of organization in the construction industry is identified from plans of work published in the UK. This provides a basis for identifying the essential steps through which any construction project must pass. It is shown that all construction projects pass through a set of stages of work, consisting of inception, feasibility, scheme design, detail design, contract formation, construction and commissioning. Although there may be changes to the sequence and importance of these stages, their identification helps in making judgements about organizational structure on construction projects.
Resumo:
Patterns of communication and behaviour emerge within a construction project in response to a construction crisis. This paper investigates, within a grounded theory framework, the nature of these patterns, the sociological and psychological forces which shape them and their relationship with crisis management efficiency. A grounded theory is presented in four parts. The first part conceives a construction crisis as a period of social instability, arising from conflicting interest groups, seeking to exercise power in the pursuit of social structures which suit their political and economic interests. The second part sees a construction crisis as a de-sensitizing phenomenon which results in a period of behavioural instability and conflict which is self-perpetuating. The third part cites social structure as an important influence upon construction crisis management efficiency, in determining the efficiency of information flow, and the level of uncertainty between those affected. The fourth part points to the in-built defence mechanisms which construction crises have and to three managerial ironies which make construction crisis management difficult.
Resumo:
The cost of tendering in the construction industry is widely suspected to be excessive, but there is little robust empirical evidence to demonstrate this. It also seems that innovative working practices may reduce the costs of undertaking construction projects and the consequent improvement in relationships should increase overall value for money. The aim of this proposed research project is to develop mechanisms for measuring the true costs of tendering based upon extensive in-house data collection undertaken in a range of different construction firms. The output from this research will enable all participants in the construction process to make better decisions about how to select members of the team and identify the price and scope of their obligations.
Resumo:
Standard form contracts are typically developed through a negotiated consensus, unless they are proffered by one specific interest group. Previously published plans of work and other descriptions of the processes in construction projects tend to focus on operational issues, or they tend to be prepared from the point of view of one or other of the dominant interest groups. Legal practice in the UK permits those who draft contracts to define their terms as they choose. There are no definitive rulings from the courts that give an indication as to the detailed responsibilities of project participants. The science of terminology offers useful guidance for discovering and describing terms and their meanings in their practical context, but has never been used for defining terms for responsibilities of participants in the construction project management process. Organizational analysis enables the management task to be deconstructed into its elemental parts in order that effective organizational structures can be developed. Organizational mapping offers a useful technique for reducing text-based descriptions of project management roles and responsibilities to a comparable basis. Research was carried out by means of a desk study, detailed analysis of nine plans of work and focus groups representing all aspects of the construction industry. No published plan of work offers definitive guidance. There is an enormous amount of variety in the way that terms are used for identifying responsibilities of project participants. A catalogue of concepts and terms (a “Terminology”) has been compiled and indexed to enable those who draft contracts to choose the most appropriate titles for project participants. The purpose of this terminology is to enable the selection and justification of appropriate terms in order to help define roles. The terminology brings an unprecedented clarity to the description of roles and responsibilities in construction projects and, as such, will be helpful for anyone seeking to assemble a team and specify roles for project participants.
Resumo:
The level of insolvencies in the construction industry is high, when compared to other industry sectors. Given the management expertise and experience that is available to the construction industry, it seems strange that, according to the literature, the major causes of failure are lack of financial control and poor management. This indicates that with a good cash flow management, companies could be kept operating and financially healthy. It is possible to prevent failure. Although there are financial models that can be used to predict failure, they are based on company accounts, which have been shown to be an unreliable source of data. There are models available for cash flow management and forecasting and these could be used as a starting point for managers in rethinking their cash flow management practices. The research reported here has reached the stage of formulating researchable questions for an in-depth study including issues such as how contractors manage their cash flow, how payment practices can be managed without damaging others in the supply chain and the relationships between companies" financial structures and the payment regimes to which they are subjected.
Resumo:
Within the Information Technology degree programme of the University of Reading, the students undertake a major project in their final year. The module is both a hurdle to an honours degree and significant in terms of assessment weighting. The two year history so far has shown that bad citation and plagiarism are issues, and in one case called for the due referral of a project report. In the light of experience to date, we are focusing firstly on plagiarism prevention, giving generic advice on report writing and citation practice, and secondly on detection. In the longer term, I believe we need to reflect on what capabilities we should be creating in our undergraduates and therefore what and how we should be assessing them.
Resumo:
Presentation on pre-emption, detection and redirection in the context of the contract cheating form of plagiarism.
Resumo:
Goal modelling is a well known rigorous method for analysing problem rationale and developing requirements. Under the pressures typical of time-constrained projects its benefits are not accessible. This is because of the effort and time needed to create the graph and because reading the results can be difficult owing to the effects of crosscutting concerns. Here we introduce an adaptation of KAOS to meet the needs of rapid turn around and clarity. The main aim is to help the stakeholders gain an insight into the larger issues that might be overlooked if they make a premature start into implementation. The method emphasises the use of obstacles, accepts under-refined goals and has new methods for managing crosscutting concerns and strategic decision making. It is expected to be of value to agile as well as traditional processes.